MONTHYEARML0501403722005-01-11011 January 2005 Technical Specifications, Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors (MC1903) Project stage: Other ML0433602762005-01-11011 January 2005 License Amendment 221, Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors (MC1903) Project stage: Approval ML0505600162005-02-22022 February 2005 Corrected Technical Specification Pages, Amendment No. 221 Project stage: Other ML0504901442005-02-22022 February 2005 Correction to Amendment No. 221 for Palisades Nuclear Power Plant Project stage: Other 2005-01-11
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML22039A1982022-05-13013 May 2022 Issuance of Amendment No. 272 Permanently Defueled Technical Specifications ML21152A1122021-06-0101 June 2021 Page Change Instructions and Retyped Pages for the Palisades Plant Appendix a Permanently Defueled Technical Specifications and Appendix B Environmental Protection Plan ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19107A0532019-05-13013 May 2019 Issuance of Amendment No. 268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement PNP 2019-004, License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b2019-03-28028 March 2019 License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML18346A2872018-12-12012 December 2018 Appendix a to Provisional Operating License DPR-20, Technical Specifications for the Palisades Plant, Consumers Power Company, Docket No 50-255 ML18344A2512018-12-10010 December 2018 Improved Technical Specifications, Volume 5, Chapter 3.0 ML18039A2442018-02-27027 February 2018 Issuance of Amendment License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications ML17121A5102017-06-0808 June 2017 Issuance of Amendment License Amendment Request for Editorial and Administrative Changes to Technical Specifications ML16078A0682016-05-0202 May 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML15103A0592015-05-18018 May 2015 Issuance of Amendment Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiatives 6B and 6C. ML15007A1912015-02-27027 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14283A2872014-10-22022 October 2014 Issuance of Amendment Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process PNP 2014-072, 2014 Steam Generator Tube Inspection Report2014-08-0505 August 2014 2014 Steam Generator Tube Inspection Report ML13101A0942013-04-12012 April 2013 Correction to Amendment No. 249 Regarding Change to the Entergy QAPM and Associated Technical Specifications Regarding Staff Qualifications CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers2012-09-0606 September 2012 License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers ML1207400812012-04-23023 April 2012 Issuance of Amendment to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML1206004152012-03-0202 March 2012 Correction to Amendment No. 244 Regarding Technical Specification Change to Calculated Peak Containment Internal Pressure PNP 2012-005, License Amendment Request - Replacement of Spent Fuel Pool Region 1 Storage Racks2012-02-28028 February 2012 License Amendment Request - Replacement of Spent Fuel Pool Region 1 Storage Racks ML11362A4682012-01-27027 January 2012 License Amendment, Issuance of Amendment No. 246 to Revise TS Sections 3.7.16 and 4.3 Regarding Fuel Storage Criticality PNP 2011-058, License Amendment Request to Revise Calculated Peak Containment Internal Pressure2011-08-16016 August 2011 License Amendment Request to Revise Calculated Peak Containment Internal Pressure ML1115701362011-07-26026 July 2011 License Amendment, Emergency Diesel Generator Fuel Oil and Lube Oil Systems PNP 2011-002, License Amendment Request for Spent Fuel Pool Region I Criticality2011-01-31031 January 2011 License Amendment Request for Spent Fuel Pool Region I Criticality ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0833606192008-11-25025 November 2008 License Amendment Request for Spent Fuel Pool Region I Criticality ML0826801552008-09-22022 September 2008 License Amendment Request Application for Licensee Name Changes ML0824605502008-08-28028 August 2008 License Amendment Request: Changes to Technical Specification Administrative Controls Section ML0810700492008-04-15015 April 2008 Technical Specification 5.5.7, Inservice Testing Program Tac No. MD5713) ML0810700612008-04-0404 April 2008 National Pollutant Discharge Elimination System (NPDES) Application for Permit Renewal ML0805200082008-02-20020 February 2008 Revised Technical Specifications, Regarding Control Room Envelope Habitability in Accordance with Technical Specification Task Force-448, (TSTF-448), Revision 3, Using the Consolidated Line Item Improvement Process ML0803202842008-01-31031 January 2008 License Amendment Request to Support Use of M5 Alloy ML0728500762007-10-0404 October 2007 Tech Spec Page for Amendment 228 Proposal to Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity ML0727600042007-10-0202 October 2007 Technical Specifications, Issuance of Amendment Replacement of Containment Sump Buffer ML0727400132007-09-28028 September 2007 Technical Specifications, Implemented Alternative Radiological Source Term ML0723304672007-08-21021 August 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0723203922007-08-20020 August 2007 Response to Request for Additional Information - License Amendment Request for Replacement of Containment Sump Buffer ML0711303562007-04-18018 April 2007 Palisades, License Amendment Request: Emergency Core Cooling System Surveillance Requirement ML0709901082007-04-0606 April 2007 Tech Spec Page 4.0-1 Re Design Features ML0707406532007-03-15015 March 2007 License Amendment Request: Changes to Technical Specification Use and Application and Administrative Controls Sections ML0706400582007-02-27027 February 2007 Response to Request for Additional Information Regarding Proposed C* License Amendment Request for Steam Generator Tube Repair in the Tubesheet ML0701100532007-01-10010 January 2007 Facility Operating License DPR-20, Appendix a (Technical Specifications) ML0618801652006-07-0606 July 2006 Technical Specification Pages Re Steam Generator ML0609604662006-03-29029 March 2006 2005 Annual Radioactive Effluent Release and Waste Disposal Report, Palisades ML0608705662006-03-27027 March 2006 Tech Spec Page for Amendment 222 Revised Fuel Assembly Growth Model L-HU-06-001, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity2006-02-16016 February 2006 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0505600162005-02-22022 February 2005 Corrected Technical Specification Pages, Amendment No. 221 ML0501403722005-01-11011 January 2005 Technical Specifications, Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors (MC1903) ML0501403852005-01-10010 January 2005 Tech Spec Pages for Amendment 220 Deletion of Requirements for Submittal of Occupational Radiation and Monthly Operating Reports 2023-12-27
[Table view] |
Text
PAM Instrumentation 3.3.7 3.3 INSTRUMENTATION 3.3.7 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.7 The PAM instrumentation for each Function in Table 3.3.7-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE------
Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel channel to OPERABLE inoperable. status.
B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.6.
met.
C. One or more Functions C.1 Restore one channel to 7 days with two required channels OPERABLE status.
inoperable.
Palisades Nuclear Plant 3.3.7-1 Amendment No. +69, -9,221
PAM Instrumentation 3.3.7 ACTIONS CONDITION l REQUIRED ACTION l COMPLETION TIME D. (Not used)
E. Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C etD Table 3.3.7-1 for the not met. channel.
F. As required by Required F.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action E.1 and referenced in Table 3.3.7-1. AND F.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> G. As required by Required G.1 Initiate action in Immediately Action E.1 and referenced accordance with in Table 3.3.7-1. Specification 5.6.6.
Palisades Nuclear Plant 3.3.7-2 Amendment No. 4-B9, 221
PAM Instrumentation 3.3.7 Table 3.3.7-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION E.1
- 1. Primary Coolant System Hot Leg Temperature (wide range) 2
- 2. Primary Coolant System Cold Leg 2 Temperature (wide range)
- 3. Wide Range Neutron Flux 2
- 4. Containment Floor Water Level 2 (wide range)
- 5. Subcooled Margin Monitor 2
- 6. Pressurizer Level (wide range) 2
- 7. (Deleted)
- 8. Condensate Storage Tank Level 2
- 9. Primary Coolant System Pressure 2 (wide range)
- 10. Containment Pressure (wide range) 2
- 11. Steam Generator A Water Level 2 (wide range)
- 12. Steam Generator B Water Level 2 (wide range)
- 13. Steam Generator A Pressure 2
- 14. Steam Generator B Pressure 2
- 15. Containment Isolation Valve Position 1 per valve (a
- 16. Core Exit Temperature - Quadrant 1 4
- 17. Core Exit Temperature - Quadrant 2 4
- 18. Core Exit Temperature - Quadrant 3 4
- 19. Core Exit Temperature - Quadrant 4 4
- 20. Reactor Vessel Water Level 2
- 21. Containment Area Radiation 2 G (hiqh range)
(a)Not required for isolation valves whose associated penetration is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.