ML20076H875

From kanterella
Jump to navigation Jump to search
Submits Changes to Amend 1 to Sbwr SSAR, 25A5113 Rev a
ML20076H875
Person / Time
Site: 05200004
Issue date: 10/13/1994
From: Buchholz R
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
MFN-131-94, NUDOCS 9410240239
Download: ML20076H875 (2)


Text

i GE Nuclear Energy P. W. Mamoit, Mger GeneralEb tnc Company AdvancedPlant Technobgies 175 Curtner Genue, MC 781 San Jose, CA 95125-1014 406 92569e :1(phone) 408 925-1193(tacstnile)

October 13,19tM MFN No.131-94 Docket STN 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention:

Richard W. Borchardt, Director Standardization Project Directorate

Subject:

Submittal of Changes to Amendment I to the "SBWR Standard Safety Analysis Report",25A5113 Rev. A

Reference:

Submittal of Amendment 1 to the "SBWR Standard Safety Analysis Report", Letter from R. H. Buchholz to R. W. Borchardt, dated September 23,1994.

This letter transmits changes to Amendment 1 to the "SBWR Standard Safety Analysis Report", 25A5113 Resision A, previously transmitted by the reference letter. These changes include the addition of Section 4.2, a tab to place in front of new Section 18.8,17 x 22 drawings, and a revised set ofinstructions for placing the Amendment into the SSAR.

Sincerely, bbuckAse%

m R. H. Buchholz, Acting Manager Advanced Plant Technologies

Attachment:

Changes to Amendment 1 to the "SBWR Standard Safety Analysis Report", 25A5113 Revision A cc:

P. A. Bochnert (ACRS)

F. W. Hasselberg (NRC)

A M. Malloy (NRC)

P

'(,

  1. W 9430240239 9410D

\\%

DR ADOCK 0520

4 UNITED STATES OF AAir:RICA l

NUCLEAR REGULATORY COMMISSION In the N1atter of:

)

l General Electric Company

)

i l

SBWR Standard Plant Design

)

DOCKET No. STN-52-004 l

Final Design Approval and Design

)

Certification Application

)

i APPLICATION FOR REVIEW OF "SBWR STANDARD SAFETY ANALYSIS REPORT" FOR FINAL DESIGN APPROVAL AND DESIGN CERTIFICATION l

Steven R. Specker, being duly sworn, states that he is Vice President and General Afanager, GE Nuclear Energy, General Electric Company, that he is l

authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; that all statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.

GENERAL ELECTRIC COMPANY 1

I By:

l 9

l l

Steven R. Specker Vice President and General Manager GE Nuclear Energy Subscribed and sworn tg l

before me on this 7

day of September 1994.

ecrearr hhium?

<bA$

Notary Public p -

MARY L KENDAtt z ? {q i,,

j~

COMM. # 987864 z

3

' Notory Puc.ic - Cokfornia

$ANTA CLARA COUNTY F

~

j My Comm, Expres MAR 26.1997 )

.__