Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
RS-03-094, Clinton Power Station, Unit 1, Oyster Creek Generating Station, Three Mile Island Nuclear Station, Unit 1, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization6 May 2003Clinton Power Station, Unit 1, Oyster Creek Generating Station, Three Mile Island Nuclear Station, Unit 1, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-095, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization6 May 2003Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-097, Units 1 & 2 - Response to RAI Technical Specifications Change Request - Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)27 May 2003Units 1 & 2 - Response to RAI Technical Specifications Change Request - Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)
RS-03-099, Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program16 May 2003Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection ProgramSafe Shutdown
Non-Destructive Examination
RS-03-100, Additional Information Supporting the Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30E15 May 2003Additional Information Supporting the Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30E
RS-03-101, Additional Information Regarding Inservice Inspection Program Relief Request I4R-0229 May 2003Additional Information Regarding Inservice Inspection Program Relief Request I4R-02Probabilistic Risk Assessment
Large early release frequency
RS-03-105, Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode16 May 2003Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.810 June 2003Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8Squib
RS-03-107, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1.20 June 2003Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1.
RS-03-110, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty3 June 2003Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty
RS-03-112, Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr).1 July 2003Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr).
RS-03-113, Reactor Coolant System Pressure & Temperature Limits6 June 2003Reactor Coolant System Pressure & Temperature Limits
RS-03-114, Registration of Use of Cask to Store Spent Fuel17 June 2003Registration of Use of Cask to Store Spent Fuel
RS-03-115, Additional Information Regarding Request for License Amendment Related to Heavy Loads Handling12 June 2003Additional Information Regarding Request for License Amendment Related to Heavy Loads HandlingCode Reconciliation
Earthquake
RS-03-116, Request for Technical Specifications Change Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.15 August 2003Request for Technical Specifications Change Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.Grab sample
Safe Shutdown Earthquake
Pressure Boundary Leakage
RS-03-121, Registration of Use of Cask to Store Spent Fuel17 June 2003Registration of Use of Cask to Store Spent Fuel
RS-03-122, Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.20 June 2003Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.Coatings
Large early release frequency
Exemption Request
RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation26 June 2003Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System InstrumentationReactor Vessel Water Level
Hydrostatic
Operating Basis Earthquake
Grace period
RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure19 June 2003Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureEarthquake
RS-03-127, Commitments for Resolution of Steam Dryer Degradation Issue27 June 2003Commitments for Resolution of Steam Dryer Degradation Issue
RS-03-128, Registration of Use of Cask to Store Spent Fuel1 July 2003Registration of Use of Cask to Store Spent Fuel
RS-03-131, Additional Information Supporting Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program7 July 2003Additional Information Supporting Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program
RS-03-135, Additional Information Supporting the Proposed Alternative Testing Requirements for Shutdown Service Water System Valves for the Second 10-Year Inservice Testing Program, Clinton Power Station, Unit 117 July 2003Additional Information Supporting the Proposed Alternative Testing Requirements for Shutdown Service Water System Valves for the Second 10-Year Inservice Testing Program, Clinton Power Station, Unit 1Stroke time
RS-03-136, Request to Withhold Information from Public Disclosure9 July 2003Request to Withhold Information from Public Disclosure
RS-03-137, Schedule for Completing Committed Actions Regarding Resolution of Steam Dryer Degradation Issue10 July 2003Schedule for Completing Committed Actions Regarding Resolution of Steam Dryer Degradation Issue
RS-03-140, Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power29 July 2003Request for Amendment to Technical Specifications Associated with Direct Current Electrical PowerSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Incorporated by reference
Battery sizing
RS-03-142, Additional Information Regarding Request for License Amendment for Pressure-Temperature Limits for Dresden Nuclear Power Station, Units 2 and 317 July 2003Additional Information Regarding Request for License Amendment for Pressure-Temperature Limits for Dresden Nuclear Power Station, Units 2 and 3Unanalyzed Condition
RS-03-144, Registration of Use of Cask to Store Spent Fuel22 July 2003Registration of Use of Cask to Store Spent Fuel
RS-03-145, Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program19 August 2003Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program
RS-03-146, Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors, Dated 06/09/036 August 2003Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors, Dated 06/09/03Boric Acid
Non-Destructive Examination
Coatings
Foreign Material Exclusion
RS-03-147, Additional Information Regarding the Request for License Amendment Related to Heavy Loads Handling25 July 2003Additional Information Regarding the Request for License Amendment Related to Heavy Loads HandlingTornado-Generated Missile
RS-03-149, Licensed Thermal Power Limit Verification15 August 2003Licensed Thermal Power Limit Verification
RS-03-152, Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-Duty25 July 2003Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-DutyEnforcement Discretion
RS-03-153, Transmittal of Dresden Nuclear Power Station, Units 2 and 3, Additional Information Regarding Request for License Amendment for Pressure Temperature Limits31 July 2003Transmittal of Dresden Nuclear Power Station, Units 2 and 3, Additional Information Regarding Request for License Amendment for Pressure Temperature Limits
RS-03-154, Exelon/Amergen 60-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.11 August 2003Exelon/Amergen 60-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.
RS-03-155, Additional Information Supporting Request for License Amendment Related to Application of Alternative Source Term4 August 2003Additional Information Supporting Request for License Amendment Related to Application of Alternative Source Term
RS-03-157, Additional Information Regarding Inservice Testing Program Relief Requests6 August 2003Additional Information Regarding Inservice Testing Program Relief RequestsStroke time
Post Accident Monitoring
RS-03-159, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure7 August 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureMet Tower
Nuclear Accident Reporting System
RS-03-160, Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.5 August 2003Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program.Probabilistic Risk Assessment
Large early release frequency
RS-03-161, Transmittal of General Electric Technical Assessment Regarding Quad Cities Nuclear Power Station Unit 2 Steam Dryer Failure11 August 2003Transmittal of General Electric Technical Assessment Regarding Quad Cities Nuclear Power Station Unit 2 Steam Dryer Failure
RS-03-163, Response to Request for Additional Information Regarding Fourth Interval Inservice Inspection Program Plan13 August 2003Response to Request for Additional Information Regarding Fourth Interval Inservice Inspection Program PlanProbabilistic Risk Assessment
VT-2
RS-03-164, Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations19 August 2003Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power OperationsProbabilistic Risk Assessment
Large early release frequency
RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing8 August 2003Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing
RS-03-166, Update to Information Supporting License Amendment Request to Permit Uprated Power Operation at Dresden, Units 2 & 3 and Quad Cities, Units 1 & 215 August 2003Update to Information Supporting License Amendment Request to Permit Uprated Power Operation at Dresden, Units 2 & 3 and Quad Cities, Units 1 & 2Flow Induced Vibration
RS-03-169, Additional Information Supporting the Request for Amendment to Technical Specifications 3.2.2, Minimum Critical Power Ratio (Mcpr), Addition of a New Surveillance Requirement28 August 2003Additional Information Supporting the Request for Amendment to Technical Specifications 3.2.2, Minimum Critical Power Ratio (Mcpr), Addition of a New Surveillance RequirementAnticipated operational occurrence
Minimum Critical Power Ratio
RS-03-170, Registration of First Use of Cask to Transport Spent Fuel28 August 2003Registration of First Use of Cask to Transport Spent Fuel
RS-03-171, Request for License Amendment Related to Heavy Loads Handling29 August 2003Request for License Amendment Related to Heavy Loads HandlingSafe Shutdown
Design basis earthquake
Control of Heavy Loads
RS-03-172, Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source Term15 September 2003Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source TermPressure Boundary Leakage
Recently irradiated fuel
RS-03-173, Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations.26 September 2003Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-03-174, Notification of Intent to Perform Analyses Using Vendor Safety Analysis Codes19 September 2003Notification of Intent to Perform Analyses Using Vendor Safety Analysis CodesShutdown Margin