RS-03-094, Clinton Power Station, Unit 1, Oyster Creek Generating Station, Three Mile Island Nuclear Station, Unit 1, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 6 May 2003 | Clinton Power Station, Unit 1, Oyster Creek Generating Station, Three Mile Island Nuclear Station, Unit 1, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-095, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 6 May 2003 | Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-097, Units 1 & 2 - Response to RAI Technical Specifications Change Request - Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) | 27 May 2003 | Units 1 & 2 - Response to RAI Technical Specifications Change Request - Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) | |
RS-03-099, Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program | 16 May 2003 | Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program | Safe Shutdown Non-Destructive Examination |
RS-03-100, Additional Information Supporting the Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30E | 15 May 2003 | Additional Information Supporting the Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30E | |
RS-03-101, Additional Information Regarding Inservice Inspection Program Relief Request I4R-02 | 29 May 2003 | Additional Information Regarding Inservice Inspection Program Relief Request I4R-02 | Probabilistic Risk Assessment Large early release frequency |
RS-03-105, Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | 16 May 2003 | Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | |
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8 | 10 June 2003 | Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8 | Squib |
RS-03-107, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1. | 20 June 2003 | Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1. | |
RS-03-110, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty | 3 June 2003 | Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty | |
RS-03-112, Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr). | 1 July 2003 | Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr). | |
RS-03-113, Reactor Coolant System Pressure & Temperature Limits | 6 June 2003 | Reactor Coolant System Pressure & Temperature Limits | |
RS-03-114, Registration of Use of Cask to Store Spent Fuel | 17 June 2003 | Registration of Use of Cask to Store Spent Fuel | |
RS-03-115, Additional Information Regarding Request for License Amendment Related to Heavy Loads Handling | 12 June 2003 | Additional Information Regarding Request for License Amendment Related to Heavy Loads Handling | Code Reconciliation Earthquake |
RS-03-116, Request for Technical Specifications Change Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation. | 15 August 2003 | Request for Technical Specifications Change Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation. | Grab sample Safe Shutdown Earthquake Pressure Boundary Leakage |
RS-03-121, Registration of Use of Cask to Store Spent Fuel | 17 June 2003 | Registration of Use of Cask to Store Spent Fuel | |
RS-03-122, Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | 20 June 2003 | Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | Coatings Large early release frequency Exemption Request |
RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation | 26 June 2003 | Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation | Reactor Vessel Water Level Hydrostatic Operating Basis Earthquake Grace period |
RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 19 June 2003 | Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Earthquake |
RS-03-127, Commitments for Resolution of Steam Dryer Degradation Issue | 27 June 2003 | Commitments for Resolution of Steam Dryer Degradation Issue | |
RS-03-128, Registration of Use of Cask to Store Spent Fuel | 1 July 2003 | Registration of Use of Cask to Store Spent Fuel | |
RS-03-131, Additional Information Supporting Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program | 7 July 2003 | Additional Information Supporting Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program | |
RS-03-135, Additional Information Supporting the Proposed Alternative Testing Requirements for Shutdown Service Water System Valves for the Second 10-Year Inservice Testing Program, Clinton Power Station, Unit 1 | 17 July 2003 | Additional Information Supporting the Proposed Alternative Testing Requirements for Shutdown Service Water System Valves for the Second 10-Year Inservice Testing Program, Clinton Power Station, Unit 1 | Stroke time |
RS-03-136, Request to Withhold Information from Public Disclosure | 9 July 2003 | Request to Withhold Information from Public Disclosure | |
RS-03-137, Schedule for Completing Committed Actions Regarding Resolution of Steam Dryer Degradation Issue | 10 July 2003 | Schedule for Completing Committed Actions Regarding Resolution of Steam Dryer Degradation Issue | |
RS-03-140, Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power | 29 July 2003 | Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power | Safe Shutdown Shutdown Margin Ultimate heat sink Anticipated operational occurrence Incorporated by reference Battery sizing |
RS-03-142, Additional Information Regarding Request for License Amendment for Pressure-Temperature Limits for Dresden Nuclear Power Station, Units 2 and 3 | 17 July 2003 | Additional Information Regarding Request for License Amendment for Pressure-Temperature Limits for Dresden Nuclear Power Station, Units 2 and 3 | Unanalyzed Condition |
RS-03-144, Registration of Use of Cask to Store Spent Fuel | 22 July 2003 | Registration of Use of Cask to Store Spent Fuel | |
RS-03-145, Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program | 19 August 2003 | Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program | |
RS-03-146, Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors, Dated 06/09/03 | 6 August 2003 | Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors, Dated 06/09/03 | Boric Acid Non-Destructive Examination Coatings Foreign Material Exclusion |
RS-03-147, Additional Information Regarding the Request for License Amendment Related to Heavy Loads Handling | 25 July 2003 | Additional Information Regarding the Request for License Amendment Related to Heavy Loads Handling | Tornado-Generated Missile |
RS-03-149, Licensed Thermal Power Limit Verification | 15 August 2003 | Licensed Thermal Power Limit Verification | |
RS-03-152, Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-Duty | 25 July 2003 | Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-Duty | Enforcement Discretion |
RS-03-153, Transmittal of Dresden Nuclear Power Station, Units 2 and 3, Additional Information Regarding Request for License Amendment for Pressure Temperature Limits | 31 July 2003 | Transmittal of Dresden Nuclear Power Station, Units 2 and 3, Additional Information Regarding Request for License Amendment for Pressure Temperature Limits | |
RS-03-154, Exelon/Amergen 60-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. | 11 August 2003 | Exelon/Amergen 60-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. | |
RS-03-155, Additional Information Supporting Request for License Amendment Related to Application of Alternative Source Term | 4 August 2003 | Additional Information Supporting Request for License Amendment Related to Application of Alternative Source Term | |
RS-03-157, Additional Information Regarding Inservice Testing Program Relief Requests | 6 August 2003 | Additional Information Regarding Inservice Testing Program Relief Requests | Stroke time Post Accident Monitoring |
RS-03-159, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 7 August 2003 | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Met Tower Nuclear Accident Reporting System |
RS-03-160, Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. | 5 August 2003 | Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. | Probabilistic Risk Assessment Large early release frequency |
RS-03-161, Transmittal of General Electric Technical Assessment Regarding Quad Cities Nuclear Power Station Unit 2 Steam Dryer Failure | 11 August 2003 | Transmittal of General Electric Technical Assessment Regarding Quad Cities Nuclear Power Station Unit 2 Steam Dryer Failure | |
RS-03-163, Response to Request for Additional Information Regarding Fourth Interval Inservice Inspection Program Plan | 13 August 2003 | Response to Request for Additional Information Regarding Fourth Interval Inservice Inspection Program Plan | Probabilistic Risk Assessment VT-2 |
RS-03-164, Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations | 19 August 2003 | Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations | Probabilistic Risk Assessment Large early release frequency |
RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | 8 August 2003 | Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | |
RS-03-166, Update to Information Supporting License Amendment Request to Permit Uprated Power Operation at Dresden, Units 2 & 3 and Quad Cities, Units 1 & 2 | 15 August 2003 | Update to Information Supporting License Amendment Request to Permit Uprated Power Operation at Dresden, Units 2 & 3 and Quad Cities, Units 1 & 2 | Flow Induced Vibration |
RS-03-169, Additional Information Supporting the Request for Amendment to Technical Specifications 3.2.2, Minimum Critical Power Ratio (Mcpr), Addition of a New Surveillance Requirement | 28 August 2003 | Additional Information Supporting the Request for Amendment to Technical Specifications 3.2.2, Minimum Critical Power Ratio (Mcpr), Addition of a New Surveillance Requirement | Anticipated operational occurrence Minimum Critical Power Ratio |
RS-03-170, Registration of First Use of Cask to Transport Spent Fuel | 28 August 2003 | Registration of First Use of Cask to Transport Spent Fuel | |
RS-03-171, Request for License Amendment Related to Heavy Loads Handling | 29 August 2003 | Request for License Amendment Related to Heavy Loads Handling | Safe Shutdown Design basis earthquake Control of Heavy Loads |
RS-03-172, Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source Term | 15 September 2003 | Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source Term | Pressure Boundary Leakage Recently irradiated fuel |
RS-03-173, Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations. | 26 September 2003 | Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-03-174, Notification of Intent to Perform Analyses Using Vendor Safety Analysis Codes | 19 September 2003 | Notification of Intent to Perform Analyses Using Vendor Safety Analysis Codes | Shutdown Margin |