Category:CORRESPONDENCE-LETTERS
MONTHYEARML20248E1991998-05-28028 May 1998 Informs That Staff Has Identified Six Ltrs (Enclosed) to GE Re Potential Proprietary Disclosure.Ltrs Specifically Requested That GE Review Encl to Determine If Contained GE Proprietary Info.Encl Withheld ML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20247M6911998-05-18018 May 1998 Forwards Staff Review of Rept, Giraffe Sbwr Sys Interactions Test Rept, (NEDC-3254OP,Revision-0).Informs That Review of Sbwr Was Terminated in 1996 ML20247M7021998-05-18018 May 1998 Forwards Staff Review of General Electric Panthers - IC Test Rept (Siet 00458RP95).Informs That Sbwr Was Terminated in 1996 ML20134L3181996-11-19019 November 1996 Advises That GE Pathers/Ic ATRs Submitted w/951025 Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,based on Review of Listed Reasons for Maintaining Info as Proprietary ML20134F3861996-11-0101 November 1996 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 99900403/96-01 on 960708 ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20129C2881996-10-21021 October 1996 Informs of Review & Determination That Info Identified in Apparent Test Results Contain Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20128H4971996-10-0707 October 1996 Advises That GE Giraffe Sys Apparent Test Results Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960321 Request ML20128H5141996-10-0707 October 1996 Informs That Licensee 951212 Request That GE Panda steady- State Tests S1 Through S6 Pcc Performance Apparent Test Results,Rev 1 Be Withheld from Public Disclosure,Per 10CFR2.790,granted ML20128H5301996-10-0707 October 1996 Informs That Licensee 960314 Request to Withhold GE Girafee Helium Tests Apparent Test Results Repts & Data Transmittal for Giraffe Helium Tests H3 & H4 from Public Disclosure,Per 10CFR2.790,granted ML20129F5031996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Post-Test Calculations of Panda Pcc Steady-State Test, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129F5061996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Panther/Ic Apparent Test Results Phase 3, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129E8831996-10-0202 October 1996 Informs That GE Panda Steady-State Tests Data Transmittal Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790 (b)(5) & Section 103(b) of AEA of 1954,as Amended ML20129F6181996-10-0202 October 1996 Advises That Giraffe Sbwr Sys Interactions Test Rept Will Be Withheld from Public Disclosure Ref 10CFR2.790, Per 960617 Request ML20129F6341996-10-0202 October 1996 Advises That Panthers/Ic Atrs Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960222 Request ML20129G5841996-10-0202 October 1996 Advises That,Data Transmittal for Giraffe Helium Tests H1 & H2,as Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20129E6361996-10-0101 October 1996 Advises That GE Panda Transient Integral Test Data Transmittal Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960816 Request ML20129E8681996-10-0101 October 1996 Informs That Licensee 960222 Request to Withhold GE Panda Steady-State Tests S10-S13 Performance from Public Disclosure Per 10CFR2.790.Request Denied Because No Affidavit Was Submitted ML20129G6311996-10-0101 October 1996 Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20248F3891996-07-31031 July 1996 Forwards Rept on Staff Evaluation of GE Tracg Model Description,Rev 1,related to Containment Area,In Response to ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld 1998-05-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20097D1631996-02-0101 February 1996 Advises That Charges on TACs M84204 & M84214 Appear Inappropriate as Review of Sbwr Ssar Chapters 4 & 14 Were Stopped Months Before 951001-951223 Period & No Chapter 4 RAIs Have Been Received ML20117P2221996-01-27027 January 1996 Forwards Final Rept Thermal Properties of Concrete at High Temps, ML20096G5611996-01-18018 January 1996 Requests Withdrawal of Proprietary Version of TRACG02V User'S Manual & Associated Affidavit ML20096C0641996-01-0909 January 1996 Forwards Proprietary Responses to RAIs Re Sbwr License TR NEDE-32177P (Tracg Qualification).Responses Withheld Per 10CFR2.790 ML20096B8531996-01-0909 January 1996 Forwards Proprietary Info Re Sbwr - Panthers/Ic Apparent Test Results,Per .Encl Withheld (Ref 10CFR2.790) ML20095J5441995-12-18018 December 1995 Forwards Rev 0 to NEDO-32288, Scaling of Sbwr Related Tests ML20095G8551995-12-13013 December 1995 Requests Removal of Westinghouse TR WCAP-14416 from Sbwr Docket Stn 52-004 ML20094Q7271995-11-29029 November 1995 Forwards Proprietary GE Handouts During Meeting for 951128 & 29 ACRS Thermal & Hydraulic Subcommittee in San Jose,Ca. Handouts Withheld Per 10CFR2.790 ML20094Q6061995-11-29029 November 1995 Forwards Nonproprietary Handouts Presented by GE During 951128 & 29 ACRS Thermal Hydraulic Subcommittee Meeting in San Jose,Ca ML20100E1251995-11-10010 November 1995 Forwards Rev 1 to NEDO-32391,Suppl 1, Sbwr Test & Analysis Program Description Suppl 1 - Discussion of Pirt Parameters ML20094Q0061995-11-0808 November 1995 Forwards non-proprietary Version of RAI on Sbwr Design, ML20094P1841995-11-0707 November 1995 Responds to NRC Re GE 950216 Request for Exemption of Sbwr Drywell to Wetwell Vacuum Breaker from Single Failure Criteria ML20094E0411995-11-0101 November 1995 Forwards Nonproprietary Version of Tracg Containment Model Road Map as Agreed to at 950821 & 22 Meeting ML20095B0981995-10-31031 October 1995 Addresses NRC Unresolved Items Documented in Insp Rept 99900404/95-02 ML20094D0651995-10-31031 October 1995 Forwards Proprietary Response to RAI Re Simplified BWR, Including Questions Q901.75-78,81,82,84-88,92,95-102,105- 127,132-143,146-150 & 152-158.Encl Withheld (Ref 10CFR2.790) ML20094E8521995-10-27027 October 1995 Forwards Nonproprietary Version of Ref 2,in Response to NRC Ref 1 Request Re Sbwr Design, ML20094D0361995-10-26026 October 1995 Forwards Nonproprietary Response to Rea on Licensing Topical Repts NEDE-32176P,NEDE-32177P & NEDE-32178P ML20094E7691995-10-26026 October 1995 Informs That First & Third Noted Handouts Should Be Reclassified as non-proprietary.Second & Fourth Noted Handouts Should Continue to Be Classified as Proprietary ML20095L7781995-10-25025 October 1995 Forwards Proprietary Panthers/Ic Apparent Test Results, Phase 1.Encl Withheld 1998-05-20
[Table view] |
Text
, l!P.15'94 4:48Pd GE NUCLEAR BLDG J E9892 P.1/16 5
0 --
9mpr
- g c. , = = ,
.-c - n~g;;gggpm h5 75://sNM.
Afwindr M/q, XH76
/pir41=sfe -
faAbrowa sur 44ete,e afsaasu nsawgm%tWm mves/
Me +/co/M GE& yd.d*/
te dadoi~de C/ M Ar.AvA:y M r**
Awspwvylew* red 4 ameme rL/**J pawn pwi%u/6o/'Me c1ms/sM &pp== ud# -#r y>*s/4 W*
my */de 71 da dA Pr*ym*" A sewn d,ad eprreses #e v>6-Ak so;N reformet -A Ahf4-) hr P/
7/ese &Aa4 sww sod 4 Ad Mc Z d yee s) .r/p v.
Air por krArmmA%
W '
G L e A m t ,m )
in A
"'ess a n868 04 .
PDR
c . .
l .
SEP.1594 4:49PM GE WCLEAR BLDG J E9892 P.2/16 Page1of15 GE NUCLEAR ENERGY ADVANCED REACTOR PROGRAMS SANJOSE, CALIFORNIA Rapidfax Numbers: (408) 925-1687 or (408) 9251195 RAPIDFAX TRANSMITTAL Date: May IS,1994 i Ltr. No. PEN-9+040-FAX ATTENTION: Richard McIntyre cc: P. W. Marriott Vendor Inspection Branch T. R. McIntyre !
FAXt. (301)504 2968 j i
Subject:
GIRAFFE Trio Renort and %hiba OA Proaram Per your request, here is my trip report to Toshiba's Nuclear Engineering l Laboratory at Kawasaki and the Toshiba QA Program for SBWR. !
Best regards, p P. E. Novak Quality Manager Mall Code 754, Telephone (408) 9254197
SEP.15'9{ 4:49PM GE NUCLEAP. BLDG J lt9 92 P 3/16 l
8 .,__,_,,
Easvee Amieseah$ersom%r Menneer INCatmAve, ht'C180 Ahenedneesterfropear SenJose.CsopMe NIH Tef:44N)sE41si, ForInllsE 11st '
April 28,1994 l P. W. Marriott, Program Manager )
SBWR Design and Certi6 cation Program j
Subject:
Review OA " -.wa Armlieri to GIRAFFE Tests - Trin Rennet-
-l Sil]LVARY !
P. E. Novak, Advanced Reactor Programs Quality Manager for the SBWR )'
Design and Cerdlicadon Program, visited the Nuclear Engineering Laboratory of Toshiba Corporation in Kawasaki, Japan, on the afternoon of March 14,1994. The purpose of this visit was to review the GINAFFE testa j conducted by Toshiba over the last four years for compliance with Toshiba's l
" Quality Assurance Program for Simplified Boiling Water Reactor". AS50092, i Rev.0, dated December 16,1993. S. Yokobori, W. Mirumschi, H. Tonegawa, T. i Kurita, T. Tobimatsu, K. Arai, and K. Watanabe, all of the Toshiba Corporation, were contacted during the vielt.
The results of this review and the ongite witness and reports of the performance of the GIRAFFE tests by Karen Vierow, a GE engineer, affirms that the GIRAFFE tests were conducted in a high quality, disciplined, .<
documented, and controlled manner. It in enneluded that the GIRAFFE testing pr was performed in a manner that was generally consistent with the appH le portions of the QA program cited above, cc: Deparunent of Energy (9)
- 3. A. Hucik P. F. Billig T. R. McIntyre File 15.4 l
1 l
l l
l.
SEP,15'94 '4:50PM -GE NUCLEAR Bl.DG J E9892 P.4/16 .
]
I Trin Renrire P. E. Novak Anril 28.1994 COMPRDENSIVE KKPORT P. E. Novak met with S. Yokohori, W. Mizumachi, H. Tonegawa, T. Kurita, T.
Tobimatsu, K. Arai, and K. Watanabe of Toshiba at Toshiba's Nuclear Enfeering Laboratory in Kawasaki, Japan, on the afternoon of 5/14/94 to renew the QA pmgrun applied to th GIRAFFE testa conducted over the last four years. The GIRAFFE testin[ p'r was reviewed for compliance with the applicable portions of Toshisas ality Assurance Program for Simplified Boiling Water Reactor", AS. 2, Rev.0, dated December 16,1993. ,
Comments relevant to specific sections of the program are noted below. I Secdon 2.4.1 Self audiu were held annually in November over at least the last 4 years to evaluate the quality of work produced by the Nuclear Engineering Laboratory.
These audits were led by the laboratory's General Manager, Dr. Miyazawa, and i included senior staff from each major laboratory technology group.
Section 2.4.2 About 80 meetings were held over the lut 4 years between laboratory, engineering, and projects personnel to assure that the GIRAFFE test designs and test performance met engineering and project requirements. The last meedng was held 1/27/94 and had $ laboratory technology group,4 engineering department, and 1 project persons in attendance.
Section 3 Generally, documents and drawings are kept 10 years and then microfilmed for permanent storage.
Section 4 The initial specification of the test procedures for GIRAFFE were issued 2/10/89. MMor revisions were made and issued 5/26/89 and 7/4/89 to reflect engineering and project comments. Drawings were verified by design review and signed by middle and upper management.
Section 5 Equipment from outside vendors was procured according to procedure GG S01. It was most recently revised 12/1/93. QC inspected equipment arriving at the laboratory for packaging demage, visual. damage, and quantity of items.
Other specialised attributes were evaluated by the experimenters.
Toshiba independently veriEed the volumes of equipment and components supplied by vendors and used in the test facility by filling and draining measured amounts of water.
Section 6 Laboratory instruments were calibrated annually and stickers affixed to indicate the next date of calibration. Calibrations by Toshiba were traceable to national standards and calibration records were retained. Special electronic data reduction equipment used for GIRAFFE was calibrated periodically. This 2 .
.- . _ ~ - . . - - .,
SEP.15'94 ~ 4:51PM GE WCLEAP, BLDG J k9892:P.5/16
)
- Trin nanart P. L Nomk Anril 98.1904 )
calibration consisted of applying known and constant voltages to the equipment input and verifying the linearity of the output. -
he Bowmeter on the GIRAFFE program was supplied by a Toshiba subsidiary company. The manufacturer's certification of calibration was accepted without additional vedBcation at the laboratory. Thermocou sles were procured commercially with manufacturer's certifications anc, not tested.
I Pressure vessels were inspected and pressure tested annually. Test personnel !
were certified by national test to perform high temperature and pressure !
testing. GIRAFFE had two dedicated technicians trained and certiBed for this !
high pressure and high temperature testing. -l Test plans were prepared and approved. Depending on the test objectives, the apprcwals included Toshiba, the.lointJapanese unl des, and/or GE.
Test procedures included a pretest checklist and an initial conditions check list. There was much evidence of planning tests and defining initial condidons and test configuration by group discussions and reviews. Many preop tesdng procedures and logs were shown as well as minutes ofjoint i GE/Toshiba meedugs to plan tests.
l Log sheets documented initial conditions and strip chart tecorders showed system changes with time. Test durations were from 8 to 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. _ Data was electronically sampled every second since initial tests indicated that sigrdficant data changes occurred only at times greater than one minute.
Facility drawings and records of ae built conditicr., were presented and examined. The repentability ofimportant tenu was checked monthly during pedods of active testing.
Section 7
'three condidons were identified by Toshiba during the test program that required correction or improvement. 1) A leak was found in a heat transfer )
tube. It was replaced. 2) Microheater control was found necessary to control heat loss when adiabadc conditions were simulated. 3) Heavy rain affected the heat balance arovided by the microheaters to the extent that certain tests had to be repeated he results of this review and the on site witness and reports of the performance of the GIRAFFE tests by Karen Vierow, a GE engineer, afErms that the GIRAFFE tests were conducted in a high uality, disciplined documented, and controlled manner. It is conclu ed that the GIRAFFE tesdng program was performed in a manner that was generally consistent with licable portions of Toshiba's " Quality Assurance Program for Simplified Water Reactor". AS 50092. Rev.0, dated December 16,1995.
f.
S ,
, r
. SEP.15.'94 4:52PM GE NUCLEAP. BLDG J k.9892 P,6/16_
Trin Renort P. E. Novak April 28.1994 APPF.NDIX Itinerary The afternoon of 14 March 1994 Nuclear Engineering Laboratory Toshiba Corporation 41, Ukishima<ho, Kawasaki-ku.
Kawasaki 210, Japan Pmsons Contacted (Toshiba)
S. Yokobod,Engineering W. Mizumachi, Senior Specialist, Core Manager, Plant and Fuel and System Technology Group Dep't.
Planning H. Tonegawa, Assistant Senior Manager, LWR Project Engineenng Dep't.
T. Kurita, Engineer Core and Fuel Technology Group T. Tobimatsu, Specialist, Core and Fuel Technology Croup K. Arai, Toshiba K. Watanabe, Section Manager, QA Dep't.
1 Kev Documents Arnuired None
)
l l
l 4