ML18142B923

From kanterella
Revision as of 17:17, 12 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2018/05/22 Vogtle COL Docs - Draft RAI Responses for LAR-17-037, Changes to Tier 2* Departure Evaluation Process
ML18142B923
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/22/2018
From:
NRC
To:
NRC/NRO/DNRL/LB4
References
Download: ML18142B923 (26)


Text

o o

ooo

AP1000 Component Interface Module Technical ReportThe manual actuation function of the diverse actuation system is implemented by hard-wiring the controls located in the main control room directly to the final loads in a way that completely bypasses the normal path through the protection and safety monitoring system cabinets, and the diverse actuation system automatic logic.

ncated in thted in s the normalhe normae diverse actuerse actAP1 APn of the din of themain merse actuatactuation s iocontrol room direntrol room dh through the proh through t n sys sytem automtem aut

any o

ooooGuidelines for Updating Final Safety Analysis ReportsSimplifying Updated FSAR InformationoFinal Safety Final SafAnalysis ReportAnalysis R ooooGuidelines for Updating Final Safety Analysis ReportsGuidelines For 10 CFR 50.59 Implementation Guidelines For 10 CFR 50.59 Implementation