Pilgrim, Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations.
ML092310144
Person / Time
Site: Pilgrim
Issue date: 08/12/2009
From: Lynch J R
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-09-011
Download: ML092310144 (3)


See also: RIS 2009-11

Text

'" Entergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 12, 2009 U. S. Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT: Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2009-11 "Preparation

and Scheduling

of Operator Licensing

Examinations" LETTER NUMBER: 2.09.046 Dear Sir or Madam: On July 16, 2009, the NRC issued Regulatory

Issue Summary (RIS) 2009-11, "Preparation

and Scheduling

of Operator Licensing

Examinations." This RIS requested

information

from licensees

regarding

proposed licensed operator examinations

schedules

and estimated

number of applicants

in order to assist the NRC in planning resources.

Accordingly, the requested

information

is provided in the enclosed NRC Form 536.There are no commitments

contained

in this letter.Please contact me at (508) 830-8403, if there are any questions

regarding

this subject.Sincerely, Joseph R. Lynch Manager, Licensing MJG/mg Enclosure:

Completed

NRC Form 536 cc: Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory

Commission

475 Allendale

Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station woos"M

Enclosure

to ENO Letter 2.09.046 Completed

NRC Form 536 (1 page)

NRC FORM 536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 10/31/2011

(10-2008)

Estimated

burden per response to comply with this voluntary

information

collection

request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information

collection

is used to plan budgets and resources

for operator examinations.

Send comments regarding

burden OPERATOR LICENSING

estimate to the Records and FOIA/Privacy

Services Branch (T-5 F53), U.S.Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information

EX(AMINATION

DATA and Regulatory

Affairs, NEOB-10202, (3150-0131), Office of Management

and Budget, Washington, DC 20503. If a means used to impose an information

collection

does not display a currently

valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRC REGION Entergy, Pilgrim Nuclear Power Station One A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED

NUMBER OF LICENSEE-PREPARED

0 1 0 1 EXAMINATIONS

ESTIMATED

NUMBER OF NRC-PREPARED

0 0 0 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY 10 CY 11 CY 12 Cy 13 NUMBER OF REACTOR 0 8 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 3 0 7 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011

01/21/2013

ALTERNATE

DATE 01/24/2011

01/28/2013

C. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE CY 09 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER

DECEMBER MARCH JUNE SEPTEMBER

DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 11 CANDIDATES

NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER