ML061880165
ML061880165 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/06/2006 |
From: | Office of Nuclear Reactor Regulation |
To: | |
L. Mark Padovan, LPL3-1 | |
Shared Package | |
ML061660205 | List: |
References | |
TAC MD0196 | |
Download: ML061880165 (13) | |
Text
C. This license shall be deemed to contain and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) NMC is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) The Technical Specifications contained in Appendix A, as revised through Amendment No. 223 , and the Environmental Protection Plan contained in Appendix B are hearby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) NMC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SERs dated 09/01/78, 03/19/80, 02/10181, 05126/83, 07/12/85, 01/29/86, 12/03/87, and 05/19/89 and subject to the following provisions:
- a. NMC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- b. NMC may alter specific features of the approved fire protection program provided:
- Such changes do not result in failure to complete the fire protection program as approved by the Commission. NMC shall maintain in auditable form, a current record of all such changes, including an analysis of the effects of the change on the fire protection program and shall make such records available to the Commission Inspectors upon request. All changes to the approved program shall be reported along with the FSAR revision as required by 10 CFR 50.71 (e); and
- Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided interim compensatory measures are implemented.
(4) Upon implementation of Amendment No. 189, the schedule for performance of new or revised surveillance requirements (SRs) shall be as follows:
- For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
Amendment No. 223
Definitions 1.1 1.1 Definitions LEAKAGE a. Identified LEAKAGE (continued)
- 2. LEAKAGE into the containment atmosphere from sources that are both specifically located and known not to interfere with the operation of leakage detection systems and not to be pressure boundary LEAKAGE; and
- 3. Primary Coolant System (PCS) LEAKAGE through a Steam Generator to the Secondary System (primary I to secondary LEAKAGE).
- b. Unidentified LEAKAGE All LEAKAGE (except Primary Coolant Pump seal leakoff) that is not identified LEAKAGE;
- c. Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a nonisolable fault in an PCS component body, I.
pipe wall, or vessel wall.
MODE A MODE shall correspond to any one inclusive combination of core reactivity condition, power level, average primary coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.
OPERABLE - OPERABILITY A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s).
Palisades Nuclear Plant 1.1-4 Amendment No. 489 223
PCS Operational LEAKAGE 3.4.13 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.13 PCS Operational LEAKAGE LCO 3.4.13 PCS operational LEAKAGE shall be limited to:
- a. No pressure boundary LEAKAGE;
- b. 1 gpm unidentified LEAKAGE; C. 10 gpm identified LEAKAGE; and
- d. 150 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. PCS operational LEAKAGE not within limits A.1 Reduce LEAKAGE to within limits.
4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> I for reasons other than pressure boundary LEAKAGE or primary to I
secondary leakage.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Pressure boundary LEAKAGE exists.
OR Primary to secondary LEAKAGE not within limit.
Palisades Nuclear Plant 3.4.13-1 Amendment No. 489 223
PCS Operational LEAKAGE 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 -- - -NOTES --- NOTE--
- 1. Not required to be performed in MODE 3 or 4 Only required to be until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of steady state operation. performed during steady state
- 2. Not applicable to primary to secondary operation LEAKAGE.
Verify PCS operational LEAKAGE is within limits 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> by performance of PCS water inventory balance.
SR 3.4.13.2 - NOTE Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
Verify primary to secondary LEAKAGE is _< 150 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> gallons per day through any one SG.
Palisades Nuclear Plant 3.4.13-2 Amendment No. 489 223
SG Tube Integrity 3.4.17 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.17 Steam Generator (SG) Tube Integrity LCO 3.4.17 SG tube integrity shall be maintained.
AND All SG tubes satisfying the tube repair criteria shall be plugged in accordance with the Steam Generator Program.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS SNOTE-Separate Condition entry is allowed for each SG tube.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SG tubes A.1 Verify tube integrity of the 7 days satisfying the tube repair affected tube(s) is criteria and not plugged maintained until the next in accordance with the refueling outage or SG Steam Generator tube inspection.
Program.
AND A.2 Plug the affected tube(s) in Prior to entering accordance with the Steam MODE 4 following the Generator Program. next refueling outage or SG tube inspection B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR SG tube integrity not maintained.
Palisades Nuclear Plant 3.4.17-1 Amendment Ncý23
SG Tube Integrity 3.4.17 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.17.1 Verify SG tube integrity in accordance with the In accordance Steam Generator Program. with the Steam Generator Program SR 3.4.17.2 Verify that each inspected SG tube that satisfies the Prior to entering tube repair criteria is plugged in accordance with the MODE 4 following Steam Generator Program. a SG tube inspection Palisades Nuclear Plant 3.4.17-2 Amendment No.223
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.7 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
- a. Testing frequencies specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda (B&PV Code) as follows:
B&PV Code terminology Required interval for inservice testing for performing inservice activities testing activities Weekly
- 7 days Monthly < 31 days Quarterly or every 3 months < 92 days Semiannually or every 6 months
- 184 days Every 9 months < 276 days Yearly or annually _*366 days Biennially or every 2 years
- 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required intervals for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the B&PV Code shall be construed to supersede the requirements of any Technical Specification.
5.5.8 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:
- a. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes.
Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.
- b. Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.
Palisades Nuclear Plant 5.0-11 Amendment No. 489 223
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.8 Steam Generator (SG) Program b*. Performance criteria forSG tube integrity. (continued)
- 1. Structural integrity performance criterion: All in-service SG tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specification) and design basis accidents. This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine ifthe associated loads contribute significantly to burst or collapse. Inthe assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
- 2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Leakage is not to exceed 0.3 gpm.
- 3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "PCS Operational LEAKAGE."
- c. Provisions for SG tube repair criteria. Tubes found by inservice inspection
'to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to Palisades Nuclear Plant 5.0-12 Amendment No. 489 223
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.8 Steam Generator (SG) Program
- d. Provisions for SG tube inspections. (continued) determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
- 2. Inspect 100% of the tubes at sequential periods of 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs. No SG shall operate for more than 24 effective full power months or one refueling outage (whichever is less) without being inspected.
- 3. If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
- e. Provisions for monitoring operational primary to secondary LEAKAGE.
Palisades Nuclear Plant 5.0-13 Amendment No. 489 223
Programs and Manuals 5.5 5.5 Programs and Manuals This page retained for page numbering Palisades Nuclear Plant 5.0-14 Amendment No. 4-9 223
Programs and Manuals 5.5 5.5 Programs and Manuals This page retained for page numbering Palisades Nuclear Plant 5.0-15 Amendment No. 489 223
Programs and Manuals 5.5 5.5 Programs and Manuals This page retained for page numbering Palisades Nuclear Plant 5.0-16 Amendment No. 489 223
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 Post Accident Monitorinq Report When a report is required by LCO 3.3.7, "Post Accident Monitoring Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels to OPERABLE status.
5.6.7 Containment Structural Integrity Surveillance Report Reports shall be submitted to the NRC covering Prestressing, Anchorage, and Dome Delamination tests within 90 days after completion of the tests.
5.6.8 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:
- a. The scope of inspections performed on each SG,
- b. Active degradation mechanisms found,
- c. Nondestructive examination techniques utilized for each degradation mechanism,
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications,
- e. Number of tubes plugged during the inspection outage for each active degradation mechanism,
- f. Total number and percentage of tubes plugged to date,
- g. The results of condition monitoring, including the results of tube pulls and in-situ testing, and
- h. The effective plugging percentage for all plugging in each SG.
Palisades Nuclear Plant 5.0-28 Amendment No. 489 223