PAM Instrumentation 3.3.7 3.3 INSTRUMENTATION 3.3.7 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.7 The PAM instrumentation for each Function in Table 3.3.7-1 shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS NO I
- 1.
LCO 3.0.4 is not applicable.
- 2.
Separate Condition entry is allowed for each Function.
I CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more Functions A.1 Restore required 30 days with one required channel channel to OPERABLE inoperable.
status.
B.
Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.6.
met.
C.
One or more Functions C.1 Restore one channel to 7 days with two required channels OPERABLE status.
I Palisades Nuclear Plant 3.3.7-1 Amendment No. 4ag, 221 Corrected by letter dated February 22, 2005
PAM Instrumentation 3.3.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D.
(Not used)
E.
Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C not Table 3.3.7-1 for the met.
channel.
F.
As required by Required F.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action E.1 and referenced in Table 3.3.7-1.
AND F.2 Be in MODE 4.
30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> G.
As required by Required G.1 Initiate action in Immediately Action E.1 and referenced accordance with in Table 3.3.7-1.
Specification 5.6.6.
I I
Palisades Nuclear Planit 3.3.7-2 Amei Corrected by letter datedFebruary 22, 2005 idment No. 4-8, 221
PAM Instrumentation 3.3.7 Table 3.3.7-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REQUIRED ACTION E.1 REQUIRED CHANNELS FUNCTION
- 1.
Primary Coolant System Hot Leg Temperature (wide range)
- 2.
Primary Coolant System Cold Leg Temperature (wide range)
- 3.
Wide Range Neutron Flux
- 4.
Containment Floor Water Level (wide range)
- 5.
Subcooled Margin Monitor
- 6.
Pressurizer Level (wide range)
- 7.
(Deleted)
- 8.
Condensate Storage Tank Level
- 9.
Primary Coolant System Pressure (wide range)
- 10. Containment Pressure (wide range)
- 11. Steam Generator A Water Level (wide range)
- 12.
Steam Generator B Water Level (wide range)
- 13. Steam Generator A Pressure
- 14. Steam Generator B Pressure
- 15.
Containment Isolation Valve Position
- 16. Core Exit Temperature - Quadrant 1
- 17. Core Exit Temperature - Quadrant 2
- 18. Core Exit Temperature - Quadrant 3
- 19.
Core Exit Temperature - Quadrant 4
- 21. Containment Area Radiation 2
2 2
2 2
2 2
2 2
2 2
2 2
1 per valve(a) 4 4
4 4
F F
F F
F.
F F
2 G
2 G
(high range)
(a)
Not required for isolation valves whose associated penetration is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
Palisades Nuclear Plant 3.3.7-4 Amendment No. 4-8D, 221 Corrected by letter dated February 22, 2005