Browns Ferry Feb-Mar 05000259/2008301 Exam Draft Simulator Scenarios (Part 1 of 2)
ML081370192
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/08/2008
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
50-259/08-301 50-259/08-301
Download: ML081370192 (103)


See also: IR 05000259/2008301

Text

Draft Submittal(PinkPaper)

SIMULATOR SCENARIOS f-R..b0;0..5

h7Jt-j'dcrD8-eUJ/

Appendix D Scenario Outline FINAL Form ES-D-lFacility:BFNScenarioNumber:HLTS-3-1Op-TestNumber:HLT0610

Examiners:


Operators:

_Initial Conditions:Unit3has been operatingfor192days.

Unit2has been operatingfor56days.

Unit1has been operatingfor274days.3ED

Diesel Generator is taggedforwater jacket leakage repair.Day 2 oftheLCO.Expectedtobe returned to servicethisshift.

FuelleakersonU3are currently at RFI 60,000.Thunderstorms

are passing throughtheregion, but no watchesarein effectforthe immediatearea.The3CRFPwas

oscillating

approximating30RPMduringlastshift,butis

now working properly and being monitored.The3CRFPPumpis

operating in automatic in order to collectdataforthenext24hours.A

trouble shooting plan is being developed.

Turnover: Support scheduled maintenance

and testing activities.

Alternate Stator Cooling Water Pumpsper35A,Sect6.4

per scheduled OPA.Event DescriptionTheUSwill respondtoa HPCI Rupture Diaphragm pressure switch PS-73-20B failure.Thecrewwill

alternate Stator Cooling Water Pumpsusing 01-35A.Thecrewwill

respondtoa3BHPFW heater isolation using 3-AOI-6-1.Thecrewwill

reduce power to--91%usingarecircflow

reduction.Thecrewwillisolate

feedwatertothe3BFW heater string.Thecrewwillfurther

reduce power to<79%usingarecirc

flow reduction.

Event Malfunction

Event Number Number Type*1a mrfanO1b reset N-ATC N-BOP N-SRO 1b N/A TS-SRO 2 imffw05b 100 R-ATC 8:00 C-BOP R-SROThecrewwill

respondtoa total loss of feedwater and reactor scram.Thecrewwill

respondtoatrip ofthe3B Reactor FeedwaterPump(RFP)using 3-AOI-3-1 and 3-01-3.Thecrewwill

respondtoatrip ofthe3A FuelPoolCooling

pump using 3-AOI-78-1.

3 imfsw10a C-ATC C-SRO TS-SRO 4 imffw13b C-ATC C-BOP C-SRO 5 bat rfpactrip M All 6 bat M HLTS3-1 AllThecrewwill

respondtoaRCIC steamleakinto secondary containmentanda HPCI120VAC power failure.Thecrewwill

anticipate

Emergency Depressurization

or perform Emergency Depressurizationdueto secondary containment

high radiation.

  • (N)ormal,(R)eactivity,(I)nstrument,(C)omponent,(M)ajor

HLTS-3-1Revision0Page1of41 SIMULATOR EXERCISE GUIDE TITLE SLOWLOSSOFHP FEEDWATER HEATINGONB STRING,3AFPCPUMPTRIP,RFPTRIP,LOSSOFALL

FEEDWATER, UNISOLABLE

RCIC STEAMLINEBREAK, 2ORMORE AREARADLEVELSABOVEMAXSAFE.

o DATE P'ROGRAM January19,2008BFNHotLicense

Training...Date....(R'-,uiredforExam

Scenarios only)(0rationsTraining

Manager or Designee)-===(Operations

SuperintendentorDesignee)(RequiredforExamScenariosonly)

'\)/

Zy 0 65 rrate\d 7jf Date VALIDATION

BY: CONCURRED:

REVIEWED BY:PREPAREDBY:

HLTS-3-1Revision0

Page2of41 NUCLEAR TRAINING REVISION/USAGE

LOG REVISION I DESCRIPTION

I DATE I PAGES I REVIEWED NUMBER OF CHANGES AFFECTED BY 0 Initial 01/19/2008

All csf

I.II.III.PROGRAM: COURSE: TITLE:HLTS-3-1 Revision 0 Page3of41 BFN Licensed Operator Requalification

Training License Requalification

Training (Simulator

Exercise Guide)SLOWLOSSOFHP FEEDWATER HEATINGONB STRING, FPC PUMPTRIP,RFPTRIP,LOSSOFALL

FEEDWATER, UNISOLABLE

RCIC STEAMLINEBREAK,2OR MORE AREA RAD LEVELS ABOVE MAX SAFE.IV.LENGHT OF LESSON: 1%to2 hours V.Training Objectives

A.Terminal Objectives

1.Perform routine shift turnover, plant assessment

and routine shift operation in accordancewithBFN procedures.

2.Given uncertain or degrading conditions, the operating crewwilluse team skills to conduct proper diagnostics

and make conservative

operational

decisions to remove equipment/unit

from operation.(SOER 94-1)3.Given abnormal conditions, the operating crewwillplacetheunitina

stabilized

condition per normal, annunciator, abnormal, and emergency procedures.4.Usestep text procedural

compliance.

B.Enabling Objectives

1.The operating crew will alternate stator coolant pumps as directed by 3-01-35A section 6.4.2.The operating crew will recognize and respondtoahigh pressure heater string isolation as directed by 3-ARP-9-6A

and 3-AOI-6-1A.

3.The operating crew will recognize and respondtoa spurious FPC systemtripandwillplacethe3B

pumpI/Sin accordance

with 3-ARP-94win1and 3-AOI-78-1.

4.The operating crew will recognize and respondtoaRFP Trip with 3-AOI-3-1.

5.The operating crew will recognize and respondtoalossof feedwater event and RxSCRAM.6.The operating crew will recognize and respond to unisolable

RCIC steamlinebreak,2or

more area rad levels above max safe requiring Emergency Depressurization.

VI.References:HLTS-3-1Revision0Page4of41 The proceduresusedinthe simulator are controlled

copiesandareusedin

development

and performance

of simulator scenarios.

Scenarios are validatedpriortouse,andany

procedure differenceswillbe correctedusingthe procedurerevisionlevel

presentinthe simulator.

Any procedure differences

noted during presentationwillbe correctedinthe same manner.Assuch,itis

expectedthatthe referenceslistedinthissectionneedonly

contain the reference materialwhichisnot

availableinthe simulator.

A.SOER 94-01 B.SOER 96-01 VII.Training Materials:

A.Calculator (If required)B.Control Rod Insertion Sheet (If required)C.Stopwatch (If required)D.Hold Order/Caution tags (If required)E.Annunciator

window covers (If required)F.Steam tables (If required)

VIII.Console Operator Instructions

A.Scenario File Summary 1.File:batHLTS3-1

MF/RF/IOR#

a)ior zlofcv712[2]

on b)ior zlofcv713[2]

on c)ior zlohs712a[2]

on d)ior zlohs713a[2]

on e)ior ypovfcv712

fail_now f)iorypovfcv713fail_now

g)imfrm10h(e1:25)30

h)imfrm10j(e1:25)25

i)imfrm10p(e12:00)50

j)imfDG01D k)imf DG02D I)ior zI03hS2113ed10a[1]

OFF m)mrfDG01Dopen n)imfrp08a 0)imfrp08b p)imfrp14b q)ior zdihs47130b

null 2.File:batHLTS3-1-1

MF/RF/IOR#

a)mmfrm10p10006:00

b)mmfrm10h100013:00

c)mmfrm10j100014:00

d)imfrc091007:00

e)imfad01b0 f)imf ad01f 0 g)Imf ad03b h)Imf ad03f 3.File:bat HLTS3-1-2 MF/RF/IOR#

i)imffw08b 30 j)imffw13b(none,:10)HLTS-3-1Revision0Page5of41 DescriptionFails71-2and71-3open

HCU-East rad30 mr/hr HCU-West rad25 mr/hr CS/RCICarearad 50mr/hr D DIGFailsto Start D DIG Trip Protective

Relay Operation1836GreenLight

OffOpenslogic

breakerAutoscramfailureAutoscramfailureBypassvalvefailure

BPV jack null DescriptionRCICradtomaxin6mins.

HCU-WesttoMaxin13mins.HCU-EasttoMaxin14mins.RCICsteamleak

MSRV1-19failsclosed

MSRV1-34failsclosed

MSRV 1-19 Stuck Closed MSRV 1-34 Stuck Closed DescriptionRFP3B Discharge Check Valve Sticks3BRFPTtripson

Thrust Brng Wear

HLTS-3-1Revision0Page6of41IX.Console

Operator Instructions

8.ConsoleOperatorsManipulationsELAPTIME PFK DESCRIPTION/ACTIONSim.Setuprst28 1000/0powerMOCSim.Setup restoreprefEstablishesPreferenceKeys

HLTS3-1Sim.SetupsetupVerifyPreferenceKeysSim.Setup escClearsPopup

WindowSim.Setup F3trge1 MODESWAssignstriggerSim.Setup F4batHLTS3-1seefile

summarySim.Setup manualTagDD/GwithHoldnotices

ROLE PLAY:*(After Stator coolant pumps alternated)AsAUO, report 3-FIS-035-0065

reading 610 gpm.*3-PI-035-0064

is reading 47 psig.*3-HS-035-0040

selected for"A-RES" Stator Coolant pump on panel 25-114.WhenrequestedtoresetlocalStator

Coolantpanelalarmthen:

F5mrfan01bresetAllowsresettingMCRalarm

ROLE PLAY:Asan 1M report that HPCI rupture diaphragm pressure switch PS-73-20B has failed low.WhendirectedfromtheFloorthen:

F6imffw05b1008:00

'8'HPheaterstringisolation

ROLE PLAY: If sent to investigate

which valve is open, wait 2 minutes and report 3-LCV-22B light is out (B2 high level dump)ROLE PLAY: At79%power, as the Reactor Engineer, recommend inserting the first group of Emergency Insert Control Rods.IfaskedtoresetlocalCondDemin

alarmF7mrfan01dresetallowsresetofcontrolroomalarm

After conditionsstabilizedorasdirectedbyFloorInstr.

F8imfsw10aTrips3AFPCpump

ROLE PLAY: (If asked)AsAUO, report3-78-506,511,&

crosstie507are open&3-78-510(Bhx

outlet)is closed ROLE PLAY: (If asked)AsRWUO, 3-FRC-78-24isin manual&set to 0%Ifaskedtothrottle

3-FCV-78-66Ifaskedtoclose

3-FCV-78-66

F9 F10iorzlohs7866a[2]ondorzlohs7866a[2]

ROLE PLAY: (If asked)As Rx Bldg AUO, report 3B pump discharge pressureis140 psig(PI-78-16on

25-16)

HLTS-3-1Revision0

Page7of41ROLEPLAY:If

sent to inspect breakeron3AFPC pump, report bkr was found tripped and will not test AfterFPCrestoredandasdirectedbyFloorInstr.F11batHLTS3-1-2Trips38RFPonthrustbrngwearwithcheckvalvefailureat

30%*ROLEPLAY:If

sent to check 38 RFP report that thereisno apparent cause but you will continue to check NOTE: Mark the time whenRPVlevel reaches+2 inches to ensure Critical Task completion

of inserting a manual scram within 60 seconds of reaching+2 inches.WhendirectedbyLeadExaminer

If doesn'tstartonlowlevel

AfterHPCIisinmanualcontrolandinjectingupto-50"ordirectedbyLead

Examiner then:F12imffw13a<shift>F1imfrc02<shift>F2imfhp07Trips3ARFPonthrustbrngwearStartofRCICHPCI120Vfailure

After10minutesofRCICoperationsordirectedbyLead

Examiner then:<shift>F4batHLTS3-1-1Max.Rad(2areasin13mins.)ROLEPLAY:If

directed to close RCIC valves 71-2&3 locally, respond thatyouare waitingonRadCon to enter the Reactor building.Ifdecidedtoattempttoclosevalves

locally:mrfrc05kemer71-2toemergmrfrc05semer71-3toemergToreturntransferswitchtonormalmrfrc05knormmrfrc05snorm71-2tonorm71-3tonorm

TerminatesthescenariowhenthefollowingconditionsaresatisfiedoruponrequestoftheLeadExaminer:1.Allrodsarefullyinserted.2.Reactorwaterlevelisinthenormalband.3.EmergencyDepressurizationhasbeencompleted.

HLTS-3-1Revision0Page8of41 X.Scenario SummaryWiththeunitoperatingat100%,thecrewwillalternateStatorCooling

WaterPumpsper35A.Thentheoperatingcrewwill

experienceaslowlossofFWHTRlevelcontrolonthe8high

pressure heaterstring.Oncetheheaterisisolatedandpowerreduced,atripof3AFPCpumpwillrequirethe

operatortostart38FPCpumpper3-01-78.Whenplantconditionsarestablethe38

Reactor FeedwaterPumpwilltrip,thecrewwillrespondper3-AOI-3-1.Afterconditionsstabilize, The crewwillexperiencealossoftheremainingRFPswhichwillrequirethecrewtoscramandutilizeRCICforlevelcontrol.ThereactorwillNOTscramautomatically.WhenRCICisinitiatedit

developsasteamleakwhichcannotbeisolatedforcingthecrewto

emergency depressurizebasedon2AreaRadMonitorsabove

maximumsafe.IfHPCIisusedforwaterlevelcontrolthecrewwill experienceaproblemwiththeflow

controllertorespondinautomatic.Eventually,HPCI

will experienceafailureofthe120VACpowersupplyandHPCIwillnolongerfunction.

x.A.B.HLTS-3-1Revision0

Page9of41 InformationtoFloor Instructors:

Ensure recordersareinkingandrecordingandICSisactiveandupdating.

Assign Crew Positionsbasedontherequiredrotation.

1.2.3.SRO: ATC: BOP: Unit SupervisorBoardUnit OperatorDeskUnit Operator C.Terminate the scenariowhenthefollowing

conditions

are satisfiedoratthe directionofthe Lead Examiner:1.Allrodsfullyinserted

2.Reactor Waterlevelnormal

3.Emergency Depressurizeon2areaRADSabovemaxsafevalue

HLTS-3-1 Revision 0Page10of41

(XI.Simulator Event Gu ide Event 1a:NORMALOPERATIONS

POSITION ATC/BOP ATC/BOPEXPECTEDACTIONS e Stator Coolin Pum slAW3-OI-35Asect.6.4[1]STARTthe

Standby Stator Cooling WaterPumpA(B)by

placingGENSTATORCLGWATERPUMP3A(B),3-HS-35-35A(36A)onPanel

9-8 to START.[2]STOPthe

Stator Cooling WaterPumpB(A)by

placing GENSTATORCLGWATERPUMP3B(A),3-HS-35-36A(35A)onPanel3

-9-8 to STOP.[3]VERIFY the STATOR COOLING WATERGENIN LET FLOW , 3035-0065 , indicates Min.595toMax.732gpmonPanel25-114.

[4]VERIFY the STATOR COOLING WATERGENINLETPRESS, 035-0064,indicates42(22ps

igand20psighead)to52psigonPanel25114.[5]VERIFYthepumpcontrolswitchforthe

stator cooling water pump stopped inStep[2]above

, (3A),isreturnedtoAUTOonPanel3

-9-8.[6]SELECTSTATORCOOLINGWATERPUMPSSEL,3-HS-035-0040(A-RES-CO-B-RES)onPanel25-114

to theoperating pump.Identifythe

improper lens configurat

ion on Stator Cooling Water pumps andswapthelensesor

informstheSRO.

HLTS-3-1Revision0

Page11of41

XI.SimulatorEventGuide

Event 1b:HPCIPRESSURESWITCHFAILURE

(POSITION ATC/BOP SRO SROEXPECTEDACTIONSRespondstoReportbyIMsofHPCIrupture

diaphragmpressureswitchfailurePS-73-20B),byrelayinginformationtoSRO.

ConsultsTechSpec3.3.6.1

Function3cand determines

only three pressure switches are required.Determines

an INFORMATIONONLYLCOmustbewrittenforHPCIpressureswitch3-PS-73-20B.

HLTS-3-1 Revision aPage12of41

(XI.SimulatorEventGuide

Event 2:SLOWLOSSOFHPFEEDWATERHEATINGON"B" STRING POSITION ATC/BOPEXPECTEDACTIONS

Announces"BYPASSVALVETOCONDENSERNOTCLOSED"andrefersto

3-ARP-9-6A, win 18.(ATC/BOPA.CHECK

heater high or low level or moisture separator high or low level alarm window illuminatedonPanel3-9-6

or 3-9-7 to identify which bypass valve is opening.B.DISPATCH

personnel to check which valve's light is extinguished

on junction box34-21,ColT-13J-LINE, elevation 565'.SRO Direct an Upper Power Runback due to RFP speed above5050rpm.ATC Initiates an Upper Power Runback ofRecircPumps.

ATC/BOP Announces"HEATERB2LEVELHIGH"andrefers

to 3-ARP-9-6A, win 9.VERIFYAutomaticaction-Drainvalvetocondenser3-LCV-6-22Bopens

.A.CHECKthefollowing

indications:*Condensateflowrecorder2-29,Panel3-9-6

.Risingflowisapossibleindicationofatubeleak

.*HeaterB2shellpressure,3-PI-5-22anddraincoolerB5flow

, 3-FI-6-34,Panel3-9-6

.Highorrisingshellpressureordraincoolerflowispossibleindicationofatubeleak

.

HLTS-3-1 Rev ision 0Page13of41

XI.Simulator Event Guide (Event 2:SLOWLOSSOFHPFEEDWATERHEATINGON"B" STRINGTIMEPOSITIONEXPECTEDACTIONSATC/BOPB.CHECK

drainvalve3-FCV-6-95open.C.CHECKlevelonICS

screen,FEEDWATERHEATER

LEVEL(FWHL).*IFthe3B2 heater indicatesHIGH(Yellow),THENVERIFY

proper operation oftheDrainandDumpvalves.*DISPATCH personnel to local PaneI3-LPNL-925-562CtoVERIFYandMANUALLY

controlthelevel.D.IFa validHIGHHIGHlevelis

received, THENGOTO3-AOI-6-1Aor3-AOI-6-1C

.ATC/BOP AnnouncesB1andB2HPhtr.

Extraction

isolation SROIRECTSCrewto

enter 3-AOI-6-1 Contacts Reactor Engineer (

HLTS-3-1Revision0

Page14of41XI.SimulatorEventGuide

(Event 2:SLOWLOSSOFHPFEEDWATERHEATINGON

"8" STRINGTIMEPOSITIONEXPECTEDACTIONS

ATC/BOPPerformsimmed

iate actions;REDUCECoreThermalPowertoe5%belowinitialpowerleveltomaintainthermalmargin.

ATC/BOP Performs subsequent

actions1REFERTO3-01-6

for turbine/heater

load restrictions

.[2]REQUEST

Reactor EngineerEVALUATEandADJUST

thermal limits, as required.[3]ADJUST reactor power and flow as directed by Reactor Engineer/Unit

Supervisortostay within required thermal and feedwater temperature

limits.REFERTO3-GOI-100-12

or3-GOI-100-12A

for the power reduction.

SRO Directs isolatingFWto8HP heater string Directs power reduction to<79%power (Mid-powerrunback)per

3-01-6, 1111HEATERSOUT(TubeandShell

Side)**OneHP string920MWe(79%)

nters3-GOI-100-12Power

Maneuvering

NotifiesRxEng.AndODS

of Feedwater Heater isolation and power reduction (

HLTS-3-1 Revision 0Page15of41XI.SimulatorEventGuide

Event 2:SLOWLOSSOFHPFEEDWATERHEATINGON"B" STRING (TIMEPOSITIONEXPECTEDACTIONS

ATC/BOP Closes the following FW valves (Attachment

1)3-FCV-3-31,HPHTR3B2FWINLETISOLVALVE3-FCV-3-76,HPHTR3B1FW

OUTLETISOLVALVE Performs a mid-power runback-79%ATC/BOP[4]ISOLATE

heater drain flow from the feedwater heater string that isolated by closing the appropriateFEEDWATERHEATERA-2(B-2)

or(C-2)DRAINTOHTR

A-3(B-3)or(C-3),3-FCV-6-94(95)

or (96).(Closes 3-FCV-6-95)[5]VERIFYautomaticact

ionsoccur.REFERTOAttachment1.VERIFYautomaticactionsTheHighPressureHeaterExtractionIsolationValvesandMoistureSeparatorLevelControlIsolationvalvesclose.

3-FCV-5-9 ,HPHEATER3B1EXTRISOLVLV3-FCV-5-21,HPHEATER3B2EXTRISOLVLV

3-FCV-6-74

,MOISTURESEPLCRESB1ISOLVLV

3-FCV-6-172

,MOISTURESEPLCRES

B21S0L VLV

HLTS-3-1Revision0

Page 16 of 41 (XI.SimulatorEventGuide

Event 2:SLOWLOSSOFHPFEEDWATERHEATINGON"B" STRINGPOSITIONEXPECTEDACTIONS

(Crew[6]MONITORTURBTHRUSTBEARINGTEMPERATURE, 3-TR-47-23, forrisesinmetal

temperature

and possible active/passive

plate reversal.[7]DETERMINEcause

which required heater isolationandPERFORM

necessary corrective

action.i.e.RecognizesHTRlevel lowersasa result of isolating the Condensate

side of3BHPHTR string (i.e.tube leak)SRO DirectATCto insert the first group of controlrodsonthe Emergency ShoveSheetper ReactorEngineerrecommendation

.A TC Insert the first group ofrodsonthe EmergencyShoveSheet

usingapeer check as directed by Rx Engineer&Unit Supervisor

HLTS-3-1 Revis ion 0Page17of41XI.SimulatorEventGuideEvent3:Tripof3AFPCpumpTIMEPOSITIONEXPECTEDACTIONS

Crew Recognizes3AFPCpump trip, respondspertheARPATC/BOPResetsMOTORTRIPOUT3-ARP-9-8C(W33)ATC/BOPPerformsthe

following: RespondstoalarmFPC

system abnormal3-ARP-9-4C(W1)A.DISPATCH

personneltoPanels25-15and25-16to

determine the cause ofthealarm.H.IFFuelPoolCoolingSystemfailurehasoccurred,THENREFERTO 3-AOI-78-1.

Enters 3-AOI-78-1

to start the standbImmediateActions-NoneSubsequentactions

4.2[3]IFfuelpoolcoolingsystemfailureisfromlossofcooling,THEN:(OtherwiseN/A)PERFORMthe

following:[3.1]STARTidleFUELPOOLCOOLINGPUMP3B(3A).

HLTS-3-1Revision0Page18of41

(XI.SimulatorEventGu

ideEvent3: Tr ipof3AFPCpumpPOSITIONEXPECTEDACTIONS

Coordinates

with Rx BldgAUOand Radwaste UO to start3BFPC pump Ver ifies d ischargepressure>120psigw

ith AUO DirectsRWUOandRx Bldg AUO to place demin in service SRO/BOP DispatchAUO/EMsto check breaker for3AFPC pump SRO Directs restoration

of system aftercauseis determined

SRO valuate Tech.Sec.TRM 3.9.213.9.3

SRO DetermineTRM3.9.2 Action (A)applies to maintain FP temperature

below 150°F.

HLTS-3-1Revision0Page19of41XI.SimulatorEventGuide

(Event4:3BRFPTTripTIMEPOSITIONEXPECTEDACTIONS

ATC/BOP Announces"RFPT" Abnormal" alarm" and trip ofRFPT'B'.ATC/BOPRecognizethatRFPT"B"speedstillindicates

-4000rpmafterthetrip.ATC/BOPRecognizethatRFPT"A"and"C"arerunningattheupperspeedlimiter

.ATC/BOP Diagnose the possibility

that the discharge check valveonRFPT"B" has not SRO closed.

HLTS-3-1 Revision 0 Page 20of41XI.SimulatorEventGuide

(Event4:3BRFPTTripTIMEPOSITIONEXPECTEDACTIONSATC/BOPReferstoARP9-6Candtake required action A.VERIFYreactorpoweriswithinthecapacityofoperatingRFPs.B.CHECKcore

limits.C.WHENRFPTcoastsdowntozerospeed,unlessRFPTisrollingonminimumflow,THENVERIFYturninggearmotorstartsandengages

.D.EFERTO3-AOI-3-1

or 3-01-3 , Section 8.1.

HLTS-3-1Revision0Page21of41XI.SimulatorEventGuide

(Event4:3BRFPTTripTIMEPOSITIONEXPECTEDACTIONS

(ATC/BOP nters 3-AOI-3-1[1]VERIFYapplicableautomaticactions

.C.RecircPumpsreceiverunbacksignalto75%speedat27"(normalrange)ifthedischargeflowofaRFPislessthan889,000Ib/hr19%(ratedflow)

.[2]IFlevelOR

Feedwater flow is loweringdueto loss of Condensate, Condensate

Booster, or FeedwaterPump(s),THENREDUCERecirc

flow as required to avoid scram on low level.

HLTS-3-1Revision0

Page 22of41XI.SimulatorEventGuide

(Event4:3BRFPTTripTIMEPOSITIONEXPECTEDACTIONS

[9]IFRFPsareinautomaticcontrol,THEN

VERIFY 3-L1C-46-5raisesflowofoperatingRFPs.[12]IFaRFPThas

trippedandisNOTre

uired to maintain level, THEN SECURE trippedRFPT.EFERTO

3-01-3[14]IF unit remains on-line, THEN RETURN Reactor waterlevelto normal operating level of 33" (normal range).SRO Dispatches

AUO to RFP to determine cause of tripATC/BOPVerifiesthatunitstableVerifiesRxThermallimits

SRO Contacts maintenance

to check reason for RFPT tripNOTE:LEADEXAMINER

notify Console Instructor

when ready to trip the nextRFP(i.e.next event)

(XI.SimulatorEventGuideEvent5: POSITION ATC/BOP ATC/BOP HLTS-3-1 Revision aPage23of413Aand3CRFPTrip

EXPECTED ACTION Recognizes3ARFP tripandneed for reactor scram scram failure (If not manually scrammed prior)SRO DirectsReactorscram (Critical Task)ATC anuall scrams the reactor and gerforms 3-AOI-100-1

actions-mode switch in SID-checks power lowering-reportsallrodsin-recognizes

trip of3CRFPand informsSROallRFP'sare

trippedBOPTripTurbine/verifyisolations

SRO Enters 3-EOI-1 on low reactor water leve Directslevelbe controlled

by:-RCIC-CRD-HPCI-Enter AOI-100-1

XI.SimulatorEventGuide

C" EventS: TIME POSITION ATC/BOP3Aand3CRFPTrip

EXPECTED ACTION Utilizes RCIC for reactor water level control HLTS-3-1Revision0

Page24of411.IF.....BOTHofthefollowingexist:RPVPressureisatorbelow50psig,ANDBypassofRCIClowRPVpressureisolation

interlocksisnecessary,THEN

...EXECUTE EOI Appendix 16A concurrentlywiththis procedure.2.IF.....BOTHofthefollowingexist:

High temperatureexistsintheRCICarea,AND

SRO directsbypassofRCICHigh

temperatureIsolationinterlocks,THEN

...PERFORMthefollowing:

a.EXECUTE EOI Appendix 16K concurrentlywiththisprocedure.b.RESETautoisolationlogicusingRCIC

AUTO*ISOLLOGICA(B)RESET

3-XS-71-S1A(B)

pushbuttons

.

XI.SimulatorEventGuide

(Event5:TIMEPOSITION3Aand3CRFPTripEXPECTEDACTION

HLTS-3-1Revision0Page25of41BOP3.VERIFYRESETandOPEN3-FCV-71-9,RCICTURB

TRIPITHROT

VALVE RESET.4.VERIFY3-FIC-71-36A,RCICSYSTEM

FLOW/CONTROL

,controllerinAUTOwithsetpointat600gpm

.5.OPEN the following valves:3-FCV-71-39,RCICPUMP

INJECTION VALVE3-FCV-71-34,RCICPUMPMIN

FLOW VALVE3-FCV-71-25,RCICLUBEOILCOOLINGWTRVLV.6.PLACE3-HS-71-31A,RCICVACUUMPUMP, handswitchinSTART.7.OPEN3-FCV-71-8,RCIC

TURBINE STEAM SUPPLY VLV, to start RCIC Turbine.(

X I.SimulatorEventGu ide (Event5:TIMEPOSIT ION3Aand3CRFPTripEXPECTEDACTION

HLTS-3-1 Rev ision 0Page26of418.CHECKproperRCICoperationbyobserv

ingthefollowing

a.RCICTurbinespeed

acceleratesabove2100rpm.

b.RCICflowtoRPVstabilizesandiscontrolled

automaticallyat600gpm.c.3-FCV-71-40,RCIC

TestableCheckVlv,opensbyobserving3-ZI

-71-40A,DISCPOSITION

,redlightilluminated.

d.3-FCV-71-34,RCICPUMPMINFLOWVALVE,closesasflowrisesabove120gpm.SRO nters3-EOI-3on Rx Bid Hi Rad

(XI.SimulatorEventGuideEvent6: RCIC STEAM LEAK/LOSSOFHPCI HLTS-3-1 Revision 0Page27of 41TIMEPOSITION

EXPECTED ACTIONSATC/BOPIfHPCIisused, recognizes

auto control failureandplacesHPCI

controllerinmanual ATC/BOP Recognizes

and reports high area temperature

forRCICroom Recognizes

RCIC failure to isolate and attempts to manually isolate it SRO DirectsRCICbe isolated locally Crew Monitors area radiation levels SRO Determines

has two area radiationlevelsabovemaxsafelAW

3-EOI-3 and directs emergency depressurization

by opening6ADS valves (C2)(Critical Task)EXAMINERNOTE:Ofthe6ADSvalves,2willfailtoopenandthe

candidatewillhavetoopen

additionalvalves(anytwo)untilsixareopen.

ATC/BOPOpens6ADS

2 valvesfailedtoopenandopens2

additional

valvesVerifiesRFPdischargevalvesclosedbefore

uncontrolledinjectiononloweringRxpressure

HLTS-3-1Revision0Page28of41

XI.SimulatorEventGuide

(Event6:RCICSTEAMLEAK/LOSSOFHPCITIMEPOSITIONEXPECTEDACTIONS

SRO Directs RPV level be maintained

between+2" and+51" with one or more of the following: (After emergency depressurization.)(Critical Task)-LPCI-Core Spray-CondensateATC/BOPAfteremergencydepressurizationmaintainsRPVwaterlevelTAFandrestoreslevel+2"to+51"withoneormoreofthefollowing: (Critical Task)-LPCI-CoreSpray-Condensate

ARR 6A Condensate1.VERIFYCLOSEDthefollowingFeedwaterheaterreturn

valves: 3-FCV-3-71,HPHTR3A1LONGCYCLETOCNDR3-FCV-3-72,HPHTR3B1LONGCYCLETOCNDR3-FCV-3-73,HPHTR3C1LONGCYCLETOCNDR.

(

(XI.SimulatorEventGuideEvent6:RCICSTEAMLEAK/LOSSOFHPCIHLTS-3-1Revision0Page29of41

POSITION EXPECTED ACTIONS (ATC/BOP 2.VERIFYCLOSEDthefollowingRFP

discharge valves: 3-FCV-3-19,RFP3A DISCHARGE VALVE 3-FCV-3-12,RFP3B DISCHARGE VALVE 3-FCV-3-5,RFP3C DISCHARGE VALVE.3.VERIFYOPENthefollowingdrain

coolerinletvalves:

3-FCV-2-72, DRAIN COOLER3A5CNDSINLETISOLVLV

3-FCV-2-84, DRAIN COOLER3B5CNDSINLETISOLVLV

3-FCV-2-96

, DRAIN COOLER3C5CNDSINLETISOLVLV

4.VERIFYOPENthefollowingheateroutletvalves:

3-FCV-2-124

,LPHEATER3A3CNDS

OUTLISOLVLV 3-FCV-2-125, LP HEATER3B3CNDSOUTLISOLVLV

3-FCV-2-126, LP HEATER3C3CNDS OUTL(SOLVLV.

XI.SimulatorEventGuide

(Event5: POSITION ATC/BOP HLTS-3-1Revision0

Page30of41RCICSTEAM LEAK/LOSSOFHPCI EXPECTED ACTIONS 5.VERIFYOPENthefollowing

heaterisolationvalves

3-FCV-3-38,HPHTR3A2FWINLETISOLVLV

3-FCV-3-31

,HPHTR3B2FWINLETISOLVLV3-FCV-3-24,HPHTR3C2FWINLETISOLVLV

3-FCV-3-75,HPHTR3A1FW

OUTLETISOLVLV3-FCV-3-75,HPHTR3B1FW

OUTLETISOLVLV 3-FCV-3-77

,HPHTR3C1 FW OUTLETISOLVLV 5.VERIFYOPENthefollowingRFPsuctionvalves:

3-FCV-2-83,RFP3A SUCTION VALVE 3-FCV-2-95

,RFP3B SUCTION VALVE 3-FCV-2-108,RFP3C SUCTION VALVE.7.VERIFYatleastone

condensatepumprunning.

8.VERIFYatleastone

condensate

boosterpumprunning.

9.ADJUST3-L1C-3-53,RFW

START-UP LEVEL CONTROL, to control injection (Panel 3-9-5).10.VERIFYRFWflowtoRPV

.

HLTS-3-1 Rev ision 0Page31of41

X I.SimulatorEventGu ide (Event6:RCICSTEAMLEAK/LOSSOFHPCITIMEPOSITIONEXPECTED

ACTIONS ATC/BOP..........1.VERIFYOPENthefollowingvalves

3-FCV-75-2

,CORESPRAYPUMP3ASUPPRPOOLSUCTVLV

3-FCV-75-11,CORESPRAYPUMP3CSUPPRPOOLSUCTVLV

3-FCV-75-23,CORESPRAYSYSIOUTBDINJECTVALVE.

2.VERIFYCLOSED3-FCV-75-22,CORESPRAYSYSI

TEST VALVE.3.VERIFYCSPump3Aand/or3CRUNNING.4.WHEN...RPV

pressure is below 450 psig,THEN...THROTTLE75-25 , CORE SPRAY SYS IINBD INJECT VALVE, as necessary to control injection at or below 4000 gpm per pump.5.MONITORCoreSprayPumpNPSHusing

Attachment

1.

HLTS-3-1 Revision 0Page32of41

XI.SimulatorEventGuide

(Event6:RCICSTEAMLEAK/LOSSOFHPCITIMEPOSITION

EXPECTED ACTIONS ATC/BOP1.IF*.*.*Adequate core cooling is assuredANDIt becomes necessary to bypass LPCllnjection

Valve Timers to control injection,THEN

..*EXECUTE EOI Appendix 16F concurrently

with this procedure.2.VERIFYOPEN3-FCV-74-1,RHRPUMP3ASUPPRPOOLSUCTVLV.

3.VERIFYOPEN3-FCV-74-12,RHRPUMP3CSUPPRPOOLSUCTVLV

.4.VERIFYCLOSEDthefollowingvalves

3-FCV-74-61,RHRSYSIDWSPRAYINBDVLV

3-FCV-74-60

,RHRSYSIDWSPRAYOUTBDVLV

3-FCV-74-57

,RHRSYSISUPPR

CHBR/POOLISOLVLV 3-FCV-74-58,RHRSYSISUPPRCHBRSPRAYVALVE

3-FCV-74-59

,RHRSYSISUP

PR POOL CLGITEST VLV.5.VERIFYRHRPump3Aand

/or3Crunning.6.WHEN...RPV

pressure i s below 450 psig,THEN.*.VERIFYOPEN FCV-74-53,RHRSYSI LPCIINBD INJECT VALVE.7.IF.....RPVpressureisbelow230psig

, THEN...VERIFYCLOSED 68-79 ,RECIRCPUMP3B

DISCHARGE VALVE.

HLTS-3-1Revision0

Page33of41XI.SimulatorEventGuide

(Event6:RCICSTEAMLEAK/LOSSOFHPCITIMEPOSITIONEXPECTEDACTIONSATC/BOP8.THROTTLE3-FCV-74-52,RHRSYSILPCIOUTBDINJECTVALVE,as

necessary to control injection.9.MONITORRHR

Pump NPSH using Attachment

1.10.PLACERHRSW

pumps in service as soon as possibleonANYRHR Heat Exchangers

discharging

totheRPV.11.THROTTLEthe

following in-service

RHRSW outlet valves to maintain flow between1350and4500

gpm:3-FCV-23-34,RHRHX3ARHRSWOUTLETVLV3-FCV-23-40,RHRHX3CRHRSWOUTLETVLV.12.NOTIFY Chemistry thatRHRSWis aligned to in-serviceRHRheat exchangers.

(

HLTS-3-1Revision0

Page34of41XI.SimulatorEventGuide

(Event6:RCICSTEAM LEAK/LOSSOFHPCITIMEPOSITIONEXPECTEDACTIONSSROAfter-EOI-2enteredonhihSP

water level or tem erature directs the following:-H 2 0 2 analyzersplacedin serviceATC/BOPPlacesH

2 0 2 analyzers in service SRO Directs all available Suppression

Pool coolingbeplaced into service due to Suppression

Pool water temperature

ATC/BOP1.IF..*..Adequate core cooling is assured,THEN...BYPASSLPCI

Injection Valve Timers as necessary using EOI Appendices16Fand16G.

Calls forApp16F&G2.PLACERHRSYSTEM

1(11)in Suppression

Pool Cooling as follows:a.VERIFYatleastoneRHRSWpumpsupplyingeachEECWheader

.

XI.SimulatorEventGuide

(Event6: POSITION HLTS-3-1Revision0

Page35of41RCICSTEAMLEAK/LOSSOFHPCIEXPECTEDACTIONSATC/BOPb.VERIFYRHRSWpumpsupplyingdesiredRHRHeatExchanger(s)

.c.THROTTLE the following in-service

RHRSW outlet valves to obtain between1350and4500

gpm RHRSW flow:3-FCV-23-34,RHRHX3ARHRSW

OUTLET VLV3-FCV-23-46,RHRHX

38 RHRSW OUTLET VLV3-FCV-23-40,RHRHX3CRHRSW

OUTLET VLV3-FCV-23-52,RHRHX3DRHRSWOUTLETVLV.d.IF.....DirectedbySRO,THEN...PLACEthe

following key lock switches in MANUAL OVERRIDE:3-XS-74-122,RHRSYSI

LPCI2/3COREHEIGHTOVRD.3-XS-74-130,RHRSYSII

LPCI2/3COREHEIGHTOVRD.

e.IF.....LPCIINITIATION

Signal exists,THEN...MOMENTARILY

PLACE the following in select:3-XS-74-121,RHRSYSICTMT

SPRAY/CLGVLVSELECT.3-XS-74-129,RHRSYSIICTMTSPRAY/CLGVLVSELECT.

HLTS-3-1Revision0

Page36of41

XI.SimulatorEventGuide

(Event6:RCICSTEAMLEAK/LOSSOFHPCITIMEPOSITIONEXPECTEDACTIONSATC/BOPf.IF

.....3-FCV-74-53(67),RHRSYSI(II}

LPCIINBDINJECTVALVE,is

OPEN ,THEN...VERIFYCLOSED3-FCV-74-52(66},RHRSYSI(II}LPCIOUTBDINJECTVALVE.g.OPEN 3-FCV-74-57(71),RHRSYS 1(11)SUPPRCHBRJPOOLISOLVLV.h.VERIFYdesiredRHRpump(s}forSuppressionPoolCoolingareoperating

.i.THROTTLE 3-FCV-74-59(73),RHRSYS 1(11)SUPPRPOOL CLGITEST VLV, to maintain EITHER of the following as indicatedon3-FI-74-50(64),RHRSYS 1(11)FLOW: Between7,000and10,000

gpm for one-pump operation.

OR At or below 13,000 gpm for two-pump operation.

(

HLTS-3-1Revision0

Page37of41

XI.Simulator Event Guide (Event6:RCICSTEAM LEAK/LOSSOFHPCI TIME POSITION EXPECTED ACTIONS ATC/BOP j.VERIFY CLOSED 3-FCV-74-7(30),RHRSYSTEM 1(11)MIN FLOW VALVE (VERIFY CLOSED 3-BKR-074-0007(0030)

on 480V RMOVBoard3D(3E)

, Compartment

4E(4E), if required).

k.MONITOR RHR Pump NPSH using Attachment

1.I.NOTIFY Chemistry that RHRSW is aligned to in-service

RHR Heat Exchangers.m.IF.....Additional

Suppression

Pool Cooling flow is necessary,THEN...PLACE additional

RHR and RHRSW pumps in service using Steps 2.b through 2.1.Terminate scenario when emergency depressurization

has occurredandRx waterlevelis under control.(

(XII.1.2.3.Crew Critical Tasks(Ifanevaluatedscenario)

Maintains reactor waterlevelaboveTAF

Emergency depressurizebasedon2areas

radiation above maximum safe with a primary system discharging

to secondary containment (within 5 minutes)Recognize auto scram failure withinoneminute.(If

not manually scrammed)HLTS-3-1Revision0

Page38of41

SAT/UNSAT

(XIII.Scenario Verification

Data EVENT 1.LossofHP Feedwater Heating2.3AFPCpumptrip

TASK#U-068-NO-10

U-006-AB-01

S-006-AB-01

T-000-AD-17

295014 HLTS-3-1Revision0Page39of41ROSR CONTROL MANIPULATION

o 3.7 3.9 B17 (3.RFPsTrip295001A2.013.73

.7 B3 U-003-AB-01

S-003-AB-01

U-003-NO-08

295001A4.023.93.7 295009G12 3.8 4.4 T-000-AD-17

4.HPCI PressureSwitchFailure

U-073-AL-19

206000A2.09 3.53.7B5 S-000-AD-27

2.1.12 2.9 4.05.RCIC LeaklMSL Leak U-000-EM-102950333.63

.9 A7,B14,A12, U-000-EM-11

B15,14,120

S-000-EM-10

295032 3.5 3.6 S-000-EM-12

U-000-EM-013.84.4 U-000-EM-02

U-000-EM-033.64.2 S-000-EM-01

3.5 4.1 S-000-EM-02

3.9 4.5 S-000-EM-033.94.5 U-000-EM-14

2.4.38 2.2 4.0 S-000-EM-15

295026 3.6 3.8 S-000-EM-24

T-000-AD-04

T-000-EM-09T-000-EM-11

T-000-EM-16

(SCENARIOREVIEWCHECKLISTSCENARIONUMBERHLTS3-1

§....Total Malfunctions

Inserted;List:(4-8)1)HighPressureHeaterIsolation2)3AFPCpumptrip3)RFPTtrip4)RCICsteamleak5)RCICfailuretoisolate(autoormanual)6)HPCI120VFailure

7)RPSAutoScramFailure8)BPVFailure9)ARI Automatic FailureMalfunctionsThatOccurAfterEOIEntry

List
(1-4)1)RCICsteamleak2)RCICisolationfailure(autoormanual)3)TwoADSvalvefailuresAbnormalEvents;List(1-3)1)HPHeater

1501.(ARPs)2)3AFPCpumptrip

.(AOI&ARP)3)RFPTstrip(ARP,AOI)

_1_MajorTransients;List:(1-2)1)RCICSteamLineBreak.a,EOlsused;List:(1-3)1)EOI-12)EOI-23)EOI-3_1_EOI Contingencies

Used;List:(0-3)

1)C290RunTime(minutes)29EOIRunTime(minutes)

30%ofScenarioEOIRunTime

LCrewCritical

Tasks yes Technical SpecificationsExercised(yes/no)

HLTS-3-1

Revision0

Page40of41

(XIV.SHIFT TURNOVER INFORMATION

Equ ipmentoutof service/LCOs

Unit3hasbeenoperatingfor193days,Unit2hasbeenoperatingfor56days.Un it1hasbeenoperat

ingfor290days

.3EDDiesel Generatoristaggedforwaterjacketleakagerepair.Day2o

f LCO.willbereturnedtoservicethissh ift.Operation/Ma

intenancefortheShift

Supportscheduledma

intenanceandtestingact

ivities AlternateStatorCooling

Wate rPumpsper 3-01-35A.Sect6.4forscheduledma

intenanceon3AStator

Cooling Water Pump.HPCISRinprogressforrupturediskpressureswitchesby

1M's.UnusualCondit

ions/Problem

Areas: FuelleakersonU3arecurrently

@RFI60,000.

Stormspassingthroughtheregion

, No Watches in effectforthe immediate a rea.3CRFPwasoscillating

approximately30RPMduringthelastshift,butcurrentlyworkingproperlyandbeingmonitored

.3CRFPisoperatingin

automatictocollectdatafornext24hours.Atroubleshootingplanisbeingdeveloped

.

AppendixD Scenario Outline FINAL Form ES-D-lFacility:BFNScenarioNumber:HLTS-3-2Op-TestNumber:HLT0610

Examiners:

Operators:

Initial Conditions:Unit3isat79%power.3CRHRPumpisout

ofservice.T.S 3.5.l.A.l,3.6.2.3,3.6.2.4, 3.6.2.5havebeen entered.Unit3is6hoursintoasevendayLCO.

AppendixRLCO addressedandinLCOtracking.LoopII

ofRHRhasbeen ventedwithinthehourin

preparation

for placingToruscoolinginservice.Valve

3-FCV-73-36

seal-incircuithasbeen

disabledperstep7.6 of 3-SR-3.5.1.7

Turnover:Continuewith

3-SR-3.5.1.7

whichisinprogressandis

completeuptoStep7.11 (HPCr Main and BoosterPumpSet Developed HeadandFlowRateTestatRated

Reactor Pressure).AlternateEHCPumpsper

section 6.3 of3-01-47A.

Increase reactor powerto85%usingRecircflow(3-

G01-100-12

,step5.132)withno

pre-conditioning

limitations.

Reactor Engineeringwillevaluatefurtherpowerchanges.

Event Malfunction

Event Event Number Number Type*Description

1 N/A N-BOPThecrewwillalternateEHCpumpsusing

3-01-47A.N-SRO 2 N/AR-ATCThecrewwill

continue with power ascension using 3-G01-l2R-SROand3-01-68.

3 irnfhp08 C-BOPThecrewwill

recognize and respondtoaHPCrsteamline

C-SRObreak.HPCrwillfailtoautoisolateandmustbemanually

TS-SRO isolated.TheSROwillenterand

execute E01-3.4 irnfadOlg40 C-ATCThecrewwill

recognize and respondtoastuckopenSRVC-SROusing

3-A01-l-1.

TS-SRO 5.batRRPAVIB

MThecrewwill

recognize and respondtoarecircpumphigh

irnfcr02a75Allvibration,dualsealfailure

,trip,core poweroscillationsand

3:00 scram.ThecrewwillcarryoutactionsusingE01-l&2and3-A01-

100-1.6 irnf 002100MThecrewwill

recognize and respondtoa MsrvClosureand

1:30 AllLOCAusing E01-l&2.Thecrewwill

monitor and control primary containment

untilreactorwaterlevel

approachesTAF.Thecrewwill

transitiontoEOr C-l and perform Emergency Depressurizationtoenablelevel

restorationusinglowpressure

systems.*(N)ormal, (R)eactivity,(Ijnstrument,(C)omponent

, (M)ajor

(HLTS-3-2REV0PAGE1OF63 SIMULATOREVALUATIONGUIDE

TITLE REVISION DATE PROGRAM HPCI STEAMLINE BREAK ,SRVFAILURE,RECIRCPUMPTRIP,DRYWELL

LEAK, EMERGENCY DEPRESSURIZATIONONLEVEL(C1)

o January19,2008 BFN OperatorTraining-HotLicensePREPAREDBY

ateREVIEWEDBY
\Date CONCURRED:\z.-?Date 2/1/oP VALIDATION

BY:\DateRequirescopyof3-SR-3

.5.1.7 (current rev.)completeduptostep7

.11tobeprovidedtocrewatturnover

(HLTS-3-2REV0

PAGE2OF63 NUCLEAR TRAINING REVISION/USAGE

LOG REVISION DESCRIPTION

OF DATE PAGES REVIEWED BY NUMBER REVISION AFFECTED 0 INITIAL 1/19/08 All csf

HLTS-3-2REV0

PAGE3OF63 (I.Program: II.Course: III.Title: BFN Operator TrainingHotLicenseTraining

HPCI STEAMLINEBREAK,SRVFAILURE,RECIRCPUMPTRIP

, DRYWELL LEAK , EMERGENCY DEPRESSURIZATIONONLEVEL(C1)

(IV.V.LengthofScenario:

",1to1%hours Examination

Objectives

A.Terminal Objective 1.Performroutineshift

turnover , plant assessmentandroutineshiftoperationin

accordancewithBFNprocedures.

2.Given abnormal conditions,theoperatingcrewwillplacetheunitinastabilizedconditionpernormal , abnormal , annunciator

and emergency procedures.

B.EnablingObjectives:1.Theoperatingcrewwill

alternateEHCpumps.2.Theoperatingcrewwill

continuepowerascension

from",79%power.3.Theoperatingcrewwill

experienceaHPCIsteamlinebreakduring

performanceof 3.5.1.7 IHPCIFlowRate

,withafailureofHPCItoautoisolate.

4.Theoperatingcrewwill

recognizeandrespondtoa

safety-reliefvalvefailedopen.

5.Theoperatingcrewwill

recognizeandrespondtoahighvibrationandtripof3ARecirc

pump.6.Theoperatingcrewwillrecogn

izeandrespondto

reactor power oscillations

by scramm ing the reactor.7.Theoperatingcrewwill

recognizeandrespondtoahighdrywell

pressure condition.8.Theoperatingcrewwill

Emergency De-pressurizewheninC1before

reactor water levelreaches-180

".

HLTS-3-2 REV a PAGE40F63 VI.References

The proceduresusedinthe simulatorarecontrolledcopiesandareusedin

development

and performance

of simulator scenarios.

Scenariosarevalidatedpriortouse,andany

procedure differences

will be corrected us ing the procedurerevisionlevel

presentinthesimulator.Any

procedure differences

noted during presentationwillbe correctedinthesame manner.Assuch ,itis expectedthatthereferenceslistedinthissectionneedonlycontainthe

referencematerialwhichisnotavailableinthe

simulator.VII.Training Materials: A.Calculator

B.ControlRodInsertionSheet

C.Stopwatch D.Hold Order/Caution

tags E.Annunciator

window covers F.Steamtables

(VIII.Console Operators Instructions

A.Scenario File Summary 1.File: bat HLTS3-2 MF/RF/10R#a)trge1 MODESW b)trge2 adssrv1-22c)ior zlohs7416a[1]

off d)imfrh01ce)ior ypobkrpmpcrh

faiLpower f)mrf hw01 fast g)imf th33b(e10)12:00

h)imfth21(e15:00)0.5 10:00 i)imfrd01a(e1 10:00)j)imf rd01b k)imf hp09 I)lor zdihs718a closem)ior ypovfcv718

fail-power

n)imfrp11(e11:00)2.File:bat RRPAVIB MF/RF/10R#

1)imf th12a 2)imfth1Oa(none1

)3)imf th11a (none2:)4)iorzdihs681open

HLTS-3-2 REVO

PAGE5OF63 Description

Sets trigger Sets triggerTagOut3CRHR3CRHRPumptrip

Control powerforRHR3C breaker Advances all chartsBMSL break in DW Recirc.line break 3ACRDP trip 3B CRDP trip Failure ofHPCItoauto

isolateFailsRCICKeepsthe71-8valve

closed MSIVlogicfuse failure Description

Inserts Vibration Alarm Fails RecircPumpA Inboard Seal Fails RecircPumpA Outboard Seal)Prevents Recirc Pump A Suction Valve Closure

HLTS-3-2REV0PAGE6 OF63 DESCRIPTION/ACTIONVerifylenscoversonEHCpumpsarecorrectPlacesuppressionpoolcoolinginservice(LoopII)VerifyFunctionKeysSeeScenarioFileSummarybatHLTS3-2PlaceHOtagson'3C

'RHRpump Place TESTING/MAINTframeson Panel9-3F, Windows 5,11,26forHPCI3-SR-3.5.1.7completeuptostep7

.11EstablishesFunctionKeys

C learsFunctionKeyPopup

"" 78 O/OPowerMOC,use mid-power runback push buttonProvideacopyof3-SR-3.6.2.1.1,SuppressionChamber

Water Temperature

Checks.(B.ConsoleOperatorsManipulations

ELAP.TIME PFK#Simulator setuprst28 Simulator setup restorepref

HLTS3-2 Simulator setup setup S imulator setup esc S imulator setup F3 Simulator setup manual Simulator setup manual Simulator setup manual Simulator setup manual Simulator setup manual PLAY: When asked for local EHC pressure, (3-PI-047-0001(0002>>

indicates 1625 psig.(3-01-47A section 6.3 step[4].ROLE PLAY: When asked, EHC pump 38EHCPUMPSUCTIONFILTERandEHCAUXPUMPSUCTIONFILTERS, indicate CLEAN, (3-01-47A section 6.3 step[11].ROLE PLAY: When asked, MANUAL FLOW CONTROL VALVE,3-047-0588,is

setat2.0 turns clockwise.

(3-01-47A section 6.3 step[12].ROLE PLAY: If asked, state that the anti-rotation

collar markings are aligned.WhenHPCIisatratedpressureand

flowF4imfhp08SteamleakintoHPCIroom

ROLE PLAY:AUOatHPCI quad.Reports a large steam leakonHPCIand present location is elev.565 Rx.8Idg.WhendirectedbyLead

Instructor

When RO cycles SRV then:WhendirectedbyLead

Instructor

F6 F7 F8 imfad01c40 dmf ad01cbatRRPAVIBFailsSRV-1-22openSRV-1-22closesRecircPumpAhighvibration,sealfailure,suctionvalvefailstocloseandpower

oscillations.

ROLE PLAY: When dispatched

to check 3A Recirc Vibration, wait 2 minutes and report back swinging 10 to 14 mils.

(HLTS-3-2 REVO

PAGE7 OF63C.Console Operators ManipulationsELAP.TIME PFK#DESCRIPTION/ACTIONWhen'A'RecirctripsF9dmfth12aDeletesvibrationhighalarm4min.after3Arecirc.pumptrip

F10imfcr02a753

00Corepower oscillations

then: and F11 imfth22(none1:30)100BottomheadleakWhenrequested,wait3minutes

F12batapp16fgDefeatsRHRinjectionvalvetimersTerminatethescenariowhenthefollowingconditionsaresatisfiedareatthedirectionoftheLeadExaminer.1.RPV waterlevel+2"to+51" 2.Drywellsprayed

3.Emergency Depressurizarion

completed

(HLTS-3-2REV0 PAGE 80F63 IX.Scenario SummaryGivenUnit3at79%power,thecrewwill

alternateEHCpumpsandresumepower

ascensionto100%.As SR-3.5.1.7,HPCIFlowRate,iscontinuedthecrewwill

experiencearupturedHPCIsteamlinewithafailure

ofHPCIto automatically

isolate.ManualHPCIisolationwillbepossible

.Aspower ascensioniscontinued,an

SRVfailsopenbutcanbeclosedasstepsof3-AOI-1-1areperformed.Thecrew

experienceshighvibrationwitha subsequenttripandsealleakageonthe3ARecircPumpresultinginhigh

drywellpressure.Whenthe

diesel generators

automaticallystartthe3EDdiesel

generatorfailstoautostartbutcanbemanuallystarted.

Finally ,thecrewwill

Emergency Depressurizes

before reactorwaterlevelreaches-200".

(x.HLTS-3-2 REVOPAGE9OF63InformationtoFloorInstructors

A.EnsurerecordersareinkingandrecordingandICSisactiveandupdating.B.AssignCrewPositionsbasedontherequiredrotation.

1.2.3.SRO: ATC: BOP:UnitSupervisorBoardUnitOperatorDeskUnitOperator

C.ConductashiftturnoverwiththeUnitSupervisor.D.Directtheshiftcrewtoreviewthecontrolboardandtakenoteofpresentconditions,alarms,etc.E.Terminatethescenariowhenthefollowingconditionsaresatisfiedareattherequestofthe

floorzlead

instructor/evaluator.1.RPVwaterlevel+2"to+51" 2.EmergencyDepressurizarioncompleted

(XI.SimulatorEventGuideEvent1: AlternateEHCPumps HLTS-3-2 REVOPAGE10OF63

TIME POSITION EXPECTED ACTION(S)(ATC/BOP SRO BOPReceivecrewbriefingandwalkboardsdownDirectsBOPtoalternateEHC

pumpsEHCPumsin accordance

with 3-01-47A section 6.3[1]VERIFYEHCSysisinservice.REFERTOSection5.1.

[2]REVIEW Precautions

&LimitationslistedinSection3

.0.[3]START the non-operatingEHCPUMP 3B(3A)usingEHCHYDFLUID

PUMP 3B(3A), 3-HS-47-2A(1A).

[4]CHECKthestartedEHCpumpEHCHYDPUMPA(B)DISCHPRESS

,047-0001(0002)

,indicatesbetween1550ps

igand1750psig,locallyattheEHC

skid.(AUOreports1625psig)[5]IFthestartedEHCpump

discharge pressureisNOTbetween1550psigand1750psig,THEN

ADJUST the pressure compensatorforthestartedEHCpump

to adjust pump discharge pressure.REFERTOStep8.6[1].

[6]STOPEHCPUMP 3A(3B)usingEHCHYDFLUID

PUMP 3A(3B), 3-HS-47-1A(2A).

(XI.SimulatorEventGuideEvent1:AlternateEHCPumps

HLTS-3-2 REVOPAGE11OF63

(TIMEPOSITIONEXPECTED

ACTION(S)[7]CHECKEHCHEADERPRESSURE,3-PI-47-7,indicatesbetween1550psigand1650psig

.[8]IFEHCheaderpressureisNOTbetween1550psigand1650psig

, THEN ADJUSTthepressure

compensatorfortheoperatingEHCpumptoadjustEHCheaderpressure.REFERTOStep8.6[2].[9]IFthereareany

disagreement

flags , THEN RESET disagreementflagsbyplacingtheoperatingpump

handswitch

, EHCHYDFLUIDPUMP3A(3B)

, 3-HS-47-1A(2A),toSTART.[10]CHECK the startedEHCPUMP 3B(3A)MTRAMPS, 3-EI-47-2(1), indicates less than 140 amps.[11]VERIFYEHCPump3B(3A)

,EHCPUMPSUCTIONFILTERandEHCAUXPUMPSUCTIONFILTERS,indicateCLEAN,locallyattheEHCskid.

[12][NERlC]VERIFY MANUAL FLOW CONTROLVALVE,3-047-0588,issetat2.0turns clockwise.[INPOSOER84-006]BOPSwapslenscoversforEHCpumpsbasedonnewlineup

SimulatorEventGuide(Continued)

(XI.Event2: POSITION SRO HLTS-3-2 REVOPAGE12OF63PowerAscension

EXPECTED ACTION(S)irects ower ascensioner3-GOI-100-12

ste 6.2 and 3-01-68 (ATCRaisesreactorpowerin

accordance

with3-GOI-100-12

and 3-01-68[1]IFNOTin

single loop operation, THEN ADJUST Recirc Pump speeds 3A using, RAISE SLOW (MEDIUM),15A(15B)/LOWER

SLOW(MEDIUM)

3-HS-96-17A(17B), push-buttons, to achieve balanced jet pump flows.AND/ORADJUSTRecircPumpspeed3Busing,RAISE

SLOW (MEDIUM), 3-HS-96-6A(16B)

/LOWER SLOW(MEDIUM)

3-HS-96-18A(18B),pushbuttons,toachievebalancedjetpumpflows.[2]WHENdesiredtocontrolRecircPumps3Aand/or3BspeedwiththeRECIRCMASTERCONTROL,THEN

ADJUST Recirc Pump speed 3A&3B using the following push buttons as required: RAISE SLOW, 3-HS-96-31

RAISE MEDIUM, 3-HS-96-32

LOWERSLOW,3-HS-96-33

LOWERMEDIUM,3-HS-96-34

LOWER FAST, 3-HS-96-35

BOP Performsaspeer checkerforrecircflowchanges

Simulator Event Guide (Continued)

(XI.Event 3a: POSITION HLTS-3-2 REVOPAGE13 OF63 HPCI Surveillence

EXPECTED ACTION(S)SRO irectsto continue with

at step.111BOP[11]ALIGNHPCISystemforamanualstartbyperformingthefollowingsteps:

[11.1]CHECK HPCI SYSTEM FLOW/CONTROL

3-FIC-73-33isinAUTOandSETtocontrolat500(5,000gpm)

.IFrequired,THEN

DEPRESSAUTOoperationmode

transferswitchand ADJUST setpoint using Setpointup/downkeys.

[11.2]PLACE HPCI STEAM PACKING EXHAUSTER by placing 3-HS-73-10A

to START.[11.3]VERIFY 3-FCV-73-36,usingHPCI/RCICCST

TEST VLV 3-HS-73-36A,isOPEN.[11.4]OPEN 3-FCV-73-35, usingHPCIPUMPCST

TEST VLV, 3-HS-73-35A.

[12]START the HPCI turbine by performing

the following:

[12.1][NER]VERIFY communicationisestablishedwith

Operations

personnelinHPCIRoom.[IE93-67]

[12.2)[NER)

REQUEST OperationspersonnelinHPCIRoom,to

ensurethatall unnecessary

personnelhaveexitedHPCIRoom.[IE93-67)

[12.3][NER]ANNOUNCE HPCI turbine startup over plant public address system.[IE 93-67]

Simulator Event Guide (Continued)

(XI.Event 3a: POSITION HLTS-3-2 REVO

PAGE14 OF63 HPCI Surveillence

EXPECTED ACTION(S)BOP[12.4]PLACE HPCI AUXILIARY OIL PUMP 3-HS-73-47A

to START.[12.5]OPEN 3-FCV-73-30, usingHPCIPUMPMIN

FLOW VALVE,3-HS-73-30A.

[12.6]ENSURE personnelarereadyto

monitor 3-FCV-73-18forsmooth operation.AND NOTIFY the personnel monitoring

thatthenextstepwillopen

3-FCV-73-18.

[12.7]OPEN 3-FCV-73-16, using HPCI TURBINE STEAM SUPPLY VLV,HS-73-16A.

[12.8]OBSERVEthatthefollowing

actions occurs:oHPCI AUXILIARYOILPUMPstarts

.o[NRC/C]HPCI TURBINE STOP VALVE 3-FCV-73-18

opens by observingZI-73-18 position indicating

lights.[Appendix R]oHPCI TURBINE CONTROL VALVE 3-FCV-73-19partiallyorfullyopensby

observing 3-ZI-73-19positionindicatinglights.

Simulator Event Guide (Continued)

(XI.Event 3a: POSITION HLTS-3-2 REVOPAGE15OF63

HPCI Surveillence

EXPECTED ACTION(S)o[NRC/C]HPCIPUMPMIN

FLOW VALVE 3-FCV-73-30

closeswhenHPCI SYSTEM FLOW/CONTROL

3-FIC-73-33

indicates approximately125gpm)flow.[Appendix R]o HPCI turbinespeedrisesto

greaterthan2400rpmas

indicatedonHPCI TURBINE SPEED 3-SI-73-51

.oHPCISTMLINECNDS

INBD/OUTBDDRVLVS 3-FCV-73-6A

and6Bcloseby observing 3-ZI-73-6A and 3-ZI-73-6B

position indicating

lights.o HPCI AUXILIARY OIL PUMP stops as turbinespeedrises.

[12.9]VERIFY Smooth operation of 3-FCV-73-18

and mark results below.Yes_No_(oIFthe Answer aboveis"NO", THEN NOTIFY System Engineer to initiate a WO and proceedwithtest.(Otherwise

N/A)[12.10]VERIFY RESET the following annunciators:oHPCI PUMP DISCH FLOW LOW 3-FA-73-33

(3-XA-55-3F, window 5)oHPCI TURBINE TRIPPED 3-ZA-73-18

(3-XA-55-3F, window 11)o HPCI TURBINE GLANDSEALDRAIN PRESSURE HIGH 3-PA-73-46

(3-XA-55-3F, window 14)o HPCI TURBINE BEARING OIL PRESSURE LOW 3-PA-73-47

(3-XA-55-3F, window 19)[12.11]VERIFYsystemflow, discharge pressure, and turbine speed are stable prior to performing

the next step.

SimulatorEventGuide(Continued)

(XI.Event3b: POSITION HLTS-3-2 REVOPAGE16 OF63HPCISteamLineBreakEXPECTEDACTIONeS)BOPRespondstoReactorBldgHiRadalarmper

3-ARP-9-3A

window 22 A.DETERMINE area with high radiation levelonPanel3-9-11.(Alarm on Panel 3-9-11 will automatically

reset if radiation level lowers below setpoint.)

DeterminesHPCIarea source ofhirad B.IFthealarmisfromtheHPCIRoomwhileFlowtestingisbeingperformed

,THENREQUESTpersonnelattheHPCIQuadtovalidateconditions.

C.NOTIFY RADCON.D.IFtheTSCisNOTmannedanda"VALID"radiologicalconditionexists

.,THENUSE public address system to evacuate area where high airborne conditions

existE.IFtheTSCismannedanda

"VALID"radiologicalconditionexists,THEN

REQUESTtheTSCtoevacuatenon-essentialpersonnelfromaffectedareas.

Simulator Event Guide (Continued)

(XI.Event 3b: POSITION SRO HLTS-3-2REV0PAGE17OF63HPCISteamLine

Break EXPECTED ACTION(S)F.MONITOR other parameters

providing inputtothis annunciator

frequently

as these parameterswillbe masked from alarmingwhilethis alarm is sealed in.G.IFa CREVinitiationis

received, THEN 1.VERIFY CREVA(B)Flowis2700CFM,and s3300CFMas indicatedon FI-031-7214(7213)within5 hours of the CREV initiation

.[BFPER 03-017922]2.IF CREVA(B)Flowis

NOT2700CFM,and

s3300CFMas indicatedon FI-031-7214(7213)

THEN PERFORM the following: (Otherwise

N/A)[BFPER 03-017922]

a.STOP the operating CREVper0-01-31.

b.START the standby CREVper0-01-31

.

SimulatorEventGuide (Continued)

(XI.Event 3b: POSITION HLTS-3-2REV0

PAGE18 OF63HPCISteamLineBreak

EXPECTED ACTIONeS)BOPRespondstoHPCILeakDetectionTempHialarmper

3-ARP-9-3F

window 10 A.CHECK HPCI temperature

switchesonLEAK DETECTION SYSTEM TEMPERATURE

, 3-TI-69-29onPanel3-9-21.B.IF high temperature

is confirmed,THENNTER 3-EOI-3 Flowchart C.CHECKfollowingonPanel3-9-11and

NOTIFYRADCONifrisingradiationlevelsareobserved:1.HPCIROOMEL519RXBLDGradiation

indicator , 3-RI-90-24A.

2.RHR WESTROOMEL519RXBLDGradiationindicator, 3-RI-90-25A.

D.DISPATCH personnel to investigate

for leaks consistent

with ALARA considerationsinHPCI TurbineArea(EI519)

and HPCI Steam Supply Area (EI550).Recognizes

HPCI not isolated when isolation lights are illuminated

Notifies Unit Supervisor

HPCI failed to isolate and 3-FCV-73-2

and73-3are still open.

HLTS-3-2 REV aPAGE19 OF63XI.SimulatorEventGuide(Continued)Event3b: POSITIONHPCISteamLineBreakEXPECTEDACTION(S)

SRO Directs HPCI manually isolated (Critical step)BOP ATCHPCI steam supply by closing3-FCV-73-2andReceivesEOI-3entryonfloodlevelinHPCIroom

3-ARP-9-4c

window 10 A.DISPATCHpersonneltoVISUALLYCHECKtheHPCIroom.

B.IFpossible,THENDETERMINEthesourceoftheleakandtheleakrate.SRORe-entersEOI-3onfloodlevelBOPNotifiesRadConandFireProtectionMonitorsforloweringtemperatureandradiationlevelsinHPCIarea(aftersuccessfulisolation)

SimulatorEventGuide(Continued)

(XI.Event3b: POSITION HLTS-3-2REV0PAGE20 OF63HPCISteamLineBreak

EXPECTED ACTION(S)SRO into

BOP Immediate Actions[1]VERIFY automaticactionsoccur

.HPCITurbineTRIPS

.HPCISTEAMLINEINBDISOLVALVE,3-FCV-73-2CLOSES.HPCISTEAMLINEOUTBDISOLVALVE,3-FCV-73-3CLOSES.

HPCISTEAMLINE

WARM-UPVALVE,3-FCV-73-81CLOSES.HPCIPUMPMIN

FLOW VALVE, 3-FCV-73-30

CLOSES.HPCISUPPRPOOLINBDSUCTVLV, 3-FCV-73-26

CLOSES.HPCISUPPRPOOLOUTBDSUCTVLV,3-FCV-73-27CLOSES.

HPCI TURBINESTOPVALVE, 3-FCV-73-18

CLOSES.

SimulatorEventGuide (Continued)

(XI.Event 3b: POSITION HLTS-3-2REV0

PAGE21OF63HPCISteamLineBreak

EXPECTED ACTION(S)(BOP SUbsequent

Actions[1]IFANYEOIentry

conditionismet,THEN

ENTER the appropriate

EOI(s).[2]DISPATCH an operatortotheHPCI Turbineroomto investigate.

[3]CHECKthefollowing

monitorsforariseinactivityorarea

temperature:

AREA RADIATION, 3-RR-90-1,Point23 (RM-90-24), Panel 3-9-2 AIR PARTICULATERADMON, 3-MON-90-50

, Address 024 (3-RM-90-58),Panel3-9-2RB&TB REFUELING ZONEEXHRAD MONITOR, 0-CONS-90-362, Address 08 , 3-RM-90-250,Panel1-9-44

LEAKDETSYS,TI-69-29,Panel3-9-21, DEPRESS pushbuttontoread 73-55A through 550.

SimulatorEventGuide(Continued)

(XI.Event3b: POSITION HLTS-3-2 REVO

PAGE22OF63HPCISteamLineBreakEXPECTEDACTION(S)BOP[4]VERIFYthefollowingvalvesOPENtodraintheHPCIsteamlines.MNSTMLINEDRAININBDVLV,3-FCV-1-55OUTBDISOLATIONVLV,3-FCV-1--56,[5]IFtheHPCITURBINEEXHDRAINPOTLEVELHIGH3-LA-73-83F,Window33)annunciatorisinalarm

,THENPERFORMthefollowing

[5.1]OPEN theHPCITURBEXHCNDSPOTLCV,3-LCV-73-8.[5.2]WHENtheannunciatorHPCITURBINEEXHDRAINPOTLEVELHIGH

resets ,THENCLOSE theHPCITURBEXHCNDSPOTLCV,3-LCV-73-8.

SRO Determines

unitin14dayLCO(TS3.5.1.C-HPCI

inop.Verify RCIC OPERABLE by administrative

means)Determines

unitin72 hourLCO(TS 3.5.1.0-HPCIandCRHR

Inop)Tech.Specs.3.6.1.3.B.1,onFCV73-2

or 73-3 when tagged (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to close and de-activate)EXAMINERNOTE:Whenthe

valves are closed they are now considered

OPERABLE because theyarein the required position following an isolation signal, however the isolation logic is still INOPERATIVE.

Simulator Event Guide (Continued)

(XI.Event 4: HLTS-3-2 REV a PAGE 23 OF63 SRV-1-22FailsOpen POSITION CREW Recognizes

SRV open EXPECTED ACTIONeS)SRO*MainSteam

Relief ValveOpenalarm*lowering generator output (BOP Immediate Action[1]IDENTIFY stuck open relief valve by OBSERVING the following:

SRV TAILPIPE FLOW MONITOR , 3-FMT-1-4,onPanel3-9-3,OR

MSRV DISCHARGE TAILPIPE TEMPERATURE

,3-TR-1-1onPanel3-9-47.

Determines

SRV-1-22 from acoustic monitor[2]WHILE OBSERVING the indicationsforthe affected Relief valveonthe Acoustic Monitor;CYCLE the affected relief valve control switch several times as required:CLOSEtoOPENtoCLOSE

positions Cycles reliefvalveand reports SRV closed[3]IFall SRVs are CLOSED, THEN CONTINUEatStep4.2.3.(Otherwise

N/A)

SimulatorEventGuide(Continued)

(XI.Event4: HLTS-3-2REV0 PAGE240F63SRV-1-22FailsOpen(continued)TIMEPOSITIONEXPECTEDACTION(S)BOP4.2.3OtherActionsandDocumentation[1]IFANYEOIentryconditionismet,THENENTERtheappropriateEOI(s).[2]REFERTO

Technical Specifications Sections 3.5.1and3.4.3 for Automatic Depressurization

System and relief valve operability

requirements.[3]INITIATEsuppressionpoolcoolingasnecessarytomaintainsuppressionpooltemperaturelessthan95°F.[4]IFthereliefvalvecanNOTbeclosedANDsuppressionpooltemperatureCanNOTbema

intainedlessthanorequalto95°F,THENPLACEthereactorMode4inaccordancewith3-GOI-100-12A.[5]DOCUMENTactionstakenandINITIATEWorkOrderforthevalve

.SRO EvaluatesTechSpec operability

of ADS valvelAWTS3.5.1(H)and

3.4.3(A).Determines

valve operableand3.5.1.His

not applicable, but requests Eng.evaluation.(Functional

evaluation)

SimulatorEventGuide(Continued)

(XI.Event5: HLTS-3-2REV0PAGE25OF63RecircVibration,SealLeakage,PowerOscillationsandScram

POSITIONEXPECTEDACTIONS

ATC Announces Recirc"3A" high vibration alarm 3*ARP*9-4A

window 20ConsultsARPforPanel9-4

A.CHECK temperaturesforRECIRCPMPMTR3A

WINDINGANDBRGTEMPrecorder, 3-TR-68-58onPanel3-9-21arebelowthoselistedfor

55-4A, Window 13.B.CHECKforariseinDrywellequipsumppumpoutrateduetosealleakage.

C.DISPATCH personnel to 3*LPNL*925*0412(VibrationMon.System)onEL565'(S-R17)andREPORTtheVibrationDataforPumpAtotheUnit

Operatorandanyotheralarmindications.ThepersonshalladvisetheUnit

Operator ofanychangesinthevibrationvalues.D.IF alarm sealsin,THEN ADJUST pump speed slightly to try reset the alarm.E.IF unable to reset alarm, THEN CONSULT with Shift Manager, and with his concurrence, SHUTDOWN the Recirc pumpandREFERTO

3*AOI-68*1A or 3*AOI-68*1B.F.IFpumpoperationcontinues,THENRECORDpump3Aseal

parametershourlyon Attachment1,Page22ofthisARP.

Simulator Event Guide (Continued)

(XI.Event 5: HLTS-3-2REV0PAGE26 OF63 RecircVibration,SealLeakage, Power Oscillations

and Scram POSITION SRO Contacts Reactor Engineer EXPECTED ACTIONS (ATC AnnouncesRecircASeal

Leakage Alarm 3-ARP-9-4A

window 25 A.DETERMINEinitiatingcauseby

comparingNO.1and2sealcavity

pressure indicatorsonPanel3-9-4orICS

.PluggingofNo

.1RO-NO.2sealcavity

pressure indicator dropstowardzero,andcontrol

leakage lowers to0.5gpm.Pluggingof

NO.2 RO-NO.2 seal pressure approachesno.1seal pressureandcontrol

leakage lowers to0.5 gpm.FailureofNo.1seal-

NO.2 seal pressure is greaterthan50%ofthe

pressure of NO.1.The controlled

leakagewillbe0.9 gpm.Failure of NO.2seal-no.2seal pressureislessthan50%oftheNO.1seal.

SimulatorEventGuide (Continued)

(XI.Event5: HLTS-3-2REV0PAGE27OF63

RecircVibration,SealLeakage

, Power OscillationsandScram POSITION EXPECTED ACTIONS (ATC IdentifiesSealFailurevia

Instrumentation

RecognizesloweringpressureonRecircPumpA#1seal

B.RECORDpumpseal

parametershourlyon Attachment1,Page28ofthis

procedure ,unlessother

acceptable

compensatory

methodsforrecordingthese

parametersisevaluatedand

approvedbyEngineering

.C.IFsinglesealfailureisindicated,THEN

INITIATE seal replacementassoonaspossible

.Continuedoperation

i s permissible

if DrywelileakrateiswithinT.S.

limits.SRO Directscrewto watch for signs of increased leakage ATC AcknowledgesRecircPumpAseal

leakoffhighalarm;

3-ARP-9-4A

window 18 , informs SRO.Recognizes

lowering pressureonRecircPumpAoutboardseal;

informs SRO Monitors drywell parameters

notes pressure and temperature

increasing;

informs SRO

SimulatorEventGuide(Cont

inued)(XI.Event5: HLTS-3-2REV0

PAGE28 OF63RecircVibration

,SealLeakage,PowerOscillationsandScram

POSITIONEXPECTEDACTIONS

(SROWhen vibration report received or dual seal failure is reported, directs'A'Recirc Pump trippedATCC.IFdualsealfailureisindicated,THEN1.SHUTDOWN

Recirc Pump3Aby depressingRECIRCDRIVE3A

SHUTDOWN,3-HS-96-19.

2.VERIFYTRIPPED

,RECIRCDRIVE3ANORMALFEEDER,3-HS-57-17.3.VERIFYTRIPPED,RECIRCDRIVE3AALTERNATEFEEDER,3-HS-57-15.4.CLOSE Recirculation

Pump 3A suction valve.-REPORTtoSRO

of failure of suction valve to close.Directs AUO to close Recirc Pump suction valve locallyatBoard.5.CLOSE Recirculation

Pump 3A discharge valve.6.EFERTO3-AOI-68-1A

or3-AOI-68-1BAND7.DISPATCH

personnel to secure Recirculation

Pump3Aseal water.

SimulatorEventGuide(Continued)

(XI.Event5: HLTS-3-2REV0PAGE29OF63RecircVibration,SealLeakage

,PowerOscillationsandScram(Continued)

POSITIONEXPECTEDACTIONSATC[2]ChecksPowertoflowmaptoverifyinregion1or2

InformsSROofbeinginregion1ChecksAPRMsandLPRMsforindicationofpoweroscillations

InformsSROof Power Oscillations

SRODirectsinserting

emergency shove sheet control rodsBOPKeepsSROinformedasdrywellpressureapproaches2.45psig

SimulatorEventGuide (Continued)

(XI.Event 5: HLTS-3-2REV0PAGE30 OF63 RecircVibration,SealLeakage,Power

OscillationsandScram (Continued)

POSITION EXPECTED ACTIONS SRO irects ventin er 3-AOI-64-1EXAMINERNOTE:

Venting may not be performedbasedon Drywell pressure.BOP[3]VENTDrywellasfollows

[3.1]CLOSESUPPRCHBRINBDISOLATIONVLV3-FCV-64-34(Panel

3).[3.2]VERIFY OPEN , DRYWELLINBDISOLATIONVLV,3-FCV-64-31(Panel 9-3).[3.3]VERIFY 3-FIC-84-20isinAUTOandSETat100scfm(Panel3-9-55)

.[3.4]VERIFYRunning,requiredStandbyGas

Treatment Fan(s)SGTS Train(s)A,B,C(Panel3-9-25)

.[3.5]IFrequired,THEN

REQUESTUnit1 Operator to STARTStandbyGas

TreatmentFan(s)SGTS

Train(s)A,B.(Otherwise

N/A)

SimulatorEventGuide(Continued)

(XI.Event5: HLTS-3-2 REVOPAGE31OF63RecircVibration,SealLeakage,PowerOscillationsandScram(Continued)

POSITION EXPECTED ACTIONS[3.6]IFrequired

,THENRECORDventingdatain

3-SI-4.7.A.2.a (Otherwise

N/A)[3.7]PLACE

3-FCV-84-20

CONTROL DW/SUPPR CHBRVENT,3-HS-64-35,inOPEN(Panel3-9-3).

[3.8]MONITORstackreleaseratestopreventexceedingODCMlimits.DirectsLogspersontomonitorreleaseratesSRODirectsmanualreactorscrampriortoreaching2.45psigDWpressureATC Scramsthereactor

HLTS-3-2REV0

PAGE32OF63

XI.SimulatorEventGu ide (Continued)Event5:RecircVibration

,SealLeakage

,PowerOscillat

ionsandScram(Continued)

POSITION SROirects3-AOI-100-1EXPECTEDACTIONSATCCarryoutactionsof3-AOI-100-1

SRO SROirectsventinBOP1.VERIFYatleastoneSGTStrain

inservice.2.VERIFYCLOSEDthefollowingvalves(Panel3-9-3orPanel3-9

-54): 3-FCV-64-31

,DRYWELLINBOARDISOLATIONVLV, 3-FCV-64-29,DRYWELLVENTINBDISOLVALVE

,3-FCV-64-34,SUPPRCHBRINBOARDISOLATIONVLV, 3-FCV-64-32

,SUPPRCHBRVENTINBDISOLVALVE.

S imulator Event Guide (Continued)

(XI.Event 5: HLTS-3-2 REVOPAGE33 OF63 Recirc Vibrat ion, Seal Leakage, Power Oscillations

and Scram (Continued)

POSITION EXPECTED ACTIONS 3.IF...While executing this procedure to vent the Suppression

Chamber , Suppression

Pool waterlevelcannotbe

determinedtobe below20ft , THEN.PERFORMstep13to secure the ventpathand reenter this procedure if furtherventingisrequired

.4.IF...While executing this procedure, the desired ventpathis lostorcannot be established

, THEN.PERFORMstep13to secure the ventpathand reenter this procedure if further ventingisrequired.

(BOP5.IF...While executing this procedure , CAD addition per SAMG-2, Step G-4ORG-9,istobegin, THEN.BEFORECADisinitiated, PERFORMStep13to secure the vent path.NOTE: Ventingmaybe accomplished

using EITHER: 3-FIC-84-19,PATHB VENT FLOWCONT , OR 3-FIC-84-20,PATHA VENT FLOWCONT.NOTE: UnlesstheTSC recommends

otherwise,ventingthe

Drywell DIRECTLY should be performed ONLYifthe Suppression

Chamber can NOTbevented.

Simulator Event Guide (Continued)

(XI.Event 5: HLTS-3-2REV0PAGE34 OF63 Recirc Vibration,SealLeakage, Power OscillationsandScram (Continued)

POSITION EXPECTED ACTIONS6.IF...ANYofthefollowingexists:

Suppression

Pool waterlevelcannotbe

determinedtobebelow20ft,OR

Suppression

ChambercanNOTbevented,OR

SRO orders DIRECTdrywellventing,THEN

CONTINUEinthis procedure at:Step10to venttheDrywellthrough

3-FCV-84-19, ORStep11toventtheDrywellthrough

3-FCV-84-20.

7.CONTINUEinthis procedure at:Step8to vent the Suppression

Chamber through3-FCV-84-19,ORStep9toventthe

Suppression

Chamber through 3-FCV-84-20.

SimulatorEventGuide(Continued)

(XI.Event5: HLTS-3-2REV0

PAGE35OF63RecircVibration

,SealLeakage

,PowerOscillationsandScram(Continued)

POSITION EXPECTED ACTIONS (BOP8.VENTtheSuppression

Chamberusing3-FIC-84-19,PATHB

VENT FLOWCONT,asfollows

a.PLACE keylock switch 3-HS-84-35, DW/SUPPR CHBR VENTISOLBYP SELECT, to SUPPR-CHBR

position (Panel 3-9-54).b.VERIFYOPEN3-FCV-64-32,SUPPRCHBRVENTINBDISOLVALVE(Panel3-9-54).c.PLACE 3-FIC-84-19,PATHBVENT FLOWCONT,inAUTO

with setpoint at 100 scfm (Panel 3-9-55).d.PLACE keylock switch 3-HS-84-19, 3-FCV-84-19

CONTROL,inOPEN (Panel 3-9-55).e.VERIFY3-FIC-84-19,PATHBVENT

FLOWCONT,isindicating

approximately100scfm.f.CONTINUE in this procedure at step 12.

Simulator Event Guide (Continued)

(XI.Event 5: HLTS-3-2REV0PAGE36OF63

Recirc Vibration , Seal Leakage , Power OscillationsandScram (Continued)

POSITION EXPECTED ACTIONS (BOP12.ADJUST 3-FIC-84-19,PATH8 VENT FLOW CONT, or 3-FIC-84-20, PATH A VENT FLOWCONT,as applicable, to maintain ALL of the following:

o Stable flow as indicated on controller, AND o 3-PA-84-21, VENTPRESSTOSGTHIGH, alarm light extinguished, AND o Release rates as determined

below:i.IF...PRIMARY CONTAINMENT

FLOODINGperC-1, AlternateLevelControl

, isin progress THEN..MAINTAINreleaseratesbelowthose

specified in Attachment

2.ii.IF...Severe Accident Management

Guidelinesarebeing executed ,THEN..MAINTAINreleaseratesbelowthose

specifiedbytheTSCSAM

Team.iii.IF...Venting for ANY other reason than items i or ii above,THEN..MAINTAIN release rates below 00 Stack release rate of1.4x107 J.lCi/s AND 0-SI-4.8.8.1.a.1

release fraction of 1.BOP Contacts LOG AUO to monitor release rates

SimulatorEventGuide(Continued)

(XI.EVENT6: HLTS-3-2 REV 0PAGE37 OF63 MSIV CLOSURE/LOCA

TIME POSITION EXPECTED ACTION(S)SRO-Directs RPV pressure controlled

800 to 1000 psigwithoneormoreofthefollowing

-Directs RPV level be maintained

between+2" to+51"withoneormoreofthefollowing:-RCIC(App5C)(willnotwork)-CRD(App56)

60P Controls pressure 800 to 1000 psigwithoneormoreofthefollowing:1.IF.....DrywellControlAirisNOTavailable,THEN

...EXECUTEEOI

Appendix aG, CROSSTIECADTO DRYWELL CONTROL AIR, CONCURRENTLYwiththisprocedure.

2.IF.....SuppressionPoollevelisatorbelow5.5ft,THEN...CLOSEMSRVs

and CONTROLRPVpressureusingotheroptions

.

HLTS-3-2 REVOPAGE38OF63

XI.SimulatorEventGuide(Continued)EVENT6: MSIV CLOSURE/LOCA

POSITION EXPECTED ACTIONS (BOP3.OPEN MSRVs using the following sequence to control RPV pressure as directed by SRO: a.1 3-PCV-1-179MNSTMLINEARELIEFVALVE.b.2 3-PCV-1-180MNSTMLINEDRELIEFVALVE.c.33-PCV-1-4MNSTMLINEARELIEFVALVE.d.43-PCV-1-31MNSTMLINECRELIEFVALVE

.e.5 3-PCV-1-23MNSTMLINEBRELIEFVALVE.

f.63-PCV-1-42MNSTMLINEDRELIEFVALVE.g.73-PCV-1-30MNSTMLINECRELIEFVALVE.

h.83-PCV-1-19MNSTMLINEBRELIEFVALVE.i.9 3-PCV-1-5MNSTMLINEARELIEFVALVE.

j.103-PCV-1-41MNSTMLINEDRELIEFVALVE

.k.113-PCV-1-22MNSTMLINEBRELIEFVALVE.

I.12 3-PCV-1-18MNSTMLINEBRELIEFVALVE.m.13 3-PCV-1-34MNSTMLINECRELIEFVALVE.

HLTS-3-2 REVO

PAGE39 OF63XI.SimulatorEventGuide(Continued)EVENT6:MSIVCLOSURE/LOCA

POSITIONEXPECTEDACTIONSBOPRecognizesMSIVclosuresandreportstoSRO

.BOPControlsRPVlevel+2to+51withoneormoreofthefollowing:

(BOP1.IF.....MaximuminjectionflowisNOTrequired,THEN

...VERIFYCRDalignedasfollows

a.VERIFYatleastoneCRDpumpinserviceandalignedtoUnit3CRDsystem

.b.ADJUST3-FIC-85-11,CRDSYSTEMFLOWCONTROL,as

necessary to obtain flow rate of 65 to 85 gpm.c.THROTTLE3-PCV-85-23,CRDDRIVE

WATERPRESSCONTROLVLV, to maintain 250 to 350 psid drive water header pressure differential.

d.EXITthisprocedure.

Simulator Event Guide (Continued)

(XI.EVENT 6: HLTS-3-2 REVOPAGE40OF63

MSIV CLOSURE/LOCA

POSITION EXPECTED ACTIONS2.IF.....BOTHofthefollowingexist:CRDisNOTrequiredforrodinsertion,AND

Maximum injection flowisrequired, THEN...LINEUPALL

available CRD pumpstotheRPVas

follows:a.IF.....CRDPump3Aisavailable,THEN...

VERIFY RUNNINGCRDPump3Aor3B.b.IF.....CRDPump3Bisavailable,THEN...

VERIFY RUNNINGCRDPump3Aor3B.c.OPEN the following valves to increase CRD flow to the RPV: 3-PCV-85-23,CRDDRIVE WATER PRESS CONTROL VLV 3-PCV-85-27, CRD CLG WATER PRESS CONTROL VLV 3-FCV-85-50,CRDEXHRTNLINE

SHUTOFF VALVE.BOP Reports 38 CRD pump tripped

HLTS-3-2REV0PAGE41OF63XI.SimulatorEventGuide(Continued)EVENT6:MSIVCLOSURE/LOCA(continued)TIMEPOSITIONEXPECTEDACTIONSBOPd.ADJUST3-FIC-85-11,CRDSYSTEMFLOWCONTROL

,onPanel9-5to

control injection WHILE maintaining3-PI-85-13A,CRDACCUMCHGWTRHDRPRESS, above 1450 psig, if possible.e.IFAdditionalflowisnecessarytopreventormitigatecoredamage

,THENDISPATCHpersonneltofullyopenthefollowingvalvesas

required: o 3-THV-085-0527,CRDPUMPDISCHTHROTTLING(RBNE,e1565')

o 3-BYV-085-0551

,CRDPUMPTESTBYPASS(RBNE

,el565').SRO Directs determiningthecause of the isolation Directs H 2 0 2 Analyzersplacedin serviceBOPPlacesH

2 0 2Analyzersinservice1.Place Analyzer isolation bypass keylock switches to bypass.2.SelectOWorSupp Chmbr and momentarily

pull out select switch handle to start sample pumps.

HLTS-3-2REV0PAGE42 OF63 XI.SimulatorEventGuide(Continued)EVENT6: MSIV CLOSUREILOCA (continued)

TIME POSITIONEXPECTEDACTIONeS)

SRO Directs SP coolinbelacedin service Rer A RBOPPlacesSPcoolinginserviceperApp17A2.PLACERHRSYSTEM

1(11)inSuppressionPoolCoolingasfollows:a.VERIFYatleastone

RHRSWpumpsupplyingeach

EECW header.b.VERIFY RHRSWpumpsupplyingdesiredRHRHeat

Exchanger(s)

.c.THROTTLE the following in-service

RHRSW outlet valves to obtain between 1350 and 4500 gpm RHRSW flow: 3-FCV-23-34,RHRHX3ARHRSW

OUTLET VLV 3-FCV-23-46,RHRHX 38 RHRSW OUTLET VLV 3-FCV-23-40,RHRHX3CRHRSW

OUTLET VLV 3-FCV-23-52,RHRHX3D RHRSW OUTLET VLV.

SimulatorEventGuide(Continued)

(XI.EVENT6: HLTS-3-2 REV 0 PAGE430F63MSIVCLOSURE/LOCA(continued)TIMEPOSITIONEXPECTEDACTION(S)d.IF.....DirectedbySRO,THEN...PLACE

the following keylock switches in MANUAL OVERRIDE:3-XS-74-122,RHRSYSI

LPCI2/3COREHEIGHTOVRD.3-XS-74-130,RHRSYSII

LPCI2/3COREHEIGHTOVRD.e.IF.....LPCIINITIATION

Signal exists,THEN...MOMENTARILY

PLACE the following in select:3-XS-74-121,RHRSYSICTMTSPRAY/CLGVLVSELECT.3-XS-74-129,RHRSYSIICTMTSPRAY/CLGVLVSELECT.

Simulator Event Guide (Continued)

(XI.EVENT 6: HLTS-3-2 REV 0 PAGE44OF63 MSIV CLOSURE/LOCA (continued)

TIME POSITION EXPECTED ACTIONeS)BOPf.IF 3-FCV-74-53(67)

,RHRSYS 1(11)LPCIINBD INJECT VALVE , is OPEN , THEN VERIFY CLOSED 3-FCV-74-52(66),RHRSYS 1(11)LPCI OUTBD INJECT VALVE.g.OPEN 3-FCV-74-57(71),RHRSYS 1(11)SUPPR CHBR/POOL ISOL VLV.h.VERIFY desired RHR pump(s)for Suppression

Pool Cooling are operating.

i.THROTTLE 3-FCV-74-59(73), RHR SYS 1(11)SUPPR POOL CLGITEST VLV, to maintain EITHER of the following as indicated on 3-FI-74-50(64), RHR SYS 1(11)FLOW: Between 7,000 and 10,000 gpm for one-pump Operation.

OR At or below 13,000 gpm for two-pump operation.

j.VERIFY CLOSED 3-FCV-74-7(30)

, RHR SYSTEM 1(11)MIN FLOW VALVE (VERIFY CLOSED 3-BKR-074-0007(0030)

on 480V RMOV Board 3D(3E), Compartment

4E(4E), if required).

HLTS-3-2 REV aPAGE45OF63XI.SimulatorEventGuide (Continued)EVENT6: MSIV CLOSUREILOCA (continued)TIMEPOSITION

EXPECTED ACTION(S)k.MONITORRHRPumpNPSH

using Attachment

1.I.NOTIFY Chemistry thatRHRSWis aligned to in-serviceRHRHeat Exchangers.m.IF.....Additional

SuppressionPoolCoolingflowis

necessary,THEN...PLACE additionalRHRandRHRSWpumpsinserviceusingSteps2.bthrough

2.1.ATC/BOP Monitors containment

parameters

SRO ntersEOI-2onOW Rressul'eandre-enters

EOI-1 and directs the following:

Verify all available DW coolers in service SRO Directs cooldownATC/BOPVerifyallavailableDWcoolersinservice

ATC/BOP Commences a cooldown as directed SRO Determines

cannot maintain suppression

chamber pressurelessthan 12 psig and directs suppression

chamber sprayed

HLTS-3-2 REVOPAGE46 OF63 XI.SimulatorEventGuide (Continued)

EVENT 6: MSIV CLOSUREILOCA (continued)

TIME POSITION EXPECTED ACTION(S)BOP ression chamber 17Q 1.BEFORE Suppression

Chamber pressuredropsbelow0psig, CONTINUE in this procedureatStep6.2.IF.....Adequatecorecoolingisassured,ORDirectedbyEOI-2tospraythe

Suppression

Chamber irrespective

of adequatecorecooling

,THEN...BYPASS LPCllnjectionValveTimersas

necessary using EOI Appendices16Fand 16G.3.IF.....DirectedbySROtospraythe

Suppression

ChamberusingStandby

CoolantSupply,THEN

...CONTINUEinthis procedureatStep7.4.IF.....DirectedbySROtospraythe

Suppression

ChamberusingFireProtection,THEN...

CONTINUEinthis procedureatStep8.

Simulator Event Guide (Continued)

(XI.EVENT 6: HLTS-3-2 REV aPAGE47OF63

MSIV CLOSUREILOCA (continued)

TIME POSITION EXPECTED ACTION(S)5.INITIATE Suppression

Chamber Sprays as follows:a.VERIFYatleastone

RHRSWpumpsupply

ing each EECW header.b.IF.....EITHERofthefollowingexists

.LPCllnitiationsignalisNOTpresent,OR

DirectedbySRO,THEN...

PLACE keylock switch 3-XS-74-122(130), RHR SYS 1(11)LPCI2/3CORE

HEIGHTOVRD,in MANUAL OVERRIDE.c.MOMENTARILY

PLACE3-XS-74-121(129),RHRSYS

1(11)CTMT SPRAY/CLG VLV SELECT, switch in SELECT.d.IF 3-FCV-74-53(67),RHRSYS 1(11)INBD INJECTVALVE,isOPEN

, THEN VERIFY CLOSED 3-FCV-74-52(66)

,RHRSYS 1(11)OUTBD INJECT VALVE.e.VERIFY OPERATINGthedesiredRHRSystem

1(11)pump(s)for

Suppression

Chamber Spray.f.VERIFY OPEN 3-FCV-74-57(71)

,RHRSYS 1(11)SUPPR CHBR/POOL (SOL VLV.g.OPEN 3-FCV-74-58(72),RHRSYS 1(11)SUPPR CHBR SPRAY VALVE.

HLTS-3-2REV0

PAGE48OF63

XI.SimulatorEventGuide(Continued)EVENT6: MSIV CLOSUREILOCA (continued)TIMEPOSITIONEXPECTEDACTION(S)BOPh.IF.....RHRSystem

1(11)isoperatingONLYinSuppression

Chamber Spraymode,THEN.

..CONTINUEinthisprocedureatStep5.k.

i.VERIFYCLOSED3-FCV-74-7(30),RHRSYSTEM

1(11)MIN FLOW VALVE(VERIFYCLOSED3-BKR-074-0007(0030)on480VRMOVBoard3D(3E), Compartment4E(4E),ifrequired).[,RAISE system flow by placing the second RHR System 1(11)pump in service as necessary.

k.MONITORRHRPumpNPSHusingAttachment2.

I.VERIFYRHRSWpumpsupplyingdesiredRHRHeatExchanger(s).

m.THROTTLE the following in-service

RHRSW outlet valves to obtain between1,350and4,500

gpm flow:.3-FCV-23-34,RHRHX3ARHRSW

OUTLET VLV.3-FCV-23-46,RHRHX

38 RHRSW OUTLET VLV3-FCV-23-40,RHRHX3CRHRSW

OUTLET VLV3-FCV-23-52,RHRHX3DRHRSW

OUTLET VLV.n.NOTIFY Chemistry thatRHRSWis aligned to in-serviceRHRHeat Exchangers.

HLTS-3-2 REVO

PAGE49 OF63 XI.SimulatorEventGuide(Continued)EVENT6: MSIV CLOSURE/LOCA (continued)TIMEPOSITIONEXPECTEDACTION(S)BOP6.WHEN...EITHERofthefollowingexists:BeforeSuppressionPoolpressuredropsbelow0psig,ORDirectedbySROtostopSuppression

ChamberSprays,THEN...STOP

Suppression

Chamber Sprays as follows:a.CLOSE3-FCV-74-58(72),RHRSYS

1(11)SUPPR CHBR SPRAY VALVE.b.VERIFYCLOSED3-FCV-74-100,RHRSYSIU-2DISCHXTIEc.IF.....RHRoperationisdesiredinANYothermode,THEN

...EXITthisEOI

Appendix.d.STOPRHR Pumps3Aand3C(3Band3D).e.CLOSE 3-FCV-74-57(71),RHRSYS 1(11)SUPPR CHBR/POOLISOLVLV.

SimulatorEventGuide(Continued)

(XI.EVENT6: HLTS-3-2 REVOPAGE50 OF63 MSIV CLOSURE/LOCA (continued)TIMEPOSITIONEXPECTED

ACTION(S)SRO When SC pressure exceeds 12 psig or if SRO determines

cannot maintain OW temp.<280 then directs the following:

  • Ensures Recirc.pumps shutdown*OW blowers secured 17B (ATC Trips Recirc.pumps BOP Secures OW blowers Requests 16F&16Gbe performedSpraystheDWusingRHRperApp17B1.BEFOREDrywellpressuredropsbelow0psig, CONTINUEinthisprocedureatStep7.2.IF.....Adequatecorecoolingisassured,ORDirectedtospraytheDrywell

irrespectiveofadequatecorecooling,THEN.

..BYPASS LPCllnjection

Valve Timers as necessary using EOI Appendices

16F and 16G.

SimulatorEventGuide(Continued)

(XI.EVENT6: HLTS-3-2REV0PAGE51OF63

MSIV CLOSURE/LOCA (continued)TIMEPOSITION

EXPECTED ACTION(S)BOP3.VERIFYRecircPumpsandDrywellBlowersshutdown.4.IFDirectedbySROtospraytheDrywellusingStandbyCoolantsupply, THEN CONTINUEinthisprocedureatStep8.5.IF.....DirectedbySROtospraytheDrywellusingFireProtection

,THEN...CONTINUEinthis procedureatStep9.6.INITIATEDrywellSpraysasfollows

a.VERIFYatleastone

RHRSWpumpsupplyingeach

EECW header.b.IF.....EITHERofthefollowingexists:LPCIInitiationsignalisNOTpresent,OR

.DirectedbySRO,THEN...

PLACE keylock switch 3-XS-74-122(130), RHR SYS 1(11)LPCI 2/3 CORE HEIGHTOVRD,in MANUAL OVERRIDE.c.MOMENTARILY

PLACE3-XS-74-121(129),RHRSYS

1(11)CTMT SPRAY/CLG VLV SELECT, switch in SELECT.

Simulator Event Gu ide (Continued)

(XI.EVENT 6: HLTS-3-2 REVOPAGE52OF63

MSIV CLOSURE/LOCA (continued)

(TIME POSITION EXPECTED ACTION(S)d.IF 3-FCV-74-53(67),RHRSYS 1(11)LPCIINBD INJECT VALVE,isOPEN, THEN VERIFY CLOSED 3-FCV-74-52(66)

,RHRSYS 1(11)LPCI OUTBD INJECT VALVE.e.VERIFY OPERATING the desired System 1(11)RHR pump(s)for Drywell Spray.f.OPEN the following valves:.3-FCV-74-60(74), RHR SYS 1(11)OW SPRAY OUTBO VLV.3-FCV-74-61(75),RHRSYS 1(11)OW SPRAY INBO VLV.g.VERIFY CLOSED 3-FCV-74-7(30), RHR SYSTEM 1(11)MIN FLOW VALVE (VERIFY CLOSED 3-BKR-074-0007(0030)

on 480V RMOV Board 3D(3E), Compartment

4E(4E), ifrequ ired).

SimulatorEventGuide (Continued)

(XI.EVENT 6: HLTS-3-2 REVOPAGE53 OF63 MSIV CLOSURE/LOCA (continued)

(TIME POSITION EXPECTED ACTION(S)BOPh.IF.....

Additional

Drywell Spray flow is necessary,THEN*..PLACE the second System 1(11)RHR Pump in service.i.MONITORRHRPumpNPSHusing

Attachment

2.j.VERIFY RHRSWpumpsupplyingdesiredRHRHeat

Exchanger(s).

k.THROTTLE the following in-service

RHRSW outlet valves to obtain between 1,350 and 4,500 gpm RHRSW flow:*3-FCV-23-34,RHRHX3ARHRSW

OUTLET VLV*3-FCV-23-46,RHRHX 38 RHRSW OUTLET VLV*3-FCV-23-40,RHRHX3CRHRSW

OUTLET VLV*3-FCV-23-52,RHRHX3DRHRSW

OUTLET VLV.I.NOTIFY Chemistry that RHRSW is aligned to in-service

RHR Heat Exchangers.

HLTS-3-2 REVOPAGE54OF63XI.SimulatorEventGuide(Continued)EVENT6:MSIVCLOSUREILOCA(continued)TIMEPOSITIONEXPECTEDACTION(S)

SRO DirectsOWsprays/SC

sprays be stopped when thatareareaches0

psig BOP Stops DW/SC sprays when thatareareaches0psigMonitorscontainmentparametersSROMonitorsRPVwaterlevel,determineslevelis

lowering.Re-enters EOI-1 at+2"RPVlevel

Directs performance

ofApp7B(SLC)ATCCalls Rx BldgAUOto performApp7BCrewMonitors

Drywelll PSC IandRPVwaterlevel

SRO ntersC1at A:I-100"to-122 u Directs ADS inhibited ATC Closes RFP discharge valves Reports3ACROP tripped

HLTS-3-2REV0

PAGE55OF63XI.SimulatorEventGuide(Continued)EVENT6:MSIVCLOSURE/LOCA(continued)TIMEPOSITIONEXPECTEDACTION(S)

BOP Inhibits ADS SRO After entering C1 align all available injection systems for injection.-Containment

sprays terminatedWhenwaterlevelreachesTAF(-162")andbefore-200directsthe

following: Enters C2 (Critical step)SixADS valves opened (Critical step)RPV level returned+2" to+51"BOPWhen directedbyUS terminates

Containment

Sprays and lines up RHRforLPCI

BOP Opens and verifies open6ADS valves Critical ste)SRO Directs restoring Rx level with Condensate, Core Spray, or RHR (Critical step)SRO Classifies

event as Site Area Emergency (1.1-81)(ATC/BOP Restores RPV water level+2" to+51" using:-RHR-Core Spray-Condensate (Critical step)

(XI.HLTS-3-2REV0PAGE56OF63

Simulator Event Guide (Continued)

EVENT 6: MSIV CLOSURE/LOCA (continued)

TIME POSITION EXPECTED ACTION(S)'A 6A Condensat e 1.VERIFY CLOSEDthefollowing

Feedwater heater return valves: 3-FCV-3-71,HPHTR3A1LONGCYCLETO

CNDR 3-FCV-3-72,HPHTR381LONGCYCLETO

CNDR 3-FCV-3-73

,HPHTR3C1LONGCYCLETOCNDR.

2.VERIFY CLOSEDthefollowingRFP

discharge valves: 3-FCV-3-19,RFP3A DISCHARGE VALVE 3-FCV-3-12, RFP 38 DISCHARGE VALVE 3-FCV-3-5 ,RFP3C DISCHARGE VALVE.3.VERIFYOPENthefollowingdrain

coolerinletvalves:

3-FCV-2-72

, DRAIN COOLER3A5CNDS INLET ISOL VLV 3-FCV-2-84, DRAIN COOLER 385 CNDS INLETISOLVLV 3-FCV-2-96, DRAIN COOLER3C5CNDS INLET ISOL VLV

(XI.HLTS-3-2 REVO

PAGE57OF63

SimulatorEventGuide (Continued)

EVENT 6: MSIV CLOSURE/LOCA (continued)

TIME POSITION EXPECTED ACTION(S)4.VERIFYOPENthefollowing

heateroutletvalves:

3-FCV-2-124, LP HEATER3A3CNDSOUTLISOLVLV

3-FCV-2-125,LPHEATER 383CNDSOUTLISOLVLV

3-FCV-2-126,LPHEATER3C3CNDSOUTLISOLVLV

.5.VERIFYOPENthefollowing

heaterisolationvalves:3-FCV-3-38,HPHTR3A2FWINLETISOLVLV3-FCV-3-31,HPHTR

382FWINLETISOLVLV3-FCV-3-24,HPHTR3C2FWINLETISOLVLV

3-FCV-3-75,HPHTR3A1FW

OUTLETISOLVLV 3-FCV-3-76,HPHTR381FW

OUTLETISOLVLV3-FCV-3-77,HPHTR3C1FW

OUTLETISOLVLV

HLTS-3-2REV0PAGE58OF63

XI.SimulatorEventGuide(Continued)EVENT6: MSIV CLOSUREILOCA (continued)

(TIMEPOSITIONEXPECTED

ACTION(S)6.VERIFYOPENthefollowingRFPsuctionvalves

3-FCV-2-83

,RFP3ASUCTIONVALVE3-FCV-2-95,RFP38SUCTIONVALVE3-FCV-2-108,RFP3CSUCTIONVALVE.

7.VERIFYatleastone

condensatepumprunning.

8.VERIFYatleastone

condensateboosterpumprunning.

9.ADJUST 3-LIC-3-53, RFW START-UP LEVEL CONTROL ,tocontrol injection (Panel 3-9-5).10.VERIFYRFWflowtoRPV

.