Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML21179A04721 June 20214 to Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
High Radiation Area
Safeguards Contingency Plan
Fire Protection Program
Power change
ML21196A00815 July 2021Redacted - Dresden, Updated Final Safety Analysis Report, Chapter 2, Site CharacteristicsSafe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Annual Radiological Environmental Operating Report
Excess Flow Check Valve
Earthquake
GOTHIC
ML21196A00930 June 2009Redacted - Dresden, Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML24122C6297 May 2024UFSAR Chapter 02, Site Characteristics RedactedSafe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Annual Radiological Environmental Operating Report
Excess Flow Check Valve
Earthquake
GOTHIC
ML24122C6307 May 2024UFSAR Chapter 12, Radiation Protection RedactedHigh Radiation Area
Feedwater Heater
Power Uprate
RS-02-183, Attachment B, Proposed Revisions to the Updated Final Safety Analysis Report28 October 2002Attachment B, Proposed Revisions to the Updated Final Safety Analysis ReportStress corrosion cracking
Water hammer
RS-10-098, Submittal of Revision 5 to Defueled Safety Analysis Report21 June 2010Submittal of Revision 5 to Defueled Safety Analysis ReportSafe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Intergranular Stress Corrosion Cracking
Process Control Program
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
Overspeed trip
Water hammer
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Appendix a29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Appendix a
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, Introduction29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, IntroductionSafe Shutdown
Tornado Missile
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Turbine Missile
Pressure Boundary Leakage
Backfit
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion System29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion SystemHydrostatic
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1)29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1)High Radiation Area
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 13.0, Conduct of Operations Tables29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 13.0, Conduct of Operations TablesHigh Radiation Area
Safeguards Contingency Plan
Fire Protection Program
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test Program29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test ProgramShutdown Margin
Hydrostatic
Feedwater Heater
Scram Discharge Volume
Overspeed trip
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 15.0, Accident and Transient Analysis29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 15.0, Accident and Transient Analysis
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 16.0, Technical Specifications29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 16.0, Technical Specifications
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 17.0, Quality Assurance29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 17.0, Quality Assurance
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 4.0, Reactor29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 4.0, ReactorStress corrosion cracking
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected Systems29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected SystemsShutdown Margin
Weld Overlay
Hydrostatic
Nondestructive Examination
Intergranular Stress Corrosion Cracking
Liquid penetrant
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety Features29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety FeaturesSafe Shutdown
Loop seal
Coatings
Stress corrosion cracking
Power Uprate
Potassium iodide
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and Controls29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and ControlsSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Scram Discharge Volume
Feedwater Controller Failure
Earthquake
Commercial Grade
Fuel cladding
Power change
Coast down
Overspeed trip
Loss of condenser vacuum
Water hammer
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 8.0, Electrical Power29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 8.0, Electrical PowerSafe Shutdown
Earthquake
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary Systems29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary SystemsUltimate heat sink
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, List of Affected Pages29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, List of Affected Pages
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases29 June 2011Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Intergranular Stress Corrosion Cracking
Feedwater Controller Failure
Excess Flow Check Valve
Spiral reload
Overtravel
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Coast down
Unidentified leakage
Power Uprate
Overspeed trip
Subsequent actuation
Operational leakage
Loss of condenser vacuum
Water hammer
RS-11-100, Updated Final Safety Analysis Report (Ufsar), Revision 9, Affected Page List - Technical Specification Bases, Revision 5429 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Affected Page List - Technical Specification Bases, Revision 54
RS-12-107, Defueled Safety Analysis Report Update, Revision 621 June 2012Defueled Safety Analysis Report Update, Revision 6Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Intergranular Stress Corrosion Cracking
Process Control Program
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
Overspeed trip
Water hammer
RS-16-117, Submittal of Defueled Safety Analysis Report Update, Revision 820 June 2016Submittal of Defueled Safety Analysis Report Update, Revision 8Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Intergranular Stress Corrosion Cracking
Process Control Program
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
Overspeed trip
Water hammer
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of Plant21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of PlantSafe Shutdown
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Tornado Generated Missile
Turbine Missile
Pressure Boundary Leakage
Backfit
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 05, Reactor Coolant System and Connected Systems21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 05, Reactor Coolant System and Connected Systems
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemHydrostatic
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramShutdown Margin
Hydrostatic
Feedwater Heater
Scram Discharge Volume
Overspeed trip
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, List of Effective Pages Pages21 June 2017Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, List of Effective Pages Pages
RS-17-082, Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 2121 June 2017Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21Safe Shutdown
Hydrostatic
Incorporated by reference
Aging Management
Surveillance Frequency Control Program
License Renewal
RS-17-082, Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics21 June 2017Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site CharacteristicsSafe Shutdown
Safe Shutdown Earthquake
Earthquake
RS-19-067, Redacted - Dresden Nuclear Power Station, Units 1, 2 and 3, Updated Final Safety Analysis Report, Chapter 12, Figures21 June 2019Redacted - Dresden Nuclear Power Station, Units 1, 2 and 3, Updated Final Safety Analysis Report, Chapter 12, FiguresSafe Shutdown
Boric Acid
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Annual Radiological Environmental Operating Report
Excess Flow Check Valve
Earthquake
GOTHIC