ML080510693

From kanterella
Revision as of 20:45, 30 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
02/21/2008 Notice of Closed Meeting with Dominion Energy Kewaunee, Inc., to Discuss Regarding Dominion'S Plans to Transition the Wackenhut Security Workforce at Kewaunee to a Proprietary In-House Workforce
ML080510693
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/20/2008
From: Duncan E R
Plant Support Branch II
To:
Dominion Energy Kewaunee
References
Download: ML080510693 (2)


Text

NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS NOT OPEN TO PUBLIC ATTENDANCE

February 20, 2008 Name of Licensee: Dominion Energy Kewaunee, Inc.

Name of Facilities/Docket Nos: Kewaunee Power Station; 50-305 Date and Time of Meeting: Thursday, February 21, 2008 at 10:30 CST

Location of Meeting: U.S. NRC Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois, 60532

Purpose of Meeting: To discuss Dominion

=s plans to transition the Wackenhut security workforce at Kewaunee to a proprietary in-house workforce.

Category: This meeting will be closed to the public because the staff has determined that the information is security-sensitive in nature.

NRC Attendees: S. West, Director, DRS, Region III A. Boland, Deputy Di rector, DRS, Region III F. Peduzzi, Team Leader, NSIR

Licensee Attendees: E. Gilson, Manager of Protective Services, Kewaunee M. Nelson, Interim Director for Nuclear Protective Services and Emergency Preparedness, Dominion Energy

Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9757. The NRC provides reasonable

accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or

the transcript or other information from the meeting in another form at (e.g., Br aille, large print), please notify the NRC

=s meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by:

_______/RA/______________

Eric Duncan Chief Plant Support Branch Division of Reactor Safety

Notice of Significant Licensee Meeting

Distribution

J. Adams (JTA), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR R. Correia, Deputy Director for Security Oversight, NSIR F. Peduzzi, Team Leader, NSIR

C. Pederson (CDP1), Director, Division of R eactor Proj ects, RIII G. Shear (GLS), Deputy Director, Division of Reactor Proj ects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII E. Duncan (ERD), Branch Chief, Plant Support, Division of Reactor Safety, RIII M. Kunowski (MAK3), DRP Branch Chief, Kewaunee R. M. Lickus (RML2), Regional State Liaison Officer, RIII RIII Public Affairs (VTM, PSC1)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP