IR 05000280/2013403

From kanterella
Jump to navigation Jump to search
IR 05000280-13-403 and 05000281-13-403, 03/18/2013 - 03/21/2013, Surry Power Station, Units 1 and 2
ML13116A230
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/26/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR-13-403
Download: ML13116A230 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ril 26, 2013

SUBJECT:

SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2013403 AND 05000281/2013403

Dear Mr. Heacock:

On March 21, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Surry Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were discussed on March 21, 2013, with Mr. D. Lawrence and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

One finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection. The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding did not have a cross-cutting aspect. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2, of the NRC Enforcement Policy because of the very low safety significance of the violation, and because it was entered into your corrective actions program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Surry Power Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-280, 50-281 License No.: DPR-32, DPR-37 Enclosure:

Inspection Report 05000280/2013403 and 05000281/2013403 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) ML13116A209 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRP/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 SIGNATURE /RA/ /RA via email/ /RA/ /RA/

NAME J. SHEHEE G. MCCOY J. GRAHAM B. DESAI DATE 4/16/2013 4/24/2013 4/26/2013 4/26/2013 4/ /2013 4/ /2013 4/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Gregory S. Haynes Manager, Nuclear Protection Services Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Letter to David from Binoy Desai dated April 26, 2013 SUBJECT: SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000280/2013 AND 05000281/2013 DISTRIBUTION:

RidsNrrPMSurry Resource C. Evans, RII EICS L. Douglas, RII EICS B. Westreich, NSIR R. Albert, NSIR, RII S. Coker, NSIR RII RIDSNRRDIRS OE Mail (email address if applicable)

surry@nrc.gov PUBLIC (OUO Removed)