2009/01/09 PINGP Lr - PINGP Letter Responding to NRC RAI Letter of 12/10/2008
ML090100006
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/09/2009
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML090100006 (60)


Text

1 PrairieIslandNPEm Resource From: Vincent, Robert [Robert.V incent@xenuclear.com]

Sent: Friday, January 09, 2009 6:04 PM To: Richard Plasse; Nathan Goodman Cc: Eckholt, Gene F.; Davis, Marlys E.

Subject:

PINGP Letter Responding to NRC RAI Letter of 12/10/2008 Attachments:

20090109 Response to RAI Letter dtd 12-10-08.pdf; 20090109 Response to RAI Letter dtd 12-10-08.docAttached are pdf and WORD copies of the PINGP letter signed out today responding to the TLAA RAIs transmitted in NRC letter dated 12/10/08.

Please call Gene or me if you have any questions.

Bob Vincent Licensing Lead, License Renewal Project 612-388-1121 X7259

Hearing Identifier: Prairie_Island_NonPublic Email Number: 309 Mail Envelope Properties (9FA1D9F2F220C04F95D9394E3CF02DAB013A7180)

Subject:

PINGP Letter Responding to NRC RAI Letter of 12/10/2008 Sent Date: 1/9/2009 6:03:56 PM Received Date: 1/9/2009 6:04:08 PM From: Vincent, Robert Created By: Robert.Vincent@xenuclear.com Recipients: "Eckholt, Gene F." <Gene.Eckholt@xenuclear.com>

Tracking Status: None "Davis, Marlys E." <Marlys.Davis@xenuclear.com>

Tracking Status: None "Richard Plasse" <Richard.Plasse@nrc.gov> Tracking Status: None "Nathan Goodman" <Nathan.Goodman@nrc.gov> Tracking Status: None

Post Office: enex02.ft.nmcco.net Files Size Date & Time MESSAGE 291 1/9/2009 6:04:08 PM 20090109 Response to RAI Letter dtd 12-10-08.pdf 1423940 20090109 Response to RAI Letter dtd 12-10-08.doc 318016

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 1 RAI 4.3.1.1-1 Some of the reported CUF results were generated by FatiguePro software. However, FatiguePro is not endorsed by NRC staff, since FatiguePro does not produce all six individual components of a transient stress tensor (Sxx, Syy, Szz, Sxy, Syz, Szx) to support the American Society of Mechanical Engineers (ASME)Section III fatigue analysis method. FatiguePro produces only one stress component and uses that single

stress component for fatigue evaluation. Please identify from Tables 4.3-2 through 4.3-8, if any, those items whose CUF values were calculated without using every individual component of the transient stress tensors. The items that are identified must be reevaluated in accordance with the ASME Section III guidelines so that the fatigue results are valid and applicable to the period of

extended operation. In addition, the staff noticed multiple occurrences of the

terminology "stress-based monitoring" in the body of the LRA. If the plant does not have appropriate stress monitoring capability, use of such a terminology would be misleading.

Please make appropriate corrections.

NSPM Response to RAI 4.3.1.1-1 LRA Section 4.3.1 (Page 4.3-2), "Cumulative Usage Factors" states that the cumulative usage factors reported in Section 4.3.1, except as otherwise noted, are the design basis values and do not consider the effects of reactor water environment on fatigue life. The CUFs reported in Tables 4.3-2, 4.3-3, 4.3-4, 4.3-5, 4.3-6, and 4.3-7 are all calculated in

accordance with ASME Section III using the values of six stress components versus time for the complete stress cycle, taking into account both the gross and local structural discontinuities and the thermal effects which vary during the cycle.

The calculations of Environmentally-Assisted Fatigue in Section 4.3.3 of the LRA reported in Table 4.3-8 are based on ASME Section III CUFs with the exception of the pressurizer surge line hot leg nozzle safe end and the charging system nozzle for each

Unit. The unadjusted CUFs at both locations are based on FatiguePro stress-based fatigue analyses. NSPM is in the process of performing ASME Code (Subsection NB) compliant fatigue calculations for the pressurizer surge line hot leg nozzle and the charging nozzle and will report the revised CUFs and CUFs adjusted for environmental effects at these locations as an amendment to the PINGP LRA. Conforming changes to

LRA Section 4.3.3, "PINGP EAF Results" will also be included in that amendment to

reflect analysis results and remove references to stress-based fatigue monitoring. This amendment will be submitted by April 30, 2009. This action is identified as Preliminary

License Renewal Commitment No. 36. In addition, to clarify NSPM's intention in regard to evaluating the effects of insurge/outsurge transients on the lower head of the pressurizer (and to eliminate a

reference to stress-based fatigue monitoring), the following LRA changes are made: In LRA Section 4.3.1.3, the last paragraph on Page 4.3-10 and the first paragraph on Page 4.3-11 are deleted and replaced in their entirety with the following: NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 2NSPM will perform an ASME Section III fatigue evaluation of the lower head of the pressurizer to account for effects of insurge/outsurge transients. The evaluation will

determine the cumulative fatigue usage of limiting pressurizer component(s) through

the period of extended operation. The analyses will account for periods of both "Water Solid" and "Standard Steam Bubble" operating strategies. Analysis results will be incorporated, as applicable, into the Metal Fatigue of Reactor Coolant Pressure Boundary Program. This analysis and any associated program enhancements will be completed prior to the period of extended operation. The

Metal Fatigue of Reactor Coolant Pressure Boundary Program will manage metal fatigue of the pressurizer due to insurge/outsurge transients in accordance with 10

CFR 54.21(c)(1)(iii). The following additional LRA changes are also being made to eliminate references to stress-based fatigue monitoring:In LRA Section A3.2, on Page A-17, the third sentence of the first paragraph is deleted and replaced in its entirety with the following: "The program also tracks fatigue usage in

critical high-usage components." In LRA Section B3.2, Program Description, on page B-84, the third sentence of the first paragraph is deleted and replaced in its entirety with the following: "The program also tracks fatigue usage in critical high-usage components." In LRA Section B3.2, Enhancements, on page B-85, the first bulleted enhancement is deleted and replaced in its entirety with the following: Scope of Program, Preventive Actions, Parameters Monitored/Inspected, Detection of Aging Effects, Monitoring and Trending The program will monitor the six component locations identified in NUREG/CR-6260 for older vintage Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or by tracking the

cumulative fatigue usage, including the effects of coolant environment. The

following locations will be monitored: NUREG/CR-6260 Location Reactor Pressure Vessel Inlet and Outlet Nozzles

Reactor Pressure Vessel Shell to Lower Head

RCS Hot Leg Surge Line Nozzle

RCS Cold Leg Charging Nozzle

RCS Cold Leg Safety Injection Accumulator Nozzle RHR-to-Accumulator Piping Tee To reflect the changes discussed above, two Preliminary License Renewal Commitments included in the LRA transmittal letter dated April 11, 2008, are also

revised. NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 3 Preliminary License Renewal Commitment No. 33 is revised to read as follows:

CommitmentNumber Commitment Implementation Schedule Related LRA SectionNumber 33 The Metal Fatigue of Reactor Coolant Pressure Boundary Program will be enhanced as follows: The program will monitor the six component locations identified in NUREG/CR-6260 for older vintage Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or by tracking the cumulative fatigue usage, including the effects of coolant environment. The following locations will be

monitored:

o Reactor Vessel Inlet and Outlet Nozzles o Reactor Pressure Vessel Shell to Lower Head o RCS Hot Leg Surge Line Nozzle o RCS Cold Leg Charging Nozzle o RCS Cold Leg Safety Injection Accumulator Nozzle o RHR-to-Accumulator Piping Tee Program acceptance criteria will be clarified to require corrective action to be taken before a cumulative fatigue usage factor exceeds 1.0 or a design basis transient cycle limit is exceeded. U1 - 8/9/2013 U2 - 10/29/2014 B3.2 Preliminary License Renewal Commitment No. 35 is revised to read as follows:

CommitmentNumber CommitmentImplementation Schedule Related LRA SectionNumber 35 NSPM will perform an ASME Section III fatigue evaluation of the lower head of the pressurizer to account for effects of insurge/outsurge transients. The evaluation will determine the cumulative fatigue usage of limiting pressurizer component(s) through the period of extended operation. The analyses will account for periods of both "Water Solid" and "Standard Steam Bubble" operating strategies. Analysis results will be incorporated, as applicable, into the Metal Fatigue of Reactor Coolant Pressure Boundary Program. U1 - 8/9/2013 U2 - 10/29/2014 4.3.1.3 NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 4 RAI 4.3.1.2-1 The design cycles and the projected 60-year cycles for Prairie Island Nuclear Generating Plant's (PINGP's) design basis transients are shown in Table 4.3-1 of the

LRA. The staff has noted that the paragraph under LRA Table 4.3-4 of the LRA, which discusses the plant loading and unloading transient cycles, is vague. In the targeted paragraph, an unrelated/unrecognized number, 1835, which is not shown in Table 4.3-1, is suddenly brought up. Clarify and indicate the source of this 1835 number and

clarify whether this value represents the new design basis cycle values for the baffle

bolts.NSPM Response to RAI 4.3.1.2-1 As part of the planned Measurement Uncertainty Recapture-Power Uprate (MUR-PU) project and fuel transition, NSPM has recently completed a fatigue evaluation of the Reactor Vessel (RV) lower internals. Fatigue analyses of the RV lower internals are not part of the PINGP CLB but were conservatively included to evaluate the proposed MUR-PU and fuel transition. Fatigue usage at all RV lower internal locations, with the exception of the baffle bolts, was determined using the full set of design transients defined in Table 4.3-1 of the PINGP LRA. For the baffle bolts, the number of plant loading and unloading transients at 5% of full power per minute was decreased from 18,300 to 1,835 to obtain a usage factor below 1.0. Therefore, the baffle bolts are limited to 1,835 loading and unloading cycles at 5% of full power per minute, which is a

new design basis cycle value for the baffle bolts. As discussed in PINGP LRA Section

B3.2, the Metal Fatigue of Reactor Coolant Pressure Boundary Program and PINGP USAR Table 4.1-8 will be enhanced to include this additional cyclic limit for baffle bolt

fatigue.RAI 4.3.1.3-1 To project the cycles and cumulative usage factor (CUF) to the period of extended operation, it is necessary to have the base line information. Before the dates of issuance of NRC Bulletins 88-08 and 88-11, there wasn't any data collected regarding stratification and insurge/outsurge events for pressurizer surge lines. Please discuss how you reconstructed the cycles that occurred prior to December 20, 1988 (the date of issuance for Bulletin 88-11), for the pressurizer surge line stratification events and insurge/outsurge events. Please provide the date when the events tracking began and discuss how the tracked data was used to achieve the 60-year cycle

projection.

NSPM Response to RAI 4.3.1.3-1 As described in Section 4.3.1.6 of the PINGP LRA (Page 4.3-16), the site-specific evaluations of the pressurizer surge line (i.e., WCAP-12839 for Unit 1 and WCAP-12639 for Unit 2) are considered TLAAs since the evaluations use time-limited assumptions NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 5such as thermal and pressure transients, and operating cycles. The dominant event cycles that contribute to fatigue in the surge line analyses are the 200 heatups and

cooldowns that include stratification and striping in the pressurizer surge line. The surge line temperature transients during heatup and cooldown are characterized in WCAP-12839 and WCAP-12639 by maximum system differential temperatures between the pressurizer water and RCS hot leg that occur over five RCS temperature ranges.The system differential temperature ranges were used to define the stratification events

and insurge/outsurge events for the purpose of the analyses.In order to ensure that the pressurizer surge line analyses were bounding for PINGP, the actual system differential temperatures (maximum temperature differential between pressurizer and RCS hot leg) were obtained for each Unit heatup and cooldown since initial plant operation. Unit 1 differential temperature data was recorded beginning in

1973, and Unit 2 differential temperature data was recorded beginning in 1974.

Following completion of the pressurizer surge line thermal stratification analyses in the early 1990s, PINGP continues to monitor temperature differentials between the pressurizer water and RCS hot leg as required by the Metal Fatigue of Reactor Coolant Pressure Boundary Program to ensure that plant operation is within the bounds of the pressurizer surge line transient definitions contained in WCAP-12839 and WCAP-

12639.As stated previously, the dominant event cycles that contribute to surge line stratification and insurge/outsurge events are the plant heatups and cooldowns, which

are limited by design to 200. As described in Section 4.3.1 and Table 4.3-1 of the

PINGP LRA, the number of heatups and cooldowns projected to be accumulated after 60 years of operation (i.e., approximately 125) is less than the number of cycles used to

calculate fatigue of the surge line in WCAP-12839 for Unit 1 and WCAP-12639 for Unit

2.RAI 4.3.1.4-1 Table 4.3-6 of the LRA shows the CUF values at certain components in the steam generators. It is understood that the CUF values for Unit 1, reflect steam generator replacement (occurred in November 2004), therefore the CUF at the corresponding components/locations of Units 1 and 2, are expected to be somewhat different.

However, for the primary inlet nozzle and primary outlet nozzle, the differences between Unit 1 and Unit 2, are significant. Specifically, at these two nozzles, the CUF is as high as 0.880 for the original steam generator (Unit 2) but it is dropped to near zero, 0.007, for the replaced one (Unit 1). Explain how this is possible. Specify the analytical tool

used along with a discussion concerning differences in the input data.

NSPM Response to RAI 4.3.1.4-1 As noted in Section 4.3.1.4 of the PINGP LRA (Page 4.3-11), the primary and secondary sides of the steam generators are Class 1 and were designed in accordance

with ASME Section III, 1995 Edition through 1996 Addenda for Unit 1 and 1965 Edition NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 6 through Winter 1966 Addenda for Unit 2. The cumulative usage factors for the steam generator primary inlet and outlet nozzles were calculated by AREVA NP for the Unit 1

replacement steam generators (RSGs) in 2004, and by Westinghouse Electric

Corporation for the Unit 2 original steam generators (OSGs). The differences in

reported cumulative usage factors (CUFs) in the nozzle base metal may be attributed to one or a combination of the following: (1) differences between the Unit 1 and Unit 2 nozzle geometry and materials of construction, (2) differences in design transients and external nozzle loads and moments used in the fatigue evaluations, or (3) differences in methodology of CUFs. Each potential difference is discussed below.

The Unit 1 primary inlet and outlet nozzles are forged with the primary head and are fabricated from low alloy steel (SA 508 Grade 3 Class 2). The Unit 2 primary inlet and outlet nozzles were cast with the primary head and are fabricated from carbon steel (SA 216 Grade WCC). The thicknesses of the Unit 1 nozzles are less than the Unit 2 nozzles due to differences in materials of construction. The geometry of the Unit 1 and Unit 2 nozzles are both similar to ASME Section III, Figure NB-3338.2(a)-2, Figure (c),

with the only significant difference being the nozzle thicknesses. Due to differences in materials of construction and wall thickness the Unit 1 nozzles will respond quicker to design temperature transients, through-wall gradients will be reduced, and thermal stresses are expected to be lower than the Unit 2 nozzles when exposed to equivalent

thermal transients.

The design transients used in the fatigue evaluation of the Unit 1 and Unit 2 inlet and outlet nozzles are based on the Westinghouse standard NSSS design transients and

are consistent between Units 1 and 2. These design transients are listed in Table 4.3-1 of the PINGP LRA. External loads and moments applied to the nozzles are in accordance with design specifications for both units. For the Unit 1 RSGs it was necessary to perform a new reactor coolant loop analysis with the RSGs explicitly modeled. The resultant loads generated for the vessel nozzles were compared to those provided for the original steam generator. Bounding loads were selected and used in the stress analysis of the Unit 1 RSG inlet and outlet nozzles. Therefore, the loads and

moments applied to the Unit 1 nozzles are equivalent to or bound the loads and

moments used for the OSG Unit 2 stress analysis of the nozzles. The calculation of the primary nozzle CUFs performed in 2004 for Unit 1 is based on finite element analysis to determine temperature fields in thermal calculations, and

stress and displacement fields in mechanical or thermo-mechanical calculations. The

finite element analysis results are interpreted using post-processing programs to permit stress analyses in accordance with ASME Section III, Subsection NB. Usage factors were calculated in accordance with NB-3222.4 (e)(5) using loadset pairs based on the NSSS design transients. The maximum calculated CUF of 0.007 for the primary inlet nozzle was calculated at the inside surface of the primary inlet nozzle base metal.The calculation of the primary nozzle CUFs performed in 1969 for Unit 2 is based on photoelastic and thermal transient analyses considering the worst case normal and upset loading conditions. The maximum peak stress intensity considering worst case normal and upset conditions was conservatively applied for the total number of design NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 7cyclic applications (i.e., 24,000 cyclic applications for all transients the unit must undergo, which bounds the applicable design transients in Table 4.3-1 of the PINGP LRA). This resulted in a very conservative cumulative usage factor of 0.88 for the inside surface of the primary inlet nozzle base metal.

In summary, the differences between the usage factors for the Unit 1 and Unit 2 steam generator primary inlet and outlet nozzles are attributed to differences in materials of construction, wall thickness, and calculation methods used to perform the CUF

calculations. The Unit 2 evaluation was performed using a peak stress intensity for the

worst case transient applied to the NSSS design transients, whereas the Unit 1 calculation considered individual usage contributions due to loadset pairs for the NSSS

design transients. In addition, the Unit 2 evaluation was performed prior to the development of detailed finite element stress analysis computer codes and was very

conservative.

RAI 4.3.1.4-2 In LRA Section 4.3.1.4, the applicant discusses fracture mechanics analyses for the steam generator feedwater nozzle and performed fracture mechanics analyses to justify leaving the eroded thermal sleeves in the as-found condition. Clarify why the fracture mechanics evaluation/flaw evaluation for the steam generator feedwater nozzles are considered to be a time-limited aging analysis (TLAA) that meets the definition for

TLAAs in 10 CFR 54.3.

NSPM Response to RAI 4.3.1.4-2 The Steam Generator Fatigue and Fracture Mechanics Evaluation of Feedwater Inlet Nozzle discussion was conservatively included in LRA Section 4.3.1.4 even though the analysis did not meet all six criteria in 10 CFR 54.3(a) for defining a TLAA. In particular, the analysis did not meet criterion (3) in that it did not "Involve time-limited assumptions

defined by the current operating term, for example, 40 years." The crack growth analysis does not provide a basis for demonstrating that a known flaw is acceptable for continued operation for the life of the plant. The analysis simply defined an appropriate

examination frequency (nominally each 100 days of operation in Modes 2 or 3) that is

based on a postulated flaw of a certain size. There were no known flaws in the steam generator feedwater nozzle region of interest. Therefore, since the crack growth analysis is not managing an actual (existing) crack and the analysis was not performed for the service life of the component (i.e., 40 years), this evaluation is not a TLAA. NSPM monitors the Unit 2 feedwater nozzle to pipe transition forging welds for evidence of cracking using ultrasonic inspection through owner elected examinations maintained within the PINGP ASME Section XI Inservice Inspection, Subsections IWB, IWC, and

IWD Program. (Refer to "Submittal of the 4th Interval Inservice Inspection Plan - Units 1 & 2", June 21, 2004, L-PI-04-076, ADAMS Accession Number ML041800468.) The

periodic examinations ensure that the feedwater nozzle region remains free of cracking. NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 8NSPM has determined that this discussion should be removed from the LRA.

Accordingly, the following changes are made: In LRA Table 4.1-2 on Page 4.1-8, the line item for inservice flaw growth analyses that demonstrate structural stability for 40 years is hereby revised to appear as follows: NUREG-1800 Generic TLAA Examples Applicability to PINGP LRA SectionInservice flaw growth analyses that demonstrate structural stability for 40 years No - Did not meet TLAA criteria-In LRA Section 4.3.1.4 on Pages 4.3-12 and 4.3-13, the section entitled "Fatigue and Fracture Mechanics Evaluation of Feedwater Inlet Nozzle" is hereby deleted in its

entirety.RAI 4.3.1.5-1 In Section 4.3.1.5 of the LRA, the applicant states that "Exemption from fatigue evaluation was justified for the casing feet, casing nozzle, and upper and lower seal

housings and bolts,"without supporting this statement with a regulatory basis. Provide your technical and regulatory basis for exempting the reactor coolant pump casing feet, casing nozzle, and upper and lower seal housings and bolts from being within the scope

of an ASME Section III CUF analysis.

NSPM Response to RAI 4.3.1.5-1 As described in Section 4.3.1.5 of the PINGP LRA, the reactor coolant pumps (RCPs) were designed in accordance with Article 4 of ASME Section III through the 1970 Winter Addendum. Exemption from fatigue evaluation was justified in accordance with ASME Section III, Article 415.1, for the casing feet, casing nozzle, and upper and lower seal housings and bolts. The applicable RCP calculations to show compliance with Article N-415.1, (a) through (f) are based on design transients that bound those presented in LRA Table 4.3-1, and are intended to represent 40 years of operation. The numbers of

analyzed design transients used in the RCP exemption from fatigue analyses required by Article N-415.1 for the casing feet, casing nozzle, and upper and lower seal housings

and bolts, will not be exceeded in 60 years of operation, and these TLAAs will remain

valid through the period of extended operation in accordance with 10 CFR

54.21(c)(1)(i).

RAI 4.3.3-1 It is known that some of the reactor coolant system piping charging nozzles are designed and manufactured with a thermal sleeve and some are not. Please confirm whether or not a thermal sleeve exists in the charging nozzle, and confirm that the stress and fatigue analyses were performed based on the actual NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 9geometric conditions of the charging nozzle in use, so that the fatigue results are valid and applicable to the period of extended operation.

NSPM Response to RAI 4.3.3-1 Each Unit at PINGP has one 2.0 inch stainless steel charging line that connects to a 27.5 inch I.D. stainless steel reactor coolant cold leg pipe. Each charging line to RCS

pipe connection is made using a stainless steel half coupling (i.e., charging nozzle) that

contains a thermal sleeve fabricated from Type 316 stainless steel. Both charging line to RCS cold leg pipe connections at PINGP contain a thermal sleeve. These connections were originally designed in accordance with B31.1.0 and did not include cumulative usage factor evaluations. In order to address environmentally-assisted fatigue for license renewal, PINGP performed stress-based fatigue analyses of

the charging nozzles using FatiguePro as described in Section 4.3.3 of the PINGP LRA (Page 4.3-24). The charging nozzle finite element model used in the FatiguePro evaluation was developed using the appropriate geometry of the PINGP charging

nozzles and thermal sleeves, as detailed on plant fabrication drawings. As discussed in the response to RAI 4.3.1.1-1 above, however, NSPM has elected to perform an ASME Section III, NB-3200, fatigue analysis of the charging nozzles. The updated usage

factor will be used to evaluate the effects of reactor water environment on the fatigue life

of the charging nozzles. The finite element model associated with the ASME Section III analyses will be based upon the charging nozzle geometry as defined by PINGP

drawings.RAI 4.3.3-2 LRA Section 4.3.3 discusses environmentally assisted fatigue (GSI-190) and provides values of the environmentally assisted fatigue correction factors, F en , applicable to PINGP. In the calculation of F en for the low alloy steels, the applicant assumes that the dissolved oxygen level for pressurized-water reactor plants is below 0.05 ppm at

temperatures above 150 oC. This assumption in effect takes away the dependency of F en on strain rate and sulfur content and also significantly weakens the dependency of F en on temperature. Provide your basis for using this assumption.

NSPM Response to RAI 4.3.3-2 At PINGP, RCS temperatures above 150 o C (302 o F) correspond to operation in Mode 4 (Hot Shutdown, 350 o F > Tavg > 200 o F), Mode 3 (Hot Standby, Tavg >

350 o F), Mode 2 (Startup), or Mode 1 (Power Operation). PINGP controls oxygen in the Reactor Coolant System (RCS) by maintaining a hydrogen overpressure in the Volume Control Tank.

Minimum primary water hydrogen levels are maintained which are effective in mitigating oxidizing conditions due to radiolysis or oxygen ingress into the reactor coolant. The control parameters for RCS dissolved oxygen are in accordance with the PINGP Water Chemistry Program and the PINGP Technical Requirements Manual (TRM) NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 10which specify a dissolved oxygen action level limit of less than 100 ppb in Modes 1, 2, 3, and Mode 4 with RCS Temperature >

250 oF. Per the TRM, if the limit is exceeded, the dissolved oxygen shall be restored to less than 100 ppb within a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period or the Unit shall be shutdown. At PINGP, dissolved oxygen in the RCS is typically less than 5 ppb prior to criticality (Modes 2, 3, and 4) and 0 ppb during power operation (Mode 1). In addition, a review of PINGP RCS water chemistry data from 1999-2008 was performed. The review confirmed that the dissolved oxygen content in the RCS

never exceeded 40 ppb (0.04 ppm) when the RCS temperature was greater than 300 oF. Therefore, given the past plant operating history and adherence to action level limits, it is reasonable to assume that the dissolved oxygen level in the RCS at PINGP has been and will continue to be maintained below 0.05 ppm (50 ppb) at RCS

temperatures above 150 o C (302 o F).RAI 4.7.4-1 License renewal application (LRA) Section 4.7.4 indicates that the polar cranes, auxiliary building cranes, the turbine building cranes, and spent fuel cranes will be used

less than 20,000 lifting cycles over 60 years. Provide your estimate for the number of lifting cycles that have occurred in each of the stated cranes and your 60-year lifting cycle projections for these cranes.

NSPM Response to RAI 4.7.4-1 The NUREG-0612 cranes with fatigue TLAAs include the polar cranes, auxiliary building crane, the turbine building cranes, and spent fuel crane. These cranes are described in Section 12.2.12 of the PINGP USAR. Polar Crane, Auxiliary Building Crane, Turbine Building Crane In accordance with the Northern States Power Company (NSP) letter to the NRC dated November 8, 1982, titled "Control of Heavy Loads (Response to Staff Concerns on the

Six Month Submittal)", in the Response to Inquiry 4 on page 8, the evaluation of fatigue

for the polar crane, auxiliary building crane, and turbine building crane assumed 800 design loading cycles for the heaviest load over 40 years. This allowed for two outages

per year and ten lifts of the heaviest load per outage over 40 years. Multiplying 800 heavy load cycles by 1.5 to accommodate 60 years of operation yields a projection of 1200 heavy load cycles through the period of extended operation, providing significant margin to the design load cycle limit of 20,000 cycles.

At present (January 2009), both PINGP Units have completed 25 refueling outages.

Multiplying 10 lifts of the heaviest load per outage by 25 refueling outages yields an estimate of 250 heavy load cycles to date for the polar cranes and turbine building cranes, and an estimate of 500 heavy load cycles to date for the auxiliary building crane

since it services both Units. Based upon the estimated number of heavy lifting cycles NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 11accrued to date, it is not expected that these cranes will attain the projected number of lifts (i.e., 1200) after 60 years of operation.

Spent Fuel Crane In accordance with the NSP letter to the NRC dated November 8, 1982, titled "Control of Heavy Loads (Response to Staff Concerns on the Six Month Submittal)", Attachment 1, in the Response to Inquiry 4 on page 1-4, the evaluation of fatigue for the spent fuel

crane assumed 800 design loading cycles over 40 years. The weight of the largest actual load, 3700 lbs., is substantially less than the rated crane capacity of 6000 lbs.

The use of 800 design load cycles allowed for two outages per year and ten lifts of the

heaviest load per outage over 40 years. Multiplying 800 heavy load cycles by 1.5 to accommodate 60 years of operation yields a projection of 1200 heavy load cycles through the period of extended operation, providing significant margin to the design load

cycle limit of 20,000 cycles.

At present (January 2009), both PINGP Units have completed 25 refueling outages. Since the single spent fuel crane services both Units, it is expected to have been utilized for 50 refueling outages to date. Multiplying 10 lifts of the heaviest load per

outage by 50 refueling outages yields an estimate of 500 heavy load cycles to date for

the spent fuel crane. Based upon the estimated number of heavy lifting cycles accrued to date, it is not expected that the spent fuel crane will attain the projected number of

lifts (i.e., 1200) after 60 years of operation.

RAI AMP B2.1.3-2 During review of LRA Section B2.1.3, "Operating Experience," the staff noted that there were two instances of cracking due to intergranular stress corrosion cracking (IGSCC)

of Safety Injection Accumulator Tanks. Although these cracks were repaired and the In-service Inspection Program was augmented to include additional inspections, such as ultrasonic testing and liquid penetrant inspection, the applicant did not indicate if new

activities were implemented to improve and monitor the environment to preclude

IGSCC. Please provide details of any preventive activities to preclude IGSCC.

NSPM Response to RAI AMP B2.1.3-2 The leak detected in January 1988 in the Unit 2 Safety Injection 22 Accumulator Tank water level sensing line was a result of intergranular stress corrosion cracking (IGSCC) that initiated as a consequence of high stresses caused by the improper fit-up of the pipe to the nozzle in preparation for welding. The leak was repaired. Evaluation of the nozzle leakage resulted in the periodic inspection (ultrasonic and dye penetrant examinations) of the Unit 1 and 2 Safety Injection Accumulator nozzles on a 10-year

frequency.In May 2005, cracks were found in the level transmitter nozzles on the 21 Accumulator Tank in Unit 2. The affected nozzles were replaced. Metallurgical analysis indicated NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 12the cracking mechanism to be IGSCC initiated by sensitization of the stainless steel components during post-weld heat treatment of the tanks. The apparent cause

evaluation concluded that the best method for the management of nozzle cracking was periodic monitoring, including internal visual inspection and dye penetrant examination, in addition to the external ultrasonic examination. The current examination frequency is once every third refueling outage.

The Safety Injection Accumulator nozzle examinations are owner elected examinations maintained within the PINGP ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD Program. The nozzles are also periodically visually inspected (VT-2) for leakage as required by the IWB, IWC, and IWD Program.

The primary pressure boundary piping of PWRs has generally not been found to be affected by SCC because of low dissolved oxygen levels and control of primary water chemistry. However, the potential for SCC exists due to inadvertent introduction of contaminants into the primary coolant system. The PINGP Water Chemistry Program periodically monitors water chemistry and controls detrimental contaminants (such as chlorides, fluorides, dissolved oxygen, and sulfate) to levels below those known to result in cracking. Plant procedures require water chemistry control in accordance with Revision 5 of the "PWR Primary Water Chemistry Guidelines", EPRI TR-1002884, for primary and auxiliary water systems. EPRI water chemistry guidelines are based on

substantial industry experience and laboratory analysis. The program has been effective in controlling plant chemistry and taking required actions to address out-of-

specification values. In the examples described above, conditions were identified and corrected prior to causing any significant impact to safe operation or loss of intended functions. No

additional preventive activities were implemented beyond continuing with the existing mitigative features of the Water Chemistry Program. The PINGP ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD Program and the Water Chemistry Program effectively manage the condition of the pressure retaining components within the license renewal boundary and ensure the associated aging effects such as cracking are adequately managed. Appropriate guidance is contained in PINGP procedures for indications of degradation requiring reevaluation, repair, or

replacement. Updated Preliminary License Renewal Commitment List 13 Pages Preliminary License Renewal Commitments Updated through 1/9/2009 Page 1 of 13 The following table provides the list of preliminary commitments included in the Application for Renewed Operating Licenses (LRA) for Prairie Island Nuclear Generating Plant (PINGP) Units 1 and 2. These commitments reflect the contents of the LRA as submitted, and any updates provided in subsequent correspondence, but are considered preliminary in that the specific wording of some commitments may change, and additional commitments may be made, during the NRC review of the LRA. The final commitments as submitted by NSPM, and accepted by NRC, are expected to be confirmed in the NRC's Safety Evaluation Report (SER) for the renewed operating licenses. The final commitments, as confirmed in the SER, will become effective upon NRC issuance of the renewed operating licenses. In addition, as stated in the LRA, the final commitments will be incorporated into the Updated Safety Analysis Report (USAR).

Commitment Number Commitment Implementation Schedule Related LRA Section Number 1Each year, following the submittal of the PINGP License Renewal Application and at least three months before the

scheduled completion of the NRC review, NMC will submit amendments to the PINGP application pursuant to 10 CFR

54.21(b). These revisions will identify any changes to the Current Licensing Basis that materially affect the contents of the License Renewal Application, including the USAR supplements.

12 months after LRA submittal

date and at least

3 months before

completion of NRC review

1.4 2Following

the issuance of the renewed operating license, the summary descriptions of aging management programs and

TLAAs provided in Appendix A, and the final list of License Renewal commitments, will be incorporated into the PINGP USAR as part of a periodic USAR update in accordance with 10

CFR 50.71(e). Other changes to specific sections of the PINGP USAR necessary to reflect a renewed operating license will also be addressed at that time.

First USAR update in accordance with 10 CFR 50.71(e)

following issuance of

renewed operating licenses A1.03 An Aboveground Steel Tanks Program will be implemented.

Program features will be as described in LRA Section B2.1.2.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.24 Procedures for the conduct of inspections in the External Surfaces Monitoring Program, Structures Monitoring Program, U1 - 8/9/2013 U2 - 10/29/2014 B2.1.6 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 2 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Buried Piping and Tanks Inspection Program, and the RG 1.127

Inspection of Water-Control Structures Associated with Nuclear

Power Plants Program will be enhanced to include guidance for

visual inspections of installed bolting. 5 A Buried Piping and Tanks Inspection Program will be implemented. Program features will be as described in LRA Section B2.1.8.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.86 The Closed-Cycle Cooling Water System Program will be enhanced to include an internal visual examination of

accessible surfaces of components serviced by closed-cycle cooling water when the systems or components are opened

during scheduled maintenance or surveillance activities.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.97 The Compressed Air Monitoring Program will be enhanced to require that Station and Instrument Air System air quality be monitored and maintained in accordance with the instrument air

quality guidance provided in ISA S7.0.01-1996. Particulate

testing will be revised to use a particle size methodology as

specified in ISA S7.0.01.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.108 An Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will be

completed. Program features will be as described in LRA Section B2.1.11.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.11 9An Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will be implemented. Program features will be as described in LRA Section B2.1.12.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.12 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 3 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number 10 An Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in

Instrumentation Circuits Program will be implemented. Program

features will be as described in LRA Section B2.1.13.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.1311 The External Surfaces Monitoring Program will be enhanced as follows: The scope of the program will be expanded as necessary to include all metallic and non-metallic components

within the scope of license renewal that require aging management in accordance with this program. The program will ensure that surfaces that are inaccessible or not readily visible during plant operations will be inspected during refueling outages. The program will ensure that surfaces that are inaccessible or not readily visible during both plant operations and refueling outages will be inspected at

intervals that provide reasonable assurance that aging effects are managed such that the applicable components will perform their intended function during

the period of extended operation.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.14 12The Fire Protection Program will be enhanced to require periodic visual inspection of the fire barrier walls, ceilings, and floors to be performed during walkdowns at least once every refueling cycle. [Revised in letter dated 12/5/2008 in response to RAI B2.1.15-3]U1 - 8/9/2013 U2 - 10/29/2014 B2.1.15 13 The Fire Water System Program will be enhanced as follows: U1 - 8/9/2013 B2.1.16 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 4 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number The program will be expanded to include eight additional yard fire hydrants in the scope of the annual visual inspection and flushing activities. The program will require that sprinkler heads that have been in place for 50 years will be replaced or a

representative sample of sprinkler heads will be tested using the guidance of NFPA 25, "Inspection, Testing and

Maintenance of Water-Based Fire Protection Systems" (2002 Edition, Section 5.3.1.1.1). Sample testing, if

performed, will continue at a 10-year interval following the initial testing.

U2 - 10/29/2014 14The Flux Thimble Tube Inspection Program will be enhanced as follows: The program will require that the interval between inspections be established such that no flux thimble tube is predicted to incur wear that exceeds the established

acceptance criteria before the next inspection. The program will require that re-baselining of the examination frequency be justified using plant-specific wear rate data unless prior plant-specific NRC acceptance for the re-baselining was received. If design changes are made to use more wear-resistant thimble tube materials, sufficient inspections will be conducted at an adequate inspection frequency for the new materials. The program will require that flux thimble tubes that cannot be inspected must be removed from service.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.1815 The Fuel Oil Chemistry Program will be enhanced as follows: U1 - 8/9/2013 B2.1.19 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 5 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Particulate contamination testing of fuel oil in the eleven fuel oil storage tanks in scope of License Renewal will

be performed, in accordance with ASTM D 6217, on an annual basis. One-time ultrasonic thickness measurements will be performed at selected tank bottom and piping locations prior to the period of extended operation.

U2 - 10/29/2014 16 A Fuse Holders Program will be implemented. Program features will be as described in LRA Section B2.1.20.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.20 17 An Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will be implemented. Program features will be as described in LRA Section B2.1.21 U1 - 8/9/2013 U2 - 10/29/2014 B2.1.21 18 An Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program will be implemented. Program features will be as described in LRA section B2.1.22.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.22 19 The Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Program will be enhanced as follows: Program implementing procedures will be revised to ensure the components and structures subject to inspection are clearly identified. Program inspection procedures will be enhanced to include the parameters corrosion and wear where omitted.U1 - 8/9/2013 U2 - 10/29/2014 B2.1.23 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 6 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number 20A Metal-Enclosed Bus Program will be implemented. Program features will be as described in LRA Section B2.1.26.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.26 21 For the Nickel-Alloy Nozzles and Penetrations Program, PINGP commits to the following activities for managing the aging of nickel-alloy components susceptible to primary water stress

corrosion cracking: Comply with applicable NRC orders, and Implement applicable NRC Bulletins, Generic Letters, and staff-accepted industry guidelines.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.27 22The Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Program will be enhanced as follows: The program will require that any deviations from implementing the appropriate required inspection methods of the NRC First Revised Order EA-03-009, "Issue of Order Establishing Interim Inspection

Requirements for Reactor Pressure Vessel Heads at

Pressurized Water Reactors," dated February 20, 2004 (Order), as amended, will be submitted for NRC review and approval in accordance with the Order, as amended. The program will require that any deviations from implementing the required inspection frequencies mandated by the Order, as amended, will be submitted for NRC review and approval in accordance with the Order, as amended. The program will require that relevant flaw indications detected during the augmented inspections of the upper U1 - 8/9/2013 U2 - 10/29/2014 B2.1.28 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 7 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number vessel head penetration nozzles will be evaluated in accordance with the criteria provided in the letter from Mr. Richard Barrett, NRC, Office of Nuclear Reactor

Regulation (NRR), Division of Engineering to Alex

Marion, Nuclear Energy Institute (NEI), dated April 11, 2003, or in accordance with NRC-approved Code Cases that incorporate the flaw evaluation procedures and criteria of the NRC's April 11, 2003, letter to NEI. The program will require that, if leakage or evidence of cracking in the vessel head penetration nozzles (including associated J-groove welds) is detected while ranked in the "Low," "Moderate," or "Replaced"

susceptibility category, the nozzles are to be immediately

reclassified to the "High" susceptibility category and the required augmented inspections for the "High" susceptibility category are to be implemented during the same outage the leakage or cracking is detected.

23 A One-Time Inspection Program will be completed. Program features will be as described in LRA Section B2.1.29.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.29 24A One-Time Inspection of ASME Code Class 1 Small-Bore Piping Program will be completed. Program features will be as described in LRA Section B2.1.30.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.30 25For the PWR Vessel Internals Program, PINGP commits to the following activities for managing the aging of reactor vessel internals components: Participate in the industry programs for investigating and managing aging effects on reactor internals; U1 - 8/9/2011 U2 - 10/29/2012 B2.1.32 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 8 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Evaluate and implement the results of the industry programs as applicable to the reactor internals; and Upon completion of these programs, but not less than 24 months before entering the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.

26The Reactor Head Closure Studs Program will be enhanced to incorporate controls that ensure that any future procurement of

reactor head closure studs will be in accordance with the material and inspection guidance provided in NRC Regulatory Guide 1.65.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.33 27The Reactor Vessel Surveillance Program will be enhanced as follows: A requirement will be added to ensure that all withdrawn and tested surveillance capsules, not discarded as of

August 31, 2000, are placed in storage for possible future reconstitution and use. A requirement will be added to ensure that in the event spare capsules are withdrawn, the untested capsules

are placed in storage and maintained for future insertion.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.34 28 The RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants Program will be enhanced as follows: The program will include inspections of concrete and U1 - 8/9/2013 U2 - 10/29/2014 B2.1.35 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 9 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number steel components that are below the water line at the

Screenhouse and Intake Canal. The scope will also require inspections of the Approach Canal, Intake

Canal, Emergency Cooling Water Intake, and

Screenhouse immediately following extreme environmental conditions or natural phenomena

including an earthquake, flood, tornado, severe thunderstorm, or high winds. The program parameters to be inspected will include an inspection of water-control concrete components that are below the water line for cavitation and erosion degradation. The program will visually inspect for damage such as cracking, settlement, movement, broken bolted and welded connections, buckling, and other degraded

conditions following extreme environmental conditions or natural phenomena.

29 A Selective Leaching of Materials Program will be completed.Program features will be as described in LRA B2.1.36.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.36 30 The Structures Monitoring Program will be enhanced as follows: The following structures, components, and component supports will be added to the scope of the inspections:

o Approach Canal o Fuel Oil Transfer House o Old Administration Building and Administration Building Addition U1 - 8/9/2013 U2 - 10/29/2014 B2.1.38 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 10 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number o Component supports for cable tray, conduit, cable, tubing tray, tubing, non-ASME vessels, exchangers, pumps, valves, piping, mirror

insulation, non-ASME valves, cabinets, panels, racks, equipment enclosures, junction boxes, bus

ducts, breakers, transformers, instruments, diesel equipment, housings for HVAC fans, louvers, and

dampers, HVAC ducts, vibration isolation

elements for diesel equipment, and miscellaneous electrical and mechanical equipment items o Miscellaneous electrical equipment and instrumentation enclosures including cable tray, conduit, wireway, tube tray, cabinets, panels, racks, equipment enclosures, junction boxes, breaker housings, transformer housings, lighting

fixtures, and metal bus enclosure assemblies o Miscellaneous mechanical equipment enclosures including housings for HVAC fans, louvers, and

dampers o SBO Yard Structures and components including SBO cable vault and bus duct enclosures.

o Fire Protection System hydrant houses o Caulking, sealant and elastomer materials o Non-safety related masonry walls that support equipment relied upon to perform a function that

demonstrates compliance with a regulated

event(s). The program will be enhanced to include additional inspection parameters.

Preliminary License Renewal Commitments Updated through 1/9/2009 Page 11 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number The program will require an inspection frequency of once every five (5) years for structures and structural components within the scope of the program. The

frequency of inspections can be adjusted, if necessary, to allow for early detection and timely correction of negative trends. The program will require periodic sampling of groundwater and river water chemistries to ensure they remain non-aggressive.

31A Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) Program will be implemented. Program features will be as described in LRA Section B2.1.39.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.39 32 The Water Chemistry Program will be enhanced as follows: The program will require increased sampling to be performed as needed to confirm the effectiveness of corrective actions taken to address an abnormal chemistry condition. The program will require Reactor Coolant System dissolved oxygen Action Level limits to be consistent with the limits established in the EPRI PWR Primary

Water Chemistry Guidelines."[Revised in letter dated 12/5/2008 in response to RAI B2.1.40-3]

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.40 33 The Metal Fatigue of Reactor Coolant Pressure Boundary Program will be enhanced as follows: The program will monitor the six component locations identified in NUREG/CR-6260 for older vintage U1 - 8/9/2013 U2 - 10/29/2014 B3.2 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 12 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or

by tracking the cumulative fatigue usage, including the

effects of coolant environment. The following locations

will be monitored:

o Reactor Vessel Inlet and Outlet Nozzles o Reactor Pressure Vessel Shell to Lower Head o RCS Hot Leg Surge Line Nozzle o RCS Cold Leg Charging Nozzle o RCS Cold Leg Safety Injection Accumulator Nozzle o RHR-to-Accumulator Piping Tee Program acceptance criteria will be clarified to require corrective action to be taken before a cumulative fatigue usage factor exceeds 1.0 or a design basis transient

cycle limit is exceeded. [Revised in letter dated 1/9/2009 in response to RAI 4.3.1.1-1]

34 Reactor internals baffle bolt fatigue transient limits of 1835 cycles of plant loading at 5% per minute and 1835 cycles of plant unloading at 5% per minute will be incorporated into the

Metal Fatigue of Reactor Coolant Pressure Boundary Program and USAR Table 4.1-8.

U1 - 8/9/2013 U2 - 10/29/2014 B3.2 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 13 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number 35NSPM will perform an ASME Section III fatigue evaluation of the lower head of the pressurizer to account for effects of insurge/outsurge transients. The evaluation will determine the

cumulative fatigue usage of limiting pressurizer component(s)

through the period of extended operation. The analyses will account for periods of both "Water Solid" and "Standard Steam

Bubble" operating strategies. Analysis results will be incorporated, as applicable, into the Metal Fatigue of Reactor

Coolant Pressure Boundary Program.[Revised in letter dated 1/9/2009 in response to RAI 4.3.1.1-1]

U1 - 8/9/2013 U2 - 10/29/2014 4.3.1.3 36NSPM will complete fatigue calculations for the pressurizer surge line hot leg nozzle and the charging nozzle using the methodology of the ASME Code (Subsection NB) and will

report the revised CUFs and CUFs adjusted for environmental effects at these locations as an amendment to the PINGP LRA. Conforming changes to LRA Section 4.3.3, "PINGP EAF Results," will also be included in that amendment to reflect analysis results and remove references to stress-based

fatigue monitoring.

[Added in letter dated 1/9/2009 in response to RAI 4.3.1.1-1] April 30, 2009 4.3.3 1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1121 January 9, 2009 L-PI-09-004 10 CFR 54

U S Nuclear Regulatory Commission

ATTN: Document Control Desk

Washington, DC 20555-0001

Prairie Island Nuclear Generating Plant Units 1 and 2

Dockets 50-282 and 50-306

License Nos. DPR-42 and DPR-60

Responses to NRC Requests for Additional Information Dated December 10, 2008 Regarding Application for Renewed Operating Licenses

By letter dated April 11, 2008, Norther n States Power Company, a Minnesota Corporation, (NSPM) submitted an Application for Renewed Operating Licenses (LRA) for the Prairie Island Nuclear Generating Plan t (PINGP) Units 1 and 2. In a letter dated December 10, 2008, the NRC transmitted Requests for Additional In formation (RAIs) regarding that application. This lette r provides responses to those RAIs.

provides the text of each RAI followed by the NSPM response.

provides an updated version of the Preliminary License Renewal Commitment List contained in the LRA trans mittal letter. This updated list reflects changes made to date in the various NSPM letters responding to NRC RAIs.

If there are any questions or if additional information is needed, please contact Mr. Eugene Eckholt, License Renewal Project Manager. Summary of Commitments This letter adds one new commitment and revi ses two commitments in the list of Preliminary License Renewal Commitm ents contained in the LRA transmittal letter dated April 11, 2008.

Preliminary License Renewal Commi tment No. 36 is added as follows:

NSPM will complete fatigue calculations for the pressurizer surge line hot leg nozzle and the charging nozzle using the methodology of the ASME Code (Subsection NB) and will report the revised CUFs and CUFs adjusted for

environmental effects at these loca tions as an amendment to the PINGP LRA. Conforming changes to LRA Section 4.3.3, "PINGP EAF Results," will Document Control Desk Page 2 also be included in that amendment to reflect analysis results and remove references to stress-bas ed fatigue monitoring.

This amendment will be submi tted by April 30, 2009.

Preliminary License Renewal Commitment No. 33 is revised as follows:

The Metal Fatigue of Reactor Coolant Pressure Boundary Program will be enhanced as follows:

The program will monitor the six component locations identified in NUREG/CR-6260 for older vintage Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or by tracking the cumulative fatigue usage, including the effects of coolant environment. The following locations will be monitored:

o Reactor Vessel Inlet and Outlet Nozzles o Reactor Pressure Vessel Shell to Lower Head o RCS Hot Leg Surge Line Nozzle o RCS Cold Leg Charging Nozzle o RCS Cold Leg Safety Inje ction Accumulator Nozzle o RHR-to-Accumulator Piping Tee Program acceptance criter ia will be clarified to require corrective action to be taken before a cumulative fatigue usage factor exceeds 1.0 or a

design basis transient cycl e limit is exceeded.

These enhancements will be implemented prior to the period of extended operation.

Preliminary License Renewal Commitment No. 35 is revised as follows:

NSPM will perform an ASME Section III fa tigue evaluation of the lower head of the pressurizer to acc ount for effects of insurge/

outsurge transients. The evaluation will determine the cumulative fatigue usage of limiting pressurizer component(s) through the period of extended operation. The analyses will account for periods of both "Water Solid" and "Standard Steam Bubble" operating strategies. Analysis results wil l be incorporated, as applicable, into the Metal Fatigue of Reactor Coolant Pressure Boundary Program.

This analysis and any associated program enhancements will be completed prior to the period of extended oper ation.

Document Control Desk Page 3 I declare under penalty of perjury that the foregoing is true and correct.

Executed on January 9, 2009.

/S/ Michael D. Wadley

Michael D. Wadley

Site Vice President, Prairie Island Nu clear Generating Plant Units 1 and 2 Northern States Power Company - Minnesota

Enclosures (2)

cc:

Administrator, Region III, USNRC License Renewal Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC

Prairie Island Indian Communi ty ATTN: Phil Mahowald Minnesota Department of Commerce

NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 1 RAI 4.3.1.1-1 Some of the reported CUF results were generated by FatiguePro software. However, FatiguePro is not endorsed by NRC staff, since FatiguePro does not produce all six individual components of a transi ent stress tensor (Sxx, Syy, Szz, Sxy, Syz, Szx) to support the American Society of Mechanical Engineers (ASME)Section III fatigue analysis method. FatiguePro produces only one stress component and uses that single stress component for fatigue evaluation.

Please identify from Tables 4.3-2 through 4.

3-8, if any, those it ems whose CUF values were calculated without using every indivi dual component of the transient stress tensors. The items that ar e identified must be reevaluat ed in accordance with the ASME Section III guidelines so that the fatigue results are valid and applicable to the period of extended operation. In addi tion, the staff noticed multiple occurrences of the terminology "stress-based monitoring" in the body of the LRA. If the plant does not have appropriate stress monitoring ca pability, use of such a terminology would be misleading. Please make appropriate corrections.

NSPM Response to RAI 4.3.1.1-1 LRA Section 4.3.1 (Page 4.3-2), "Cumulative Usage Factors" st ates that the cumulative usage factors reported in Sectio n 4.3.1, except as otherwise noted, are the design basis values and do not consider the effects of re actor water environment on fatigue life. The CUFs reported in Tables 4.3-2, 4.3-3, 4.3-4, 4.3-5, 4.3-6, and 4.3-7 are all calculated in accordance with ASME Section III using the values of six stress components versus time for the complete stress cycle, taki ng into account both the gross and local structural discontinuities and the therma l effects which vary during the cycle.

The calculations of Environmentally-Assist ed Fatigue in Secti on 4.3.3 of the LRA reported in Table 4.3-8 are based on ASME Se ction III CUFs with the exception of the pressurizer surge line hot leg nozzle safe end and the charging system nozzle for each

Unit. The unadjusted CUFs at both location s are based on FatiguePro stress-based fatigue analyses. NSPM is in the proce ss of performing ASME Code (Subsection NB) compliant fatigue calculations for the pr essurizer surge line hot leg nozzle and the charging nozzle and will report the revised CUFs and CUFs adjusted for environmental effects at these locations as an amendment to the PINGP LRA. Conforming changes to LRA Section 4.3.3, "PINGP EAF Results" will also be in cluded in that amendment to reflect analysis results and remove references to stress-based fatigue monitoring. This amendment will be submitted by April 30, 2009. This action is identified as Preliminary License Renewal Commitment No. 36.

In addition, to clarify NSPM's intention in regard to evaluating the effects of insurge/outsurge transients on the lower head of the pressurizer (and to eliminate a reference to stress-based fatigue monito ring), the following LR A changes are made:

In LRA Section 4.3.1.3, the last paragr aph on Page 4.3-10 and the first paragraph on Page 4.3-11 are deleted and replaced in their entirety with the following: NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 2 NSPM will perform an ASME Section III fatigue evaluation of the lower head of the pressurizer to account for e ffects of insurge/outsurge trans ients. The evaluation will determine the cumulative fatigue usage of li miting pressurizer component(s) through the period of extended operat ion. The analyses will account for periods of both "Water Solid" and "Standard Steam Bubble" operating strategies. Analysis results will be incorporated, as applicable, into the Metal Fatigue of Reactor Coolant Pressure Boundary Program. This analysis and any associated program enhancements will be completed prior to the period of extended operation. The Metal Fatigue of Reactor Coolant Pr essure Boundary Program will manage metal fatigue of the pressurizer due to insurge/outsurge transients in accordance with 10 CFR 54.21(c)(1)(iii).

The following additional LRA changes are also being made to eliminate references to stress-based fatigue monitoring:

In LRA Section A3.2, on Page A-17, the third sentence of the first paragraph is deleted and replaced in its entirety with the following: "The program also tracks fatigue usage in critical high-usage components."

In LRA Section B3.2, Program Description, on page B-84, the third sentence of the first paragraph is deleted and replaced in its entiret y with the following: "The program also tracks fatigue usage in critical high-usage components." In LRA Section B3.2, Enhancements, on page B-85, the first bulleted enhancement is deleted and replaced in its entirety with the following:

Scope of Program, Preventive Actions, Parameters Monitored/Inspected, Detection of Aging Effects, Monitoring and Trending

The program will monitor the six component locations identified in NUREG/CR-6260 for older vintage Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or by tracking the cumulative fatigue usage, including the effects of coolant environment. The following locations will be monitored:

NUREG/CR-6260 Location Reactor Pressure Vessel Inlet and Outlet Nozzles

Reactor Pressure Vessel Shell to Lower Head

RCS Hot Leg Surge Line Nozzle RCS Cold Leg Charging Nozzle RCS Cold Leg Safety Inje ction Accumulator Nozzle RHR-to-Accumulator Piping Tee To reflect the changes discussed above, two Preliminary License Renewal Commitments included in the LRA transmittal letter dated April 11, 2008, are also revised. NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 3 Preliminary License Renewal Commitment No. 33 is revised to read as follows:

Commitment Number Commitment Implementation Schedule Related LRA Section Number 33 The Metal Fatigue of Reactor Coolant Pressure Boundary Program will be enhanced as follows: The program will moni tor the six component locations identified in NUREG/CR-6260 for older vintage Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or by tracking the cumulative fatigue usage, including the effects of coolant environment. The following locations will be monitored:

o Reactor Vessel Inlet and Outlet Nozzles o Reactor Pressure Vessel Shell to Lower Head o RCS Hot Leg Surge Line Nozzle o RCS Cold Leg Charging Nozzle o RCS Cold Leg Safety Injection Accumulator Nozzle o RHR-to-Accumulator Piping Tee Program acceptance criteria will be clarified to require corrective action to be taken before a cumulative fatigue usage factor exceeds 1.0 or a design basis transient cycle limit is exceeded. U1 - 8/9/2013 U2 - 10/29/2014 B3.2 Preliminary License Renewal Commitment No. 35 is revised to read as follows:

Commitment Number Commitment Implementation Schedule Related LRA Section Number 35 NSPM will perform an ASME Section III fatigue evaluation of the lower head of the pressurizer to account for effects of insurge/outsurge transients. The evaluation will determine the cumulative fatigue usage of limiting pressurizer component(s) through the period of extended operation. The analyses will account for periods of both "Water Solid" and "Standard Steam Bubble" operating strategies. Analysis results will be incorporated, as applicable, into the Metal Fatigue of Reactor Coolant Pressure Boundary Program. U1 - 8/9/2013 U2 - 10/29/2014 4.3.1.3 NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 4 RAI 4.3.1.2-1 The design cycles and the projected 60-y ear cycles for Prairie Island Nuclear Generating Plant's (PINGP's) design basis transients are shown in Table 4.3-1 of the LRA. The staff has noted that the paragraph under LRA Table 4.3-4 of the LRA, which discusses the plant loading and unloading trans ient cycles, is vague. In the targeted paragraph, an unrelated/unrecognized number, 1835, which is not shown in Table 4.3-1, is suddenly brought up. Clarify and indica te the source of this 1835 number and clarify whether this value represents the new design basis cycle values for the baffle bolts.

NSPM Response to RAI 4.3.1.2-1 As part of the planned Measurement Unce rtainty Recapture-Power Uprate (MUR-PU) project and fuel transition, NSPM has recent ly completed a fatigue evaluation of the Reactor Vessel (RV) lower internals. Fati gue analyses of the RV lower internals are not part of the PINGP CL B but were conservatively included to evaluate the proposed MUR-PU and fuel transition. Fatigue usage at all RV lower internal locations, with the exception of the baffle bolts, was determined using the full set of design transients defined in Table 4.3-1 of t he PINGP LRA. For the baffl e bolts, the number of plant loading and unloading transients at 5% of full power per minut e was decreased from 18,300 to 1,835 to obtain a usage factor below 1.0. Therefore, the baffle bolts are limited to 1,835 loading and unloading cycles at 5% of full po wer per minute, which is a new design basis cycle value for the baffle bol ts. As discussed in PINGP LRA Section B3.2, the Metal Fatigue of Reactor C oolant Pressure Boundar y Program and PINGP USAR Table 4.1-8 will be enhanced to include th is additional cyclic limit for baffle bolt fatigue.

RAI 4.3.1.3-1

To project the cycles and cumulative usage factor (CUF) to t he period of extended operation, it is necessary to have the bas e line information. Before the dates of issuance of NRC Bulletins 88-08 and 88-11, there wasn't any data collected regarding stratification and insurge/outsurge ev ents for pressurizer surge lines.

Please discuss how you reconstructed the cycl es that occurred prior to December 20, 1988 (the date of issuance for Bulletin 88-11), for the pressurizer surge line stratification events and insurge/outsurge events. Please provide the date when the events tracking began and discuss how the tracked data was used to achieve the 60-year cycle projection.

NSPM Response to RAI 4.3.1.3-1 As described in Section 4.3.1.6 of the PINGP LRA (Page 4.3-16), the site-specific evaluations of the pressurizer surge line (i.e., WCAP-12839 for Unit 1 and WCAP-12639 for Unit 2) are considered TLAAs since the evaluations use time-limited assumptions NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 5 such as thermal and pressure transients, and operating cycles. The dominant event cycles that contribute to fatigue in the surge line analyses are the 200 heatups and cooldowns that include stratification and st riping in the pressurizer surge line. The surge line temperature transients during heatup and cooldown are characterized in WCAP-12839 and WCAP-12639 by maximum system differential temperatures between the pressurizer water and RCS hot leg that o ccur over five RCS temperature ranges. The system differential temperature ranges were used to define the stratification events and insurge/outsurge events for t he purpose of the analyses.

In order to ensure that the pressurizer surge line analyses were bounding for PINGP, the actual system differentia l temperatures (maximum te mperature differential between pressurizer and RCS hot leg) were obtained for each Unit heatup and cooldown since initial plant operation.

Unit 1 differential temperature data was recorded beginning in 1973, and Unit 2 differential temperature data was recorded beginning in 1974.

Following completion of the pressurizer surge line thermal stratification analyses in the early 1990s, PINGP continues to monito r temperature differentials between the pressurizer water and RCS hot leg as requir ed by the Metal Fatigue of Reactor Coolant Pressure Boundary Program to ensure that plant operation is within the bounds of the pressurizer surge line transient definitions contained in WCAP-12839 and WCAP-12639. As stated previously, the dominant event cycles that contribute to surge line stratification and insurge/outsurge events ar e the plant heatups an d cooldowns, which are limited by design to 200. As described in Section 4.3.1 and Table 4.3-1 of the PINGP LRA, the number of heatups and cooldowns projected to be accumulated after 60 years of operation (i.e., approximately 125) is less than the number of cycles used to calculate fatigue of the surge line in WCAP-12839 for Unit 1 and WCAP-12639 for Unit

2.

RAI 4.3.1.4-1 Table 4.3-6 of the LRA shows the CUF val ues at certain components in the steam generators. It is understood that the CUF val ues for Unit 1, reflect steam generator replacement (occurred in November 2004), therefore the CUF at the corresponding components/locations of Units 1 and 2, ar e expected to be somewhat different. However, for the primary inlet nozzle and prim ary outlet nozzle, the differences between Unit 1 and Unit 2, are significant. Specifically, at these two nozzles, the CUF is as high as 0.880 for the original steam generator (Uni t 2) but it is dropped to near zero, 0.007, for the replaced one (Unit 1). Explain how this is possible. Specify the analytical tool used along with a discussion concerning differences in the input data.

NSPM Response to RAI 4.3.1.4-1 As noted in Section 4.3.1.

4 of the PINGP LRA (Page 4.3-11), the primary and secondary sides of the steam generators are Class 1 and were designed in accordance with ASME Section III, 1995 Edition thr ough 1996 Addenda for Unit 1 and 1965 Edition NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 6 through Winter 1966 Addenda for Un it 2. The cumulative usage factors for the steam generator primary inlet and outlet nozzles were calculated by AREVA NP for the Unit 1 replacement steam generators (RSGs) in 2004, and by Westinghouse Electric Corporation for the Unit 2 original steam generators (OSG s). The differences in reported cumulative usage factors (CUFs) in the nozzle base metal may be attributed to one or a combination of the following: (1) differences between the Unit 1 and Unit 2 nozzle geometry and materials of construction, (2) differences in design transients and external nozzle loads and moments used in the fatigue evaluations, or (3) differences in methodology of CUFs. Each potential difference is discussed below.

The Unit 1 primary inlet and outlet nozzl es are forged with t he primary head and are fabricated from low alloy st eel (SA 508 Grade 3 Class 2). The Unit 2 primary inlet and outlet nozzles were cast wit h the primary head and ar e fabricated from carbon steel (SA 216 Grade WCC). The thicknesses of the Unit 1 nozzles are less than the Unit 2 nozzles due to differences in materials of construction. T he geometry of the Unit 1 and Unit 2 nozzles are both similar to ASME Section III, Figure NB-3338.2(a)-2, Figure (c), with the only significant difference being the nozzle thicknesses. Due to differences in materials of construction and wall thickness t he Unit 1 nozzles will respond quicker to design temperature transients, through-wall gradients will be reduced, and thermal stresses are expected to be lower than the Unit 2 nozzles when exposed to equivalent thermal transients.

The design transients used in the fatigue eval uation of the Unit 1 and Unit 2 inlet and outlet nozzles are based on the Westinghouse standard NSSS design transients and are consistent between Units 1 and 2. These design transients are listed in Table 4.3-1 of the PINGP LRA. External loads and moments applied to the nozzles are in accordance with design specifications for bo th units. For the Unit 1 RSGs it was necessary to perform a new reactor coolant loop analysis with the RSGs explicitly modeled. The resultant loads generated for t he vessel nozzles were compared to those provided for the original steam generator. Bounding loads were selected and used in the stress analysis of the Unit 1 RSG inlet and outlet nozzles. Therefore, the loads and moments applied to the Unit 1 nozzles are equivalent to or bound the loads and moments used for the OSG Unit 2 stress analysis of the nozzles.

The calculation of the primary nozzle CUFs performed in 2004 for Unit 1 is based on finite element analysis to determine temper ature fields in thermal calculations, and stress and displacement fields in mechanica l or thermo-mechanical calculations. The finite element analysis result s are interpreted using post-processing programs to permit stress analyses in accordance with ASME Section III, Subsection NB. Usage factors were calculated in accordance with NB-3222.

4 (e)(5) using loadset pairs based on the NSSS design transients. The maximum calculated CUF of 0.007 for the primary inlet nozzle was calculated at the inside surface of the primary inlet nozzle base metal.

The calculation of the primary nozzle CUFs performed in 1969 for Unit 2 is based on photoelastic and thermal transient analyses c onsidering the worst case normal and upset loading conditions. The maximum peak stress intensity considering worst case normal and upset conditions was conservative ly applied for the to tal number of design NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 7 cyclic applications (i.e., 24,000 cyclic applic ations for all transients the unit must undergo, which bounds the applicable design tr ansients in Table 4.3-1 of the PINGP LRA). This resulted in a very conservative cumulative usage factor of 0.88 for the inside surface of the primary in let nozzle base metal.

In summary, the differences between the usage factors for the Unit 1 and Unit 2 steam generator primary inlet and outlet nozzles are a ttributed to differences in materials of construction, wall thickness, and calculation methods used to perform the CUF calculations. The Unit 2 evaluation was per formed using a peak stress intensity for the worst case transient applied to the NSSS design transients, whereas the Unit 1 calculation considered individual usage contributions due to loadset pairs for the NSSS design transients. In addition, the Unit 2 evaluation was performed prior to the development of detailed finite element st ress analysis computer codes and was very conservative.

RAI 4.3.1.4-2 In LRA Section 4.3.1.4, the applicant di scusses fracture mechanics analyses for the steam generator feedwater nozzle and perform ed fracture mechanics analyses to justify leaving the eroded thermal sleeves in the as-found condition. Clarify why the fracture mechanics evaluation/flaw evaluation for t he steam generator feed water nozzles are considered to be a time-limited aging analysis (TLAA) that meets the definition for TLAAs in 10 CFR 54.3.

NSPM Response to RAI 4.3.1.4-2 The Steam Generator Fatigue and Fracture Mechanics Eval uation of Feedwater Inlet Nozzle discussion was conservatively includ ed in LRA Section 4.3.1.4 even though the analysis did not meet a ll six criteria in 10 CF R 54.3(a) for defining a TLAA. In particular, the analysis did not meet criterion (3) in that it did not "Involve time-limited assumptions defined by the current operati ng term, for example, 40 y ears." The crack growth analysis does not provide a basis for demonstrat ing that a known flaw is acceptable for continued operation for the life of the plant. The analysis simply defined an appropriate examination frequency (nominally each 100 days of operation in Modes 2 or 3) that is based on a postulated flaw of a certain size.

There were no known flaws in the steam generator feedwater nozzle region of interest. Therefore, since the crack growth analysis is not managing an actual (existing) crack and the analysis was not performed for the service life of the component (i.e., 40 years), this eval uation is not a TLAA.

NSPM monitors the Unit 2 feedwater nozzle to pipe transition forging welds for evidence of cracking using ultrasonic inspection thr ough owner elected examinations maintained within the PINGP ASME Section XI Inservic e Inspection, Subsections IWB, IWC, and IWD Program. (Refer to "Subm ittal of the 4th Interval Inservice Inspection Plan - Units 1 & 2", June 21, 2004, L-PI-04-076, ADAMS Accession Number ML041800468.) The periodic examinations ensure t hat the feedwater nozzle region remains free of cracking.

NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 8 NSPM has determined that this discussion should be removed from the LRA.

Accordingly, the following changes are made:

In LRA Table 4.1-2 on Page 4.1-8, the line item for inservice flaw growth analyses that demonstrate structural stability for 40 year s is hereby revised to appear as follows:

NUREG-1800 Generic TLAA Examples Applicability to PINGP LRA SectionInservice flaw growth analyses that demonstrate structural stability for 40 years No - Did not meet TLAA criteria - In LRA Section 4.3.1.4 on Pages 4.3-12 and 4.

3-13, the section ent itled "Fatigue and Fracture Mechanics Evaluation of Feedwater Inlet Nozzle" is hereby deleted in its entirety.

RAI 4.3.1.5-1 In Section 4.3.1.5 of the LRA, the applicant states t hat "Exemption from fatigue evaluation was justified for the casing feet, casing nozzle, and upper and lower seal housings and bolts," without supporting this statement wit h a regulatory basis. Provide your technical and regulatory basis for exem pting the reactor coolant pump casing feet, casing nozzle, and upper and lower seal housi ngs and bolts from being within the scope of an ASME Section III CUF analysis.

NSPM Response to RAI 4.3.1.5-1 As described in Section 4.3.1.5 of the PINGP LRA, the reactor coolant pumps (RCPs) were designed in accordance with Article 4 of ASME Section III through the 1970 Winter Addendum. Exemption from fatigue evaluation was justified in accordance with ASME Section III, Article 415.1, for the casing feet, casing nozzle, and upper and lower seal housings and bolts. The applicable RCP calculations to show compliance with Article N-415.1, (a) through (f) are based on design transients that bound those presented in LRA Table 4.3-1, and are intende d to represent 40 years of operation. The numbers of analyzed design transients used in the RCP exemption from fa tigue analyses required by Article N-415.1 for the casing feet, casing nozzle, and upper and lower seal housings and bolts, will not be exceeded in 60 years of operation, and these TLAAs will remain valid through the period of exten ded operation in accordance with 10 CFR 54.21(c)(1)(i).

RAI 4.3.3-1 It is known that some of the reactor c oolant system piping charging nozzles are designed and manufactured with a thermal sleeve and some are not.

Please confirm whether or not a thermal sl eeve exists in the charging nozzle, and confirm that the stress and fatigue analyse s were performed based on the actual NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 9geometric conditions of the charging nozzle in use, so that the fatigue results are valid and applicable to the period of extended operation.

NSPM Response to RAI 4.3.3-1

Each Unit at PINGP has one 2.

0 inch stainless steel chargi ng line that connects to a 27.5 inch I.D. stainless steel reactor coolant cold leg pipe. Each charging line to RCS pipe connection is made using a stainless steel half coupling (i.e., charging nozzle) that contains a thermal sleeve fabricated from Type 316 stainless steel. Both charging line to RCS cold leg pipe connections at PINGP contain a thermal sleeve.

These connections were originally designe d in accordance with B31.1.0 and did not include cumulative usage factor evaluations. In order to address environmentally-assisted fatigue for license renewal, PINGP performed stress-based fatigue analyses of the charging nozzles using FatiguePro as described in Section 4.

3.3 of the PINGP LRA (Page 4.3-24). The charging nozzle finite element model used in the FatiguePro evaluation was developed us ing the appropriate geometry of the PINGP charging nozzles and thermal sleeves, as detailed on pl ant fabrication drawings. As discussed in the response to RAI 4.3.1.1-1 above, however, NSPM has elected to perform an ASME Section III, NB-3200, fatigue analysis of the charging nozzles. The updated usage factor will be used to evaluate the effects of reactor water environment on the fatigue life of the charging nozzles. The finite elem ent model associated with the ASME Section III analyses will be based upon the charging nozzle geometry as defined by PINGP drawings.

RAI 4.3.3-2 LRA Section 4.3.3 discusses environmentally assisted fati gue (GSI-190) and provides values of the environmentally assi sted fatigue correction factors, F en, applicable to PINGP. In the ca lculation of F en for the low alloy steels, the applicant assumes that the dissolved oxygen level for pressurized-wa ter reactor plants is below 0.05 ppm at temperatures above 150 oC. This assumption in effect takes away the dependency of F en on strain rate and sulfur content and al so significantly weakens the dependency of F en on temperature. Provide your basis for using this assumption.

NSPM Response to RAI 4.3.3-2 At PINGP, RCS te mperatures above 150 o C (302 o F) correspond to operation in Mode 4 (Hot Shutdown, 350 o F > Tavg > 200 o F), Mode 3 (Hot Standby, Tavg >

350 o F), Mode 2 (Startup), or Mode 1 (Power O peration). PINGP controls oxygen in the Reactor Coolant System (RCS) by maintaining a hydrogen overpressure in the Volume Control Tank.

Minimum primary water hydrogen levels are main tained which are effective in mitigating oxidizing conditions due to radiolysis or oxygen ingress into the reactor coolant.

The control parameters for RCS dissolved ox ygen are in accordance with the PINGP Water Chemistry Program and the PINGP Technical Requirements Manual (TRM) NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 10which specify a dissolved oxygen action level limit of less than 100 ppb in Modes 1, 2, 3, and Mode 4 with RCS Temperature >

250 oF. Per the TRM, if the limit is exceeded, the dissolved oxygen shall be restored to less than 100 ppb within a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period or the Unit shall be shutdown. At PINGP, dissolved oxygen in the RCS is typically less than 5 ppb prior to criticality (Modes 2, 3, and 4) and 0 ppb during power operation (Mode 1). In addition, a review of PI NGP RCS water chemistry data from 1999-2008 was performed. The review confirmed that the dissolved oxygen content in the RCS never exceeded 40 ppb (0.04 ppm) when the RCS temperature was greater than 300 o F. Therefore, given the past plant oper ating history and adherence to action level limits, it is reasonable to assume that the dissolved oxy gen level in the RCS at PINGP has been and will continue to be maintained below 0.05 ppm (50 ppb) at RCS temperatures above 150 o C (302 o F).

RAI 4.7.4-1 License renewal application (LRA) Section

4.7.4 indicates

that the polar cranes, auxiliary building cranes, the turbine building cranes, and spent fuel cranes will be used less than 20,000 lifting cycles over 60 years.

Provide your estimate for the number of lifting cycles that have occurred in each of the stated cranes and your 60-year lifti ng cycle projections for these cranes.

NSPM Response to RAI 4.7.4-1 The NUREG-0612 cranes with fatigue TLAAs in clude the polar cranes, auxiliary building crane, the turbine building cranes, and spent f uel crane. These cranes are described in Section 12.2.12 of the PINGP USAR.

Polar Crane, Auxiliary Buildi ng Crane, Turbine Building Crane

In accordance with the Norther n States Power Company (NSP) letter to the NRC dated November 8, 1982, titled "Control of Heavy Loads (Response to Staff Concerns on the Six Month Submittal)", in the Response to Inquiry 4 on page 8, the evaluation of fatigue for the polar crane, auxili ary building crane, and turbin e building crane assumed 800 design loading cycles for the heaviest load over 40 years. This allowed for two outages per year and ten lifts of the heaviest load per outage over 40 years. Multiplying 800 heavy load cycles by 1.5 to accommodate 60 years of operation yields a projection of 1200 heavy load cycles through the period of extended operation, providing significant margin to the design load cycle limit of 20,000 cycles.

At present (January 2009), both PINGP Units have completed 25 refueling outages.

Multiplying 10 lifts of the heaviest load per outage by 25 re fueling outages yields an estimate of 250 heavy load cycles to date fo r the polar cranes and turbine building cranes, and an estimate of 500 heavy load cycles to date for the auxil iary building crane since it services both Units. Based upon the estimated number of heavy lifting cycles NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 11 accrued to date, it is not expected that these cranes will atta in the projected number of lifts (i.e., 1200) after 60 years of operation.

Spent Fuel Crane In accordance with the NSP letter to the NRC dated November 8, 1982, titled "Control of Heavy Loads (Response to Staff Concerns on the Six Month Submittal)", Attachment 1, in the Response to Inquiry 4 on page 1-4, the evaluation of fatigue for the spent fuel crane assumed 800 design loading cycles over 40 years. The weight of the largest actual load, 3700 lbs., is substantially le ss than the rated crane capacity of 6000 lbs. The use of 800 design load cycles allowed for two outages per year and ten lifts of the

heaviest load per outage over 40 years. Multiplying 800 hea vy load cycles by 1.5 to accommodate 60 years of operation yields a projection of 1200 heavy load cycles through the period of extended op eration, providing significant margin to the design load cycle limit of 20,000 cycles.

At present (January 2009), both PINGP Units have completed 25 refueling outages.

Since the single spent fuel crane services both Units, it is expected to have been utilized for 50 refueling outages to date. Multiplying 10 lifts of the heaviest load per outage by 50 refueling outages yields an esti mate of 500 heavy load cycles to date for the spent fuel crane. Bas ed upon the estimated number of heavy lifting cycles accrued to date, it is not expected t hat the spent fuel crane will attain the projected number of lifts (i.e., 1200) after 60 years of operation.

RAI AMP B2.1.3-2 During review of LRA Section B2.1.3, "Operat ing Experience," the st aff noted that there were two instances of cracking due to in tergranular stress corrosion cracking (IGSCC) of Safety Injection Accumulator Tanks. Al though these cracks were repaired and the In-service Inspection Program was augmented to include additional inspections, such as ultrasonic testing and liquid penetrant inspecti on, the applicant did not indicate if new activities were implemented to improve and monitor the environment to preclude IGSCC. Please provide details of any prev entive activities to preclude IGSCC.

NSPM Response to RAI AMP B2.1.3-2 The leak detected in January 1988 in the Unit 2 Safety Injection 22 Accumulator Tank water level sensing line was a result of intergranular stress co rrosion cracking (IGSCC) that initiated as a consequence of high stre sses caused by the improper fit-up of the pipe to the nozzle in preparation for welding.

The leak was repaired. Evaluation of the nozzle leakage resulted in the periodic inspection (ultrasonic and dye penetrant

examinations) of the Unit 1 and 2 Safety Injection Accumulator nozzles on a 10-year frequency.

In May 2005, cracks were found in the leve l transmitter nozzles on the 21 Accumulator Tank in Unit 2. The affected nozzles were replaced. Metallurgical analysis indicated NSPM Responses to NRC Requests for Additional Information Dated December 10, 2008 12the cracking mechanism to be IGSCC initiated by sensitization of the stainless steel components during post-weld heat treatment of the t anks. The apparent cause evaluation concluded that the best method for the management of nozzle cracking was periodic monitoring, including internal visu al inspection and dye pe netrant examination, in addition to the external ultrasonic examinat ion. The current examination frequency is once every third refueling outage.

The Safety Injection Accumulator nozzle exam inations are owner elected examinations maintained within the PINGP ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD Program. The nozzles are also periodically visually inspected (VT-2) for leakage as required by the IW B, IWC, and IW D Program.

The primary pressure boundary piping of PWRs has generally not been found to be affected by SCC because of low dissolved oxyg en levels and control of primary water chemistry. However, the pot ential for SCC exists due to inadvertent introduction of contaminants into the primary coolant syst em. The PINGP Wate r Chemistry Program periodically monitors water chemistry and co ntrols detrimental contaminants (such as chlorides, fluorides, dissolved oxygen, and sulfat e) to levels below those known to result in cracking. Plant procedures require wa ter chemistry control in accordance with Revision 5 of the "PWR Primary Water C hemistry Guidelines", EPRI TR-1002884, for primary and auxiliary water systems. EPRI water chemistry guidelines are based on substantial industry experi ence and laboratory analysis. The program has been effective in controlling plant chemistry and taking required actions to address out-of-specification values.

In the examples described above, conditions were identified and corrected prior to causing any significant impact to safe oper ation or loss of intended functions. No additional preventive activities were impl emented beyond continuing with the existing mitigative features of the Water Chemis try Program. The PI NGP ASME Section XI Inservice Inspection, Subsections IW B, IWC, and IWD Pr ogram and the Water Chemistry Program effectively manage the condition of the pr essure retaining components within the license renewal boundary and ensure the associated aging effects such as cracking are adequately managed. Appropriate guidance is contained in PINGP procedures for indications of degr adation requiring reeval uation, repair, or replacement.

Enclosure 2 Updated Preliminary License Renewal Commitment List

13 Pages Preliminary License Renewal Commitments Updated through 1/9/2009 Page 1 of 13 The following table provides the list of preliminary commitments included in the Application for Renewed Operating Licenses (LRA) for Prairie Island Nuclear Generatin g Plant (PINGP) Units 1 and 2. These commi tments reflect the contents of the LRA as submitted, and any updates provided in subsequent correspondence, but are consider ed preliminary in th at the specific wording of some commitments may c hange, and additional commitments may be made, during the NRC review of the LRA. The final commitments as submitted by NSPM, and accepted by NRC, are expected to be confirmed in the NRC's Safety Evaluation Report (SER) for the renewed op erating licenses. The final commitments, as confirmed in the SER, will become effective upon NRC issuance of the renewed operating licenses. In addition, as stated in the LRA, the final commitments will be incorporated into the Updated Safety Analysis Report (USAR).

Commitment Number Commitment Implementation Schedule Related LRA Section Number 1 Each year, following the submittal of the PINGP License Renewal Application and at l east three months before the scheduled completion of the NRC review, NMC will submit

amendments to the PINGP application pursuant to 10 CFR 54.21(b). These revisions will identify any changes to the Current Licensing Basis that materi ally affect the contents of the License Renewal Application, including the USAR supplements.

12 months after LRA submittal

date and at least

3 months before

completion of NRC review 1.4 2 Following the issuance of the renewed operating license, the summary descriptions of aging management programs and TLAAs provided in Appendix A, and the final list of License Renewal commitments, will be in corporated into the PINGP USAR as part of a periodic USAR update in accordance with 10

CFR 50.71(e). Other changes to specific sections of the PINGP USAR necessary to reflect a renewed operating license will also be addressed at that time.

First USAR update in accordance with 10 CFR 50.71(e)

following issuance of renewed operating licenses A1.0 3 An Aboveground Steel Tanks Program will be implemented.

Program features will be as descr ibed in LRA Section B2.1.2.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.2 4 Procedures for the conduct of inspections in the External Surfaces Monitoring Program, St ructures Monitoring Program, U1 - 8/9/2013 U2 - 10/29/2014 B2.1.6 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 2 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Buried Piping and Tanks Inspecti on Program, and the RG 1.127 Inspection of Water-Control Structures Associated with Nuclear Power Plants Program will be enhanced to include guidance for

visual inspections of installed bolting. 5 A Buried Piping and Tanks Inspection Program will be implemented. Program features will be as described in LRA Section B2.1.8.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.8 6 The Closed-Cycle Cooling Water System Program will be enhanced to include an internal visual examination of

accessible surfaces of compon ents serviced by closed-cycle cooling water when the syst ems or components are opened during scheduled maintenance or surveillance activities.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.9 7 The Compressed Air Monitoring Program will be enhanced to require that Station and Instru ment Air System air quality be monitored and maintained in accordance with the instrument air

quality guidance provided in I SA S7.0.01-1996. Particulate testing will be revised to use a particle size methodology as

specified in ISA S7.0.01.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.10 8 An Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will be completed. Program features will be as described in LRA Section B2.1.11.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.11 9 An Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will be implemented. Program features will be as described in LRA Section B2.1.12.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.12 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 3 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number 10 An Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualific ation Requirements Used in Instrumentation Circuits Program will be implemented. Program features will be as described in LRA Section B2.1.13.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.13 11 The External Surfaces Monitoring Program will be enhanced as follows: The scope of the program will be expanded as necessary to include all metallic and non-metallic components

within the scope of license renewal that require aging management in accordance with this program. The program will ensure t hat surfaces that are inaccessible or not readily visible during plant operations will be inspected durin g refueling outages. The program will ensure t hat surfaces that are inaccessible or not readily visible during both plant operations and refueling outages will be inspected at intervals that provide reasonable assurance that aging effects are managed such that the applicable components will perform their intended function during

the period of ex tended operation.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.14 12 The Fire Protection Program will be enhanced to require periodic visual inspection of the fire barrier walls, ceilings, and

floors to be performed during walkdowns at least once every refueling cycle. [Revised in letter dated 12/5/2008 in response to RAI B2.1.15-3] U1 - 8/9/2013 U2 - 10/29/2014 B2.1.15 13 The Fire Water System Program will be enhanced as follows: U1 - 8/9/2013 B2.1.16 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 4 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number The program will be expanded to include eight additional yard fire hydrants in the scope of the annual visual inspection and flushing activities. The program will require that sprinkler heads that have been in place for 50 years will be replaced or a

representative sample of sprinkler heads will be tested using the guidance of NFPA 25, "Inspection, Testing and Maintenance of Water-Based Fire Protection Systems" (2002 Edition, Section 5.3.1.

1.1). Sample testing, if performed, will continue at a 10-year interval following the initial testing.

U2 - 10/29/2014 14 The Flux Thimble Tube Inspec tion Program wil l be enhanced as follows: The program will require t hat the interval between inspections be established such that no flux thimble tube is predicted to incur wear that exceeds the established acceptance criteria before the next inspection. The program will require that re-baselining of the examination frequency be justif ied using plant-specific wear rate data unless prior plant-specific NRC acceptance for the re-baselining was received. If design changes are made to use more wear-resistant thimble tube materials, sufficient inspections will be conducted at an adequate inspection frequency for the new materials. The program will require that flux thimble tubes that cannot be inspected must be removed from service.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.18 15 The Fuel Oil Chemistry Pr ogram will be enhanced as follows: U1 - 8/9/2013 B2.1.19 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 5 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Particulate contamination test ing of fuel oil in the eleven fuel oil storage tanks in sc ope of License Renewal will be performed, in accordance with ASTM D 6217, on an annual basis. One-time ultrasonic thickness measurements will be performed at selected tank bottom and piping locations prior to the period of extended operation.

U2 - 10/29/2014 16 A Fuse Holders Program will be implemented. Program features will be as described in LRA Section B2.1.20.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.20 17 An Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will be implemented. Program features will be as described in LRA Section B2.1.21 U1 - 8/9/2013 U2 - 10/29/2014 B2.1.21 18 An Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program will be implemented. Program features will be as described in LRA section B2.1.22.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.22 19 The Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Program will be enhanced as follows: Program implementing procedures will be revised to ensure the components and structures subject to inspection are clearly identified. Program inspection procedures will be enhanced to include the parameters corrosion and wear where omitted. U1 - 8/9/2013 U2 - 10/29/2014 B2.1.23 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 6 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number 20 A Metal-Enclosed Bus Program will be implemented. Program features will be as described in LRA Section B2.1.26.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.26 21 For the Nickel-Alloy Nozzles and Penetrations Program, PINGP commits to the following activi ties for managing the aging of nickel-alloy components susceptib le to primary water stress corrosion cracking: Comply with applicable NRC orders, and Implement applicable NRC Bull etins, Generic Letters, and staff-accepted industry guidelines.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.27 22 The Nickel-Alloy Penetration No zzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Program will be enhanced as follows: The program will require that any deviations from implementing the appropria te required inspection methods of the NRC First Revised Order EA-03-009, "Issue of Order Establishing Interim Inspection

Requirements for Reactor Pressure Vessel Heads at

Pressurized Water Reactors," dated February 20, 2004 (Order), as amended, will be submitted for NRC review and approval in accordance with the Order, as amended. The program will require that any deviations from implementing the required inspection frequencies mandated by the Order, as amended, will be submitted for NRC review and approval in accordance with the Order, as amended. The program will require that relevant flaw indications detected during the augmented inspections of the upper U1 - 8/9/2013 U2 - 10/29/2014 B2.1.28 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 7 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number vessel head penetration nozzles will be evaluated in accordance with the criteria provided in the letter from Mr. Richard Barrett, NRC, Offi ce of Nuclear Reactor Regulation (NRR), Division of Engineering to Alex

Marion, Nuclear Energy Inst itute (NEI), dated April 11, 2003, or in accordance with NRC-approved Code Cases that incorporate the flaw evaluation procedures and criteria of the NRC's April 11, 2003, letter to NEI. The program will require that , if leakage or evidence of cracking in the vessel head penetration nozzles (including associated J-groove welds) is detected while ranked in the "Low," "Moderate," or "Replaced" susceptibility category, the no zzles are to be immediately reclassified to the "High" susceptibility category and the required augmented inspec tions for the "High" susceptibility category are to be implemented during the same outage the leakage or cracking is detected.

23 A One-Time Inspection Program will be completed. Program features will be as described in LRA Section B2.1.29.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.29 24 A One-Time Inspection of ASME Code Class 1 Small-Bore Piping Program will be completed.

Program featur es will be as described in LRA Section B2.1.30.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.30 25 For the PWR Vessel Internals Program, PINGP commits to the following activities for managing the aging of reactor vessel internals components: Participate in the industry programs for investigating and managing aging effects on reactor internals; U1 - 8/9/2011 U2 - 10/29/2012 B2.1.32 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 8 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Evaluate and implement the results of the industry programs as applicable to the reactor internals; and Upon completion of these programs, but not less than 24 months before enteri ng the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.

26 The Reactor Head Closure Studs Program will be enhanced to incorporate controls that ensure that any future procurement of reactor head closure studs will be in accordance with the material and inspection guidance provided in NRC Regulatory Guide 1.65.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.33 27 The Reactor Vessel Surveillance Program will be enhanced as follows: A requirement will be added to ensure that all withdrawn and tested surveillance capsules, not discarded as of

August 31, 2000, are placed in storage for possible future reconstitution and use. A requirement will be added to ensure that in the event spare capsules are withdraw n, the untested capsules are placed in storage and maintained for future insertion.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.34 28 The RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants Program will be enhanced as follows: The program will include inspections of concrete and U1 - 8/9/2013 U2 - 10/29/2014 B2.1.35 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 9 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number steel components that are bel ow the water line at the Screenhouse and Intake Canal. The scope will also require inspections of the Approach Canal, Intake

Canal, Emergency Cooling Water Intake, and

Screenhouse immediately following extreme environmental conditions or natural phenomena

including an earthquake, flood, tornado, severe thunderstorm, or high winds. The program parameters to be inspected will include an inspection of water-control concrete components that

are below the water line for cavitation and erosion degradation. The program will visually inspect for damage such as cracking, settlement, mo vement, broken bolted and welded connections, bu ckling, and other degraded conditions following extreme environmental conditions or natural phenomena.

29 A Selective Leaching of Material s Program will be completed.

Program features will be as described in LRA B2.1.36.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.36 30 The Structures Monitoring Program will be enhanced as follows: The following structures, components, and component supports will be added to the scope of the inspections:

o Approach Canal o Fuel Oil Transfer House o Old Administration Building and Administration Building Addition U1 - 8/9/2013 U2 - 10/29/2014 B2.1.38 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 10 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number o Component supports for c able tray, conduit, cable, tubing tray, tubing, non-ASME vessels, exchangers, pumps, valves, piping, mirror

insulation, non-ASME valv es, cabinets, panels, racks, equipment enclosures, junction boxes, bus

ducts, breakers, transformers, instruments, diesel equipment, housings for HVAC fans, louvers, and

dampers, HVAC ducts, vibration isolation elements for diesel equipment, and miscellaneous

electrical and mechanical equipment items o Miscellaneous electrical equipment and instrumentation enclosures including cable tray, conduit, wireway, tube tray, cabinets, panels, racks, equipment enclosures, junction boxes, breaker housings, transformer housings, lighting

fixtures, and metal bus enclosure assemblies o Miscellaneous mechanical equipment enclosures including housings for HVAC fans, louvers, and dampers o SBO Yard Structures and components including SBO cable vault and bus duct enclosures.

o Fire Protection System hydrant houses o Caulking, sealant and elastomer materials o Non-safety related masonry walls that support equipment relied upon to perform a function that demonstrates compliance with a regulated

event(s). The program will be enhanced to include additional inspection parameters.

Preliminary License Renewal Commitments Updated through 1/9/2009 Page 11 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number The program will require an inspection frequency of once every five (5) years fo r structures and structural components within the scope of the program. The

frequency of inspections can be adjusted, if necessary, to allow for early detection and timely correction of negative trends. The program will require periodic sampling of groundwater and river water c hemistries to ensure they remain non-aggressive.

31 A Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) Program will be impl emented. Program features will be as described in LRA Section B2.1.39.

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.39 32 The Water Chemistry Program will be enhanced as follows: The program will require increased sampling to be performed as needed to confi rm the effectiveness of corrective actions taken to address an abnormal chemistry condition. The program will require R eactor Coolant System dissolved oxygen Action Level limits to be consistent with the limits established in the EPRI PWR Primary Water Chemistry Guidelines." [Revised in letter dated 12/5/2008 in response to RAI B2.1.40-3]

U1 - 8/9/2013 U2 - 10/29/2014 B2.1.40 33 The Metal Fatigue of Reactor Coolant Pressure Boundary Program will be enhanced as follows:

The program will monitor t he six component locations identified in NUREG/CR-6260 for older vintage U1 - 8/9/2013 U2 - 10/29/2014 B3.2 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 12 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number Westinghouse plants, either by tracking the cumulative number of imposed stress cycles using cycle counting, or

by tracking the cumulative fatigue usage, including the

effects of coolant environmen

t. The following locations will be monitored:

o Reactor Vessel Inlet and Outlet Nozzles o Reactor Pressure Vessel Shell to Lower Head o RCS Hot Leg Surge Line Nozzle o RCS Cold Leg Charging Nozzle o RCS Cold Leg Safety Injection Accumulator Nozzle o RHR-to-Accumulator Piping Tee Program acceptance criteria will be clarified to require corrective action to be taken before a cumulative fatigue usage factor exceeds 1.0 or a design basis transient

cycle limit is exceeded.

[Revised in letter dated 1/9/2009 in response to RAI 4.3.1.1-1]

34 Reactor internals baffle bolt fatigue transient limits of 1835 cycles of plant loading at 5%

per minute and 1835 cycles of plant unloading at 5% per minut e will be incorporated into the Metal Fatigue of Reactor Coolant Pressure Boundary Program and USAR Table 4.1-8.

U1 - 8/9/2013 U2 - 10/29/2014 B3.2 Preliminary License Renewal Commitments Updated through 1/9/2009 Page 13 of 13 Commitment Number Commitment Implementation Schedule Related LRA Section Number 35 NSPM will perform an ASME Sect ion III fatigue evaluation of the lower head of the pressurize r to account for effects of insurge/outsurge transients.

The evaluation will determine the cumulative fatigue usage of limiting pressurizer component(s)

through the period of extended operation. The analyses will account for periods of both "W ater Solid" and "Standard Steam Bubble" operating strategies. Analysis results will be incorporated, as applicable, into the Metal Fatigue of Reactor

Coolant Pressure Bo undary Program.

[Revised in letter dated 1/9/2009 in response to RAI 4.3.1.1-1]

U1 - 8/9/2013 U2 - 10/29/2014 4.3.1.3 36 NSPM will complete fatigue calc ulations for the pressurizer surge line hot leg nozzle and the charging nozzle using the methodology of the ASME Code (Subsection NB) and will

report the revised CUFs and CUFs adjusted for environmental effects at these locations as an amendment to the PINGP LRA. Conforming changes to LR A Section 4.3.3, "PINGP EAF Results," will also be included in that amendment to reflect analysis results and remove references to stress-based

fatigue monitoring.

[Added in letter dated 1/9/2009 in response to RAI 4.3.1.1-1] April 30, 2009 4.3.3