ML20078Q064

From kanterella
Jump to navigation Jump to search
Provides Addl Info to Suppl Three Ref Ltrs Responding to RAI Re Sbwr Panthers-PCC Test Facility.W/One Oversize Proprietary Drawing
ML20078Q064
Person / Time
Site: 05200004
Issue date: 12/12/1994
From: Marriott P
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML19311B630 List:
References
MFN-156-94, NUDOCS 9412210146
Download: ML20078Q064 (5)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

^

GENuclear Energy P. W. Mamott, Manager GeneralElectnc Company ,

1 AdvancodP!mt Tedrebges 17S Curtrer Amnue, MC 781 San Jose, CA 95125-1014 <

4089254948(phone) 408925-1193(tacsanile)

December 12,1994 NiFN No.15494 Docket STN 524)04 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Richard W. Ilorchardt, Director Standardization Project Directorate

Subject:

NRC Requests for. Additional Information (RAIs) on the Simplified Boiling Water Reactor (SEWR) Design

References:

1) hiFN 167-93, NRC Requests for Additional Information (RAls) on the SIlWR Design, Letter from J. F. Quirk toJ. N Wilson dated October 19,1993.
2) SIFN 08494, NRC Requests for Additional Information (RAIs) on the SIlWR Design, Letter from P. W. Niarriott to R. W. Borchardt, datedJune 30,1994.
3) AIFN 098-94, NRC Requests for Additional Information (RAls) on the SIlWR Design, Letter from P. W. hiarriott to R. W. Borchardt, dated August 16,1994.

This letter provides additional infbrmation to supplement the three reference l letters' responses to Requests for Additional Information regarding the SBWR PANTIlERS-PCC test Facility. Specifically, GE is submitting Attachment 1 to this letter which provides supplemental information regarding the response to RAI 950.23 Sincerely, O, '

I l

P. W. rriott, Nianager h Advanced Plant Technologies Attachment 1, " Responses to NRC RAls" cc: P. A. Bochnert (w/l copy of Attachment 1)

F. W. Hasselberg (w/l copy of Attachment 1) i J.11. Wilson (w/2 copies of Attachment 1) 9412210146 941212 PDR ADOCK 05200004 p s" , <

L,{I i

3

,A y - PDR g-V

(,--

RAI Number: 950.23 ,

_ Question:

Provide the test plan and final hardware configuration for the PANTHERS facility.

GE Supplemental Response:

This response supplements the earlier responses to this RAI; a) MFN 167-93, October 19,1993, ,

b) MFN 08Cr94, June 30,1994, c) MFN 098-94, August 16,1994.

Attached are the following SIET drawings of the PANTHERS-PCC test facility: ;

Drawine No. Err Title 24.02.31 1 VENT TANK AIR STEAM 8" DISCHARGING LINE I 00209DD93 4 PANTHERS-PCC TEST FACILITY P&ID The P&lD supersedes Rnision 3 sent in (c) above.

i

r l .. ,

O Indice DESCRIZIONE 01 Tubo 8" SCH.40 02 Curva e8" SCH.40 LR 90*

03 Orifizio FE06 04 VP F064 Parcol c8" ANSI 1500 05 VM . F065 68" ANSI 150 l

l i, )

4 G'sg y eN a

ar , A

~# .

y 1

s

@ ~#

> t

\e ,

s' O \ # -

03

[' I e/ 4 N

+1 b h%

%o /

f l so s/

ce i l

4 ee

~

O x A'  %

+e/ - N

\

02 *

  1. I '

,& 4

_j ,

c l^ '

02

+e /

,# 01 x% .

  • N  !

l ANSTEC

[

s 's @ ' APERTURE  !

t7sOARD Aho Atrih ble On Aperiur t ' nr.1 f l

i N/22/0/Y(a -  !

i 1 11/11/94 AS BUILT gg. c, w4 0 20/7/94 EMISSIONE @r < p- fa , r  ;

Dissn. Controll..Approv.

In6ce Deto Modifiche ooe. n.

S -..q d g

'~_J Placenze Panthers-PCC : Vent Tank air Italy steam G8" discharging line .

+

Scalo Diseano n. Foolio di

~ ~-

O24.02.31

-