Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20064D547 | 4 March 1994 | Requests Encl Listed Revs to Svc List | |
ML20064F625 | 24 February 1994 | Forwards Responses to RAIs Transmitted by NRC Re Sbwr Design.Draft Rept Entitled, Sbwr Containment Natural Aerosol Removal Also Encl | Safe Shutdown Fire Barrier Tornado Missile Earthquake Fuel cladding |
ML20064N489 | 23 March 1994 | Forwards Proprietary Addl Info Re Giraffe Facility Data.Encl Withheld (Ref 10CFR2.790) | |
ML20065C936 | 31 March 1994 | Forwards Response to Listed Requests for Addl Info Re Simplified BWR Design | |
ML20065D379 | 1 April 1994 | Outlines Approach GE Will Undertake to Address Issues Identified in NRC Re Sbwr Testing Program | |
ML20065E983 | 6 April 1994 | Advises That full-size Prototype HXs for Passive Containment Cooling Sys & Isolation Condenser Sys Will Be Tested by Siet & Enea at Performance Analysis & Testing of Heat Removal Sys Test Facility in Piacenza,Italy | |
ML20065M287 | 30 March 1994 | Forwards Draft Advanced Reactor Research & Development Programs 5-Yr Plan for Advanced Reactor Activities Under Energy Policy Act of 1992 | |
ML20065M865 | 21 April 1994 | Forwards Description of Contents of Tape Sent to BNL on 940302,providing Info Requested by RAI 950.43,in Fulfillment of NRC 940308 RAI Re Sbwr Design.Subj Info Withheld from Public Disclosure in Accordance w/10CFR2.790 | |
ML20065Q905 | 29 April 1994 | Forwards Final Readiness Assessment Rept for PANTHERS-PCC | |
ML20067B746 | 14 February 1994 | Provides Revised Response to RAI 900.32 Re Sbwr Design | |
ML20069B793 | 24 May 1994 | Forwards Responses to RAIs 260.1-260.8 Transmitted Via NRC Re Sbwr Design | |
ML20069E404 | 31 May 1994 | Forwards Addl Info Re Sbwr Design to Permit Confirmatory Testing.Encl Withheld (Ref 10CFR2.790) | |
ML20069E685 | 31 May 1994 | Submits NRC Requests for Addl Info on Simplified Boiling Water Reactor Design Re Panthers pre-test Calculation | |
ML20069J510 | 7 June 1994 | Proposes New Plan for Sbwr Certification Program,Which Realigns Program Milestones | |
ML20069L164 | 13 June 1994 | Informs That Sbwr Technology Reassessment Will Be Held on 940623 in San Jose,Ca.Listed Attachments 1-9 Encl.W/O Attachments 5 & 8.Attachments 5 & 8 Proprietary & Will Be Provided at Meeting | |
ML20069Q455 | 15 June 1994 | Forwards Revised Licensee List of Request for Addl Info Re Realignment of Sbwr Certification Program | |
ML20071B245 | 14 April 1994 | Informs That Deadline for Stakeholder Comments on Draft 5-Yr Plan for Advanced Reactor Activities Under Energy Policy Act of 1992, Extended Until 940502 | |
ML20071G145 | 1 July 1994 | Documents Use of Giraffe Test Data in Sbwr Certification Program | |
ML20071G155 | 3 June 1994 | Responds to NRC Re Quality of Sbwr Application | |
ML20072B329 | 13 January 1993 | Responds to on Issues of Passive Plant Safety Matters for Discussion at 930122 Meeting.No Fundamental Safety Issues Identified in AP600 & Sbwr Designs | Safe Shutdown Fitness for Duty Probabilistic Risk Assessment Temporary Modification Fire Protection Program |
ML20072E888 | 2 August 1994 | Forwards Response to NRC 940408 RAIs Re Simplified BWRs Design.Rev 1 to 25A5013, Isolation Condenser Sys | Hydrostatic Fuel cladding |
ML20072E914 | 16 August 1994 | Forwards Rev 0 to NEDC-32288, Scaling of Simplified BWR Related Tests | |
ML20072F134 | 10 August 1994 | Forwards NEDC-32391-P, Simplified BWR Test & Analysis Program Description, & Anticipated Schedule.W/O Encl | |
ML20072F137 | 10 August 1994 | Forwards NEDC-32391-P, Simplified BWR Test & Analysis Program Description, & Anticipated Schedule.Rept Withheld | |
ML20072F955 | 2 August 1994 | Forwards NRC Requests for Addl Info Re Sbwr Isolation Condenser Performance | Packing leak |
ML20072J182 | 18 August 1994 | Forwards Proprietary Slides Used at Sbwr NRC 940818 Meeting Re Sbwr Test & Analysis Program Description Rept, NEDC-32391-P.Encl Withheld (Ref 10CFR2.790) | |
ML20072Q603 | 6 September 1994 | Forwards UCB-NE-4193 & Rev 2 to UCB-NE-4201 in Response to RAI 950.48 | |
ML20072R494 | 31 August 1994 | Requests NRC Assessment of Sbwr Test & Analysis Program as Documented in & Discussed W/Nrc in 940818 Meeting & Discussed W/Acrs & NRC in 940824 Meeting | |
ML20072T219 | 31 August 1994 | Forwards Rev 2 to 23A6999, Isolation Condenser & Passive Containment Condenser Test Requirements Legend or Description of Groups | |
ML20073C366 | 15 September 1994 | Provides Comments of Draft Rept Scientific Design of Purdue University Multi-Dimensional Integral Test Assembly for GE Sbwr | Hydrostatic |
ML20073E713 | 23 September 1994 | Forwards Amend 1 to Sbwr Std SAR, 25A5113,Rev a | |
ML20073F437 | 15 September 1994 | Forwards Proprietary Rev a to NEDC-32391P, Licensing Topical Rept Sbwr Test & Analysis Program Description. Encl Withheld | |
ML20073F653 | 15 September 1994 | Forwards Rev a to NEDO-32391, Licensing Topical Rept Sbwr Test & Analysis Program Description | |
ML20073F680 | 26 September 1994 | Responds to Listed RAI Re Test Program for GE Sbwr | Ultimate heat sink |
ML20073G036 | 29 September 1994 | Forwards Responses to Requests for Addl Info Re Test Program for GE Nuclear Energy Sbwr, | |
ML20073L296 | 5 October 1994 | Forwards Responses to NRC 940408 RAI Re Sbwr Design | |
ML20073R928 | 3 February 1994 | Forwards Response to NRC 940104 Request for Addl Info Re Simplified BWR Design.W/One Oversize Drawing | |
ML20076H849 | 13 October 1994 | Forwards Revs to Responses to RAI 900.73 & 900.94 | |
ML20076H875 | 13 October 1994 | Submits Changes to Amend 1 to Sbwr Ssar, 25A5113 Rev a | |
ML20077F570 | 27 September 1993 | Forwards Three Proprietary Documents Requested in NRC Re RAI for Tracg Review | |
ML20077F582 | 15 September 1994 | Forwards GE Trip Rept That Concludes Giraffe Testing Program Performed in Manner Consistent W/Applicable Portions of QA Program,Per Telcon | |
ML20077F871 | 27 September 1993 | Forwards Two of Proprietary Documented Request in NRC Re RAI for Tracg Review.Related Documentation Encl | |
ML20077R316 | 13 January 1995 | Forwards BWR Vessel & Internals Project Program Plan | |
ML20078A312 | 19 January 1995 | Forwards Proprietary Response to Request for Addl Info on Giraffe Data.Encl Withheld (Ref 10CFR2.790) | |
ML20078E380 | 1 November 1994 | Forwards Proprietary Response to Request for Addl Info Re Sbwr Giraffe Tests.Encl Withheld (Ref 10CFR2.790) | |
ML20078L340 | 6 February 1995 | Transmits Info Presented at 950109 Meeting Between NRC & GE Re NRC SER on Test & Analysis Program for Sbwr.Info Presented at 950109 Meeting Withheld (Ref 10CFR2.790) | |
ML20078L343 | 6 February 1995 | Transmits Info Presented at 950109 Meeting Between NRC & GE Re NRC SER on Test & Analysis Program for Sbwr.Info Presented at 950109 Meeting Withheld (Ref 10CFR2.790) | |
ML20078L497 | 23 November 1994 | Forwards Response to Open Items from ACRS Subcommittee 940824 Meeting on Thermal Hydraulic Phenomena | |
ML20078N887 | 1 December 1994 | Provides Response to Open Items from 940824 ACRS Subcommittee Meeting on Thermal Hydraulic Phenomena | Squib |
ML20078Q064 | 12 December 1994 | Provides Addl Info to Suppl Three Ref Ltrs Responding to RAI Re Sbwr Panthers-PCC Test Facility.W/One Oversize Proprietary Drawing |