Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000280/201240527 July 2012IR 05000280-12-405 and 05000281-12-405, 7/25/2012, Surry Power Station, Cover Letter - Enclosure Removed
IR 05000280/20125022 November 2012IR 05000280-12-004, 05000281-12-004, 05000280-12-502, and 05000281-12-502, on 07/01/2012 - 09/30/2012, Surry Power Station, Units 1 & 2: Routine Integrated Inspection Report, Identification and Resolution of Problems, Other ActivitiesSafe Shutdown
Mission time
Fire Barrier
Internal Flooding
Enforcement Discretion
Reserve Station Service Transformer
B.5.b
Fukushima Dai-Ichi
Significance Determination Process
Operability Determination
Earthquake
Maintenance Rule Program
Fire Protection Program
Siren
IR 05000280/20130014 March 2014Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280/2013001 and 05000281/2013001
IR 05000280/201300230 April 2013IR 05000280-13-002, 05000281-13-002, 01/01/2013 - 03/31/2013, Surry Power Station, Units 1 and 2, Event Follow-upSafe Shutdown
High Radiation Area
Fire Barrier
Reserve Station Service Transformer
Temporary Modification
B.5.b
Significance Determination Process
Job Performance Measure
Design basis earthquake
Process Control Program
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000280/201300330 July 2013IR 05000281-13-003, 04/01/2013 - 06/30/2013, Surry Power Station, Unit 1 and 2, NRC Integrated Inspection ReportSafe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Maintenance Rule Program
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000280/201300429 October 2013IR 05000280-13-004, 05000281-13-004; on 07/01/2013-09/30/2013004; Surry Power Station, Units 1 and 2: Routine Integrated Inspection ReportSafe Shutdown
Fire Barrier
Temporary Modification
Functionality Assessment
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000280/201300510 February 2014IR 05000280-13-005, 05000281-13-005; 10/01/2013 - 12/31/2013; Surry Power Station, Units 1 and 2: Plant Modifications; Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and TransportationSafe Shutdown
Boric Acid
High winds
High Radiation Area
Non-Destructive Examination
Fire Barrier
Tornado Missile
Reserve Station Service Transformer
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Tornado Generated Missile
Significance Determination Process
Tornado Missile Protection
Process Control Program
Operability Determination
Spent Fuel Pool Instrumentation
Maintenance Rule Program
Fuel cladding
EVT-1
Liquid penetrant
Fire Protection Program
GOTHIC
IR 05000280/201300720 August 2013IR 05000280-13-007, 05000281-13-007; 07/8/2013 - 07/25/2013; Surry Power Station, Units 1 and 2; Biennial Inspection of Problem Identification and Resolution Program
IR 05000280/201340326 April 2013IR 05000280-13-403 and 05000281-13-403, 03/18/2013 - 03/21/2013, Surry Power Station, Units 1 and 2Significance Determination Process
Affidavit
IR 05000280/201340520 November 2013IR 05000280-13-405, 05000281-13-405, on 10/24/2013, Surry Power Station - NRC Security InspectionAffidavit
IR 05000280/20135038 August 2013IR 0500028-13-503 and 05000281-13-503; 07/15/2013 - 07/19/2013; Surry Power Station, Units 1 and 2; Exercise and Baseline Inspection
IR 05000280/20140014 March 2015Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001
IR 05000280/20140021 May 2014IR 05000280-14-002, 05000281-14-002, on 01/01/2014 - 03/31/2014, Surry Power Station, Units 1 and 2: Operability Determinations and Functionality AssessmentsSafe Shutdown
Packing leak
Fire Barrier
Internal Flooding
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000280/201400330 July 2014IR 05000280-14-003, 05000281-14-003 on 04/01/2014 - 06/30/2014, Surry Power Station Units 1 and 2: Maintenance EffectivenessSafe Shutdown
Boric Acid
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Reserve Station Service Transformer
Locked High Radiation Area
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Unidentified leakage
IR 05000280/20140046 November 2014IR 05000280/2014004, 05000281/2014004; on 07/01/2014 - 09/30/2014; Surry Power Station, Units 1 and 2: Routine Integrated Inspection ReportSafe Shutdown
Boric Acid
Fire Barrier
Reserve Station Service Transformer
Temporary Modification
Operability Determination
Maintenance Rule Program
Fire Protection Program
Siren
IR 05000280/20140052 February 2015IR 05000280/2014005, 05000281/2014005; on 10/01/2014 - 12/31/2014; Surry Power Station, Units 1 and 2, Followup of Events and Notices of Enforcement DiscretionSafe Shutdown
Ultimate heat sink
Fire Barrier
Internal Flooding
Enforcement Discretion
Reserve Station Service Transformer
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Flow Induced Vibration
Unidentified leakage
IR 05000280/20140062 September 2014Mid-Cycle Letter for Surry, Units 1 & 2, NRC Assessment Report 05000280/2014006, 05000281/2014006Spent Fuel Pool Instrumentation
IR 05000280/201400710 November 2014IR 05000280/2014007 and 05000281/2014007; on 08/18/2014 - 09/26/2014; Surry Power Station, Units 1 and 2; Component Design Bases InspectionUltimate heat sink
Probabilistic Risk Assessment
Reserve Station Service Transformer
Significance Determination Process
Large early release frequency
IR 05000280/20143014 September 2014Er 05000280/2014301 and 05000281/2014301; Operating Test July 21 - 29, 2014 & Written Exam August 5, 2014; Surry Power Station, Units 1 and 2; Operator License Examinations
IR 05000280/201440231 July 2014IR 05000280-14-402 & 05000281-14-402, February 20, 2014, Errata Letter for Surry Power Station, NRC Temporary Instruction 2515/186
IR 05000280/201440512 May 2014IR 05000280-14-405, 05000281-14-405, on 03/28/2014, Surry Power Station Units 1 And 2 NRC Temporary Instruction 2201/004, "Inspection Of Implementation Of Interim Cyber Security Milestones 1-7" Inspection ReportEnforcement Discretion
Cyber Security
Affidavit
IR 05000280/201440613 January 2014IR 05000280-14-406 and 05000281-14-406 (Office Of Investigations Report Number 2-2013-010), Surry Power Station
IR 05000280/20150017 May 2015IR 05000280/2015001 and 05000281/2015001, on 01/01/2015-03/31/2015; Surry Power Station, Units 1 and 2: Maintenance EffectivenessSafe Shutdown
Fire Barrier
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Through-Wall Leak
Fire Protection Program
Power change
IR 05000280/20150026 August 2015IR 05000280/2015002, 05000281/2015002; on 04/01/2015 - 06/30/2015; Surry Power Station, Units 1 and 2: Inservice Inspection Activities and Maintenance EffectivenessSafe Shutdown
Boric Acid
Packing leak
Non-Destructive Examination
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Temporary Modification
Incorporated by reference
FLEX
Significance Determination Process
Operability Determination
Moisture barrier
Maintenance Rule Program
Through-Wall Leak
Through Wall Leak
Fire Protection Program
IR 05000280/201500312 November 2015IR 05000280/2015003, 05000281/2015003; on 07/01/2015 - 09/30/2015; Surry Power Station, Units 1 and 2: Maintenance Effectiveness and Other ActivitiesSafe Shutdown
High winds
Fire Barrier
Enforcement Discretion
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000280/20150042 February 2016NRC Integrated Inspection Report 05000280/2015004 and 05000281/2015004, October 1, 2015 Through December 31, 2015Safe Shutdown
Boric Acid
High winds
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Internal Flooding
Enforcement Discretion
VT-2
Significance Determination Process
Foreign Material Exclusion
Process Control Program
Operability Determination
Maintenance Rule Program
Biofouling
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Scaffolding
Unidentified leakage
Unidentified leak
IR 05000280/20150051 September 2015Mid-Cycle Letter for Surry Power Station Units 1 and 2 - NRC Assessment Report 05000280/2015005 and 05000281/2015005Spent Fuel Pool Instrumentation
IR 05000280/201500730 October 2015IR 05000280/2015007 and 05000281/2015007; on 9/14/2015 - 10/1/2015; Surry Power Station, Units 1 and 2; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
IR 05000280/20150086 July 2015IR 05000280/2015008, 05000281/2015008; on March 09-13, 2015 and 23-27, 2015; Surry Power Station, Units 1 and 2; Triennial Fire Protection InspectionHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Incorporated by reference
B.5.b
Significance Determination Process
Thermoset
Operability Determination
Time Critical Operator Action
Fire Protection Program
Power Uprate
IR 05000280/201500926 August 2015IR 05000280/2015009, 05000281/2015009; 07/13-17/2015 and 07/27-30/2015; Surry Power Station, Units 1 and 2; Biennial Inspection of Problem Identification and Resolution Program
IR 05000280/20152015 November 2015IR 05000280/2015201 and 05000281/2015201, on 06/26/2015, Surry Power Station, Unit Nos. 1 and 2, NRC Security InspectionAffidavit
IR 05000280/201530110 November 2015Er 05000280/2015301, 05000281/2015301; Operating Test September 21-24, 2015 & Written Exam September 29, 2015; Surry Power Station, Units 1 and 2; Operator License Examinations
IR 05000280/201540325 March 2015IR 05000280/2015403, 05000281/2015403, 07200002/2015401, and 07200055/2015401, February 27, 2015, Security InspectionAffidavit
IR 05000280/20154045 February 2016NRC Material Control and Accounting IR Report 05000280/2015404, 05000281/2015404
IR 05000280/201550212 March 2015IR 05000280/2015502; 05000281/2015502; on 2/9/2015 - 2/13/2015; Surry Power Station, Unit 1 and 2; Exercise and Baseline Inspection
IR 05000280/201600127 April 2016NRC Integrated Inspection Report 05000280/2016001 and 05000281/2016001, January 1, 2016 Through March 31, 2016Safe Shutdown
Mission time
Fire Barrier
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000280/201600219 July 2016NRC Integrated Inspection Report 05000280/2016002 and 05000281/2016002Safe Shutdown
Fire Barrier
Temporary Modification
FLEX
Operability Determination
Maintenance Rule Program
Fire Protection Program
Siren
IR 05000280/201600326 October 2016NRC Integrated Inspection Report 05000280/2016003 and 05000281/2016003Safe Shutdown
Fire Barrier
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Operator Manual Action
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000280/20160041 February 2017NRC Integrated Inspection Report 05000280/2016004 and 05000281/2016004Safe Shutdown
Boric Acid
High winds
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Enforcement Discretion
Reserve Station Service Transformer
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Biofouling
Fire Protection Program
Scaffolding
Unidentified leakage
IR 05000280/20160061 March 2017Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280/2016006 and 05000281/2016006Open Phase Condition
IR 05000280/201630110 November 2016NRC Examination Report 05000280/2016301 and 05000281/2016301Job Performance Measure
IR 05000280/201640328 April 2016U.S. Nuclear Regulatory Commission Security Inspection Report 05000280/2016403 and 05000281/2016403, April 8, 2016Affidavit
IR 05000280/201640426 October 2016U.S. Nuclear Regulatory Commission Security Inspection Report 05000280/2016404 and 05000281/2016404, (Cover Letter Only)Affidavit
IR 05000280/201640519 May 2016U.S. Nuclear Regulatory Commission Security Inspection Report 05000280/2016405 and 05000281/2016405 - OUO RemovedAffidavit
IR 05000280/201650124 January 2017U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report Nos. 05000280/2016501 and 05000281/2016501
IR 05000280/20170013 May 2017NRC Integrated Inspection Report 05000280/2017001 and 05000281/2017001Safe Shutdown
Boric Acid
High winds
Fire Barrier
Significance Determination Process
Job Performance Measure
Open Phase Condition
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
Downpower
IR 05000280/20170022 August 2017NRC Integrated Inspection Report 05000280/2017002 and 05000281/2017002Safe Shutdown
Boric Acid
High winds
High Radiation Area
Non-Destructive Examination
Fire Barrier
Internal Flooding
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Operability Determination
Reasonable doubt of operability
Maintenance Rule Program
Through-Wall Leak
Fire Protection Program
IR 05000280/20170031 November 2017Nuclear Regulatory Commission Integrated Inspection Report 05000280/2017003 and 05000281/2017003Safe Shutdown
Ultimate heat sink
Fire Barrier
Enforcement Discretion
Temporary Modification
Operability Determination
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
IR 05000280/20170041 February 2018NRC Integrated Inspection Report 05000280/2017004 and 05000281/2017004Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Pressure Boundary Leakage
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Unidentified leakage
Unidentified leak
IR 05000280/201700521 August 2017Updated Inspection Plan for Surry Power Station, Units 1 and 2 - Report 05000280/2017005 and 05000281/2017005License Renewal