Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML05244032730 July 2003Discrimination Against a Senior Engineer for Raising Concerns Through the Corrective Action Program
ML05244045815 October 2003Memo to James Cavanaugh, from Kristin Monroe, Transcription in Interview Traps
ML05244045922 December 2003Memo from Wilson to Miller Salem/Hope Creek: Discrimination Against a Senior Engineer for Raising Concerns Through the Corrective Action Program
ML05244048327 September 2002Memo from Letts to Miller Salem/Hope Creek: Discrimination Against a Senior Reactor Engineer for Raising Concerns Through the Corrective Action Process
ML05263004624 December 2003Memorandum from R. Crlenjak of USNRC to G. Meyer of USNRC, Regarding Drop-In Visit from Frank Cassidy, PSEG Power
ML05265023326 September 2005Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors.
ML06052040116 March 2006Final Response to Task Interface Agreement - TIA 2005-002, Relating to the Integrity of the Reactor Recirculation System at Hope CreekFinite Element Analysis
Power change
ML0605904279 April 1999PSEG Memorandum from H. Kaiser to All Site Personnel, Regarding Safety Expectations
ML06066007827 September 2002Memorandum from J. Turner of PSEG to Safety Tagging Committee, Regarding Safety Tagging Committee Meeting for September 27, 2002, Including Handwritten Notes from K. HarvinSafe Shutdown
Condition Adverse to Quality
ML0606904073 June 2004Memorandum of Interview of Ford
ML0606904155 August 2004Memorandum of Telephone Discussion with Lake
ML06075074616 March 2006Forthcoming Meeting with PSEG Nuclear LLC Regarding Planned Application for Extended Power Uprate for Hope Creek Generating Station
ML06177055823 October 2003Memo, OI Interview of Witness on 10/23/2003
ML06178055910 July 2006Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
ML0619800817 July 2006OI Memo to File, Contract with Witness (Case No. 1-2003-051F)
ML0619800959 June 2004OI Memo to DRP on SCWE Interviews and Acquisition of Employee Concerns Program Documents (Case No. 1-2003-051F)Scaffolding
ML06200024926 January 2004Memorandum of Telephone Conversation with Individual
ML0620002655 August 2004Memorandum of Telephone Conversation with Individual
ML06200073326 January 2004Memorandum of Telephone Conversation
ML0620100747 July 2004Memo to Vito from Teator, Case 1-2003-051F and 1-2003-045
ML06221015028 January 2004Memorandum of Call to Dave from Harvin
ML0624203436 June 2004Memo to Barber from Wingfield, Review of Information Contained in Transcripts Stemming from the PSEG Safety Conscious Work Environment Investigation
ML0632800501 December 2006Y020060251 - Limerick, Units 1 and 2, Peach Bottom, Units 1 and 2, and Salem, Units 1 and 2 - Review of Notice of Disbursement from Decommissioning Trusts
ML0701001488 January 2007Draft RAI
ML07032026131 January 2007Draft Request for Additional Information
ML0703301782 February 2007Draft Request for Additional Information
ML07047008312 February 2007Draft Request for Additional Information (TAC Nos. MD3171 and MD3172)
ML0706004701 March 2007Closeout of Miscellaneous Licensing Activity Tacs
ML07178045627 June 2007Notice of Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station, to Discuss Acceptance Criteria for Boiling-Water Reactor Steam Dryer Predictive Load Under Power Uprate
ML0718604753 July 2007Draft Request for Additional Information
ML07198028317 July 2007Draft Request for Additional Information
ML0721500452 August 2007Draft Request for Additional InformationStroke time
Coast down
ML0721803866 August 2007Notice of Forthcoming Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating StationFinite Element Analysis
ML07240053028 August 2007Draft Request for Additional Information
ML0726402341 October 2007Notice of Closed Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station
ML07295027524 October 2007Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02Mission time
ML07302049129 October 2007Draft Request for Additional Information
ML07345068411 December 2007Draft Request for Additional Information
ML08016017616 January 2008and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information
ML08058053128 February 2008Federal Register Notice Regarding the Meeting of the ACRS Subcommittee on Power Uprates (Hope Creek), March 20-21, 2008
ML08072023711 March 2008Draft Request for Additional Information
ML08074008414 March 2008Draft Regulatory Guide for Comment
ML08102002111 April 2008Draft Request for Additional Information
ML08134011712 May 2008Draft Request for Additional InformationProbabilistic Risk Assessment
Design basis earthquake
ML08134052913 May 2008and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information, Changes to Quality Assurance Program
ML08162053812 June 2008Federal Register Notice Regarding the Meeting of the ACRS Subcommittee on Power Uprates (Hope Creek), July 8, 2008
ML08164019316 July 2008Foreign Travel Trip Report - NRC Staff Visit to Winterthur, Switzerland, to Observe Sump Strainer Testing Performed by Control Components, Incorporated - Detailed Technical DescriptionCoatings
ML08176060724 June 2008Draft Request for Additional Information
ML08183027930 June 2008Draft Request for Additional Information, Licensee'S Proposed Exemptions from Provisions of 10 CFR Section 50.82(a)(8)
ML08183055130 June 2008Draft Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors