ML20076H875
| ML20076H875 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 10/13/1994 |
| From: | Buchholz R GENERAL ELECTRIC CO. |
| To: | Borchardt R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| MFN-131-94, NUDOCS 9410240239 | |
| Download: ML20076H875 (2) | |
Text
i GE Nuclear Energy P. W. Mamoit, Mger GeneralEb tnc Company AdvancedPlant Technobgies 175 Curtner Genue, MC 781 San Jose, CA 95125-1014 406 92569e :1(phone) 408 925-1193(tacstnile)
October 13,19tM MFN No.131-94 Docket STN 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention:
Richard W. Borchardt, Director Standardization Project Directorate
Subject:
Submittal of Changes to Amendment I to the "SBWR Standard Safety Analysis Report",25A5113 Rev. A
Reference:
Submittal of Amendment 1 to the "SBWR Standard Safety Analysis Report", Letter from R. H. Buchholz to R. W. Borchardt, dated September 23,1994.
This letter transmits changes to Amendment 1 to the "SBWR Standard Safety Analysis Report", 25A5113 Resision A, previously transmitted by the reference letter. These changes include the addition of Section 4.2, a tab to place in front of new Section 18.8,17 x 22 drawings, and a revised set ofinstructions for placing the Amendment into the SSAR.
Sincerely, bbuckAse%
m R. H. Buchholz, Acting Manager Advanced Plant Technologies
Attachment:
Changes to Amendment 1 to the "SBWR Standard Safety Analysis Report", 25A5113 Revision A cc:
P. A. Bochnert (ACRS)
F. W. Hasselberg (NRC)
A M. Malloy (NRC)
P
'(,
- W 9430240239 9410D
\\%
DR ADOCK 0520
4 UNITED STATES OF AAir:RICA l
NUCLEAR REGULATORY COMMISSION In the N1atter of:
)
l General Electric Company
)
i l
SBWR Standard Plant Design
)
DOCKET No. STN-52-004 l
Final Design Approval and Design
)
Certification Application
)
i APPLICATION FOR REVIEW OF "SBWR STANDARD SAFETY ANALYSIS REPORT" FOR FINAL DESIGN APPROVAL AND DESIGN CERTIFICATION l
Steven R. Specker, being duly sworn, states that he is Vice President and General Afanager, GE Nuclear Energy, General Electric Company, that he is l
authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; that all statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
GENERAL ELECTRIC COMPANY 1
I By:
l 9
l l
Steven R. Specker Vice President and General Manager GE Nuclear Energy Subscribed and sworn tg l
before me on this 7
day of September 1994.
ecrearr hhium?
<bA$
Notary Public p -
MARY L KENDAtt z ? {q i,,
j~
COMM. # 987864 z
3
' Notory Puc.ic - Cokfornia
$ANTA CLARA COUNTY F
~
j My Comm, Expres MAR 26.1997 )
.__