Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ELV-00531, Advises That Date for Submittal of Reactor Vessel Level Instrumentation Sys Implementation Rept Postponed.Completed Implementation Rept Will Be Submitted by 89061518 May 1989Advises That Date for Submittal of Reactor Vessel Level Instrumentation Sys Implementation Rept Postponed.Completed Implementation Rept Will Be Submitted by 890615
ELV-00594, Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel8 June 1989Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel
ELV-00599, Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 18 June 1989Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1
ELV-00609, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices14 June 1989Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices
ELV-00610, Requests Amend to Util 880826 Exemption Request to Allow GMR-I Canisters to Be Stored in Class C Storage Environ. Exemption Should Be Granted by 90011528 September 1989Requests Amend to Util 880826 Exemption Request to Allow GMR-I Canisters to Be Stored in Class C Storage Environ. Exemption Should Be Granted by 900115Exemption Request
ELV-00615, Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Util Determined That No Tube Plugs Identified as Susceptible to Primary Water Stress Corrosion Cracking Installed in Steam Generators16 June 1989Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Util Determined That No Tube Plugs Identified as Susceptible to Primary Water Stress Corrosion Cracking Installed in Steam Generators
ELV-00634, Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage11 July 1989Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage
ELV-00650, Discusses Proposed Mods to Settlement Monitoring Program. Program Includes Specific Provisions for Reading of Settlement Markers & for Engineering Evaluation of Settlement data.W/45 Oversize Drawings23 June 1989Discusses Proposed Mods to Settlement Monitoring Program. Program Includes Specific Provisions for Reading of Settlement Markers & for Engineering Evaluation of Settlement data.W/45 Oversize Drawings
ELV-00659, Responds to Generic Ltr 89-06, SPDS & NUREG-1342 Re Industry Implementation of Spds.Util Commits to Maintain SPDS Supporting Documentation for 3 Yrs,Including Completed Checklist & Photographs of SPDS Implementation5 July 1989Responds to Generic Ltr 89-06, SPDS & NUREG-1342 Re Industry Implementation of Spds.Util Commits to Maintain SPDS Supporting Documentation for 3 Yrs,Including Completed Checklist & Photographs of SPDS Implementation
ELV-00665, Forwards Response to Violations Noted in Insp Rept 50-434/88-53.Response Withheld (Ref 10CFR2.790)29 June 1989Forwards Response to Violations Noted in Insp Rept 50-434/88-53.Response Withheld (Ref 10CFR2.790)
ELV-00696, Submits Supplemental Info Re Rev to Tech Spec 5.3.1.Rev Necessary in Order That Higher Enrichment Fuel May Be Used for Plant,Starting W/Cycle 317 July 1989Submits Supplemental Info Re Rev to Tech Spec 5.3.1.Rev Necessary in Order That Higher Enrichment Fuel May Be Used for Plant,Starting W/Cycle 3
ELV-00698, Responds to Violations Noted in Insp Repts 50-424/89-14 & 50-425/89-15.Corrective Actions:Engineering Personnel Instructed That Legibility & Reproducibility of as-built Includes Entire as-built Notice Page12 July 1989Responds to Violations Noted in Insp Repts 50-424/89-14 & 50-425/89-15.Corrective Actions:Engineering Personnel Instructed That Legibility & Reproducibility of as-built Includes Entire as-built Notice Page
ELV-00715, Forwards Response to Violations Noted in Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19.Response Withheld (Ref 10CFR2.790)20 July 1989Forwards Response to Violations Noted in Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19.Response Withheld (Ref 10CFR2.790)
ELV-00736, Revises Amends to Licenses NPF-68 & NPF-81,changing Tech Spec 3/4.6.1.6 Re Containment Structural Integrity.Encl Tech Spec Clarifies 890509 Submittal & Conclusions of Significant Hazards Consideration Evaluation Remain Valid28 July 1989Revises Amends to Licenses NPF-68 & NPF-81,changing Tech Spec 3/4.6.1.6 Re Containment Structural Integrity.Encl Tech Spec Clarifies 890509 Submittal & Conclusions of Significant Hazards Consideration Evaluation Remain Valid
ELV-00769, Forwards Response to Remaining Confirmatory Item on Dcrdr Re Review of Annunciator Nuisance Alarms,Proposed Mods to Minimize Nuisance Alarms & Number of Annunciator Windows Lit During Normal Operations8 August 1989Forwards Response to Remaining Confirmatory Item on Dcrdr Re Review of Annunciator Nuisance Alarms,Proposed Mods to Minimize Nuisance Alarms & Number of Annunciator Windows Lit During Normal OperationsBoric Acid
ELV-00812, Submits Rept Re Results of Leakage Exams Conducted During Fall 1988 Refueling Outage,Per TMI Item III.D.1.1 Re Leakage Outside Containment.None of Identified Leakage Considered to Be Excessive24 August 1989Submits Rept Re Results of Leakage Exams Conducted During Fall 1988 Refueling Outage,Per TMI Item III.D.1.1 Re Leakage Outside Containment.None of Identified Leakage Considered to Be Excessive
ELV-00817, Forwards Amend 13 to Physical Security Plan to Reflect Addition of Alternate Plant Entry & Security Bldg.Amend Withheld (Ref 10CFR2.790)21 August 1989Forwards Amend 13 to Physical Security Plan to Reflect Addition of Alternate Plant Entry & Security Bldg.Amend Withheld (Ref 10CFR2.790)
ELV-00818, Requests That All Correspondence to Licensee Re Plant Be Sent to Wg Hairston & Addl Copies to Individuals Listed22 August 1989Requests That All Correspondence to Licensee Re Plant Be Sent to Wg Hairston & Addl Copies to Individuals Listed
ELV-00820, Partially Withheld Ltr Forwarding Redacted Version of Settlement Agreement Between Williams Contracting,Inc & Util.W/O Encl18 August 1989Partially Withheld Ltr Forwarding Redacted Version of Settlement Agreement Between Williams Contracting,Inc & Util.W/O Encl
ELV-00830, Responds to Violations Noted in Insp Repts 50-424/89-20 & 50-425/89-24.Corrective Actions:All Open Reas Reviewed & REA-7604 Closed & New Rea Generated to Initiate Engineering Documentation & FSAR Changes24 August 1989Responds to Violations Noted in Insp Repts 50-424/89-20 & 50-425/89-24.Corrective Actions:All Open Reas Reviewed & REA-7604 Closed & New Rea Generated to Initiate Engineering Documentation & FSAR ChangesCondition Adverse to Quality
ELV-00846, Forwards Response to Violations Noted in Insp Repts 50-424/89-19 & 50-425/89-23.Corrective Actions:Interofc Correspondence Issued Explaining Problems Associated W/Two Pen Recorders That Have Channels Reflecting Same Value30 August 1989Forwards Response to Violations Noted in Insp Repts 50-424/89-19 & 50-425/89-23.Corrective Actions:Interofc Correspondence Issued Explaining Problems Associated W/Two Pen Recorders That Have Channels Reflecting Same Value
ELV-00868, Submits Addl Info & Clarification of 890717 Response to NRC Request Re Application for Amend to Licenses NPF-2 & NPF-8. Util Has Determined More Appropriate to Ack Conservatism in Core Fission Product Inventories Due to Core Average Burnup25 September 1989Submits Addl Info & Clarification of 890717 Response to NRC Request Re Application for Amend to Licenses NPF-2 & NPF-8. Util Has Determined More Appropriate to Ack Conservatism in Core Fission Product Inventories Due to Core Average Burnup
ELV-00875, Provides Addl Justification & Clarification for Changes to Rev 11 to Emergency Plan,Per NRC 890813 Request.Concludes That Effectiveness of Subj Plan Not Decreased by Allowing Drill Participation to Substitute for Classroom Training25 September 1989Provides Addl Justification & Clarification for Changes to Rev 11 to Emergency Plan,Per NRC 890813 Request.Concludes That Effectiveness of Subj Plan Not Decreased by Allowing Drill Participation to Substitute for Classroom Training
ELV-00890, Notifies That Listed Individuals No Longer Employed by Util, in Compliance to 10CFR55.55 & 10CFR55.515 September 1989Notifies That Listed Individuals No Longer Employed by Util, in Compliance to 10CFR55.55 & 10CFR55.5
ELV-00902, Requests Exemption from 10CFR20,App A,Footnote d-2(c) Re Worker Respiratory Protection Apparatus to Permit Utilization of Air Purifying Respirators in Lieu of Supplied Air or self-contained Breathing Apparatus28 September 1989Requests Exemption from 10CFR20,App A,Footnote d-2(c) Re Worker Respiratory Protection Apparatus to Permit Utilization of Air Purifying Respirators in Lieu of Supplied Air or self-contained Breathing ApparatusExemption Request
ELV-00914, Forwards NPDES Permit Ga 0026786,issued by State of Ga28 September 1989Forwards NPDES Permit Ga 0026786,issued by State of Ga
ELV-00952, Forwards Response to Violations Noted in Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803.Encl Withheld10 October 1989Forwards Response to Violations Noted in Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803.Encl Withheld
ELV-01500, Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities25 July 1990Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission FacilitiesDecommissioning Funding Plan
ELV-01599, Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator4 September 1990Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator
ELV-01834, Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21)28 June 1990Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21)
ELV-01858, Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete6 July 1990Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete
ELV-01867, Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered12 July 1990Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered
ELV-01918, Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion3 August 1990Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion
ELV-01943, Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned27 July 1990Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned
ELV-01949, Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable26 July 1990Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable
ELV-01956, Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request30 August 1990Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 RequestEarthquake
ELV-01973, Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical14 August 1990Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical
ELV-02022, Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld22 August 1990Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld
ELV-02027, Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively20 August 1990Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively
ELV-02028, Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d)22 August 1990Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d)Fitness for Duty
ELV-02050, Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required30 August 1990Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required
ELV-02056, Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam6 September 1990Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals ExamGeneric Fundamentals Examination
ELV-02059, Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B30 August 1990Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B
ELV-02088, Responds to Generic Ltr 90-03 Re Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components28 September 1990Responds to Generic Ltr 90-03 Re Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components
ELV-02089, Advises of Plans to Discontinue Submittal of Leak Rate Rept After Each Refueling Outage in Future2 November 1990Advises of Plans to Discontinue Submittal of Leak Rate Rept After Each Refueling Outage in Future
ELV-02102, Requests Waiver Compliance from Tech Specs 3.6.1.1,3.6.1.2 & 3.6.3 to Allow Testing of Check Valve 0163 October 1990Requests Waiver Compliance from Tech Specs 3.6.1.1,3.6.1.2 & 3.6.3 to Allow Testing of Check Valve 016
ELV-02126, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/90-15 & 50-425/90-15 on 900730-0803.Corrective Action:Survey of All Emergency Facility Documents Conducted to Identify & Correct Discrepancies25 September 1990Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/90-15 & 50-425/90-15 on 900730-0803.Corrective Action:Survey of All Emergency Facility Documents Conducted to Identify & Correct Discrepancies
ELV-02143, Forwards Addl Info Re 900911 Petition by Mb Hobby & AL Mosbaugh28 September 1990Forwards Addl Info Re 900911 Petition by Mb Hobby & AL Mosbaugh
ELV-02160, Provides Listed Info as Addenda to Request for Regional Waiver of Compliance4 October 1990Provides Listed Info as Addenda to Request for Regional Waiver of Compliance
ELV-02171, Forwards Amend 19 to Physical Security & Contingency Plan. Amend Withheld (Ref 10CFR73.21)17 October 1990Forwards Amend 19 to Physical Security & Contingency Plan. Amend Withheld (Ref 10CFR73.21)