Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
LR-N980325, Forwards Response to 980430 RAI Re GL 96-06 Re Licensee Determination If Containment Air Cooler Cooling Water Systems Are Susceptible to Waterhammer of two-phase Flow Conditions During Postulated Accident Conditions | 7 July 1998 | Forwards Response to 980430 RAI Re GL 96-06 Re Licensee Determination If Containment Air Cooler Cooling Water Systems Are Susceptible to Waterhammer of two-phase Flow Conditions During Postulated Accident Conditions | Flow Induced Vibration |
LR-N980326, Submits Modified Commitments Made by Util in Response to GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Bwrs | 6 August 1998 | Submits Modified Commitments Made by Util in Response to GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Bwrs | |
LR-N980455, Forwards Drawings Listed on Page 17 of 17 of Hope Creek Inservice Test Program,Per Request to Support NRC Review of IST Program for Second Interval Submitted on 971222.Without Encl | 21 September 1998 | Forwards Drawings Listed on Page 17 of 17 of Hope Creek Inservice Test Program,Per Request to Support NRC Review of IST Program for Second Interval Submitted on 971222.Without Encl | |
LR-N980503, Forwards Proposed Rev 12 to Salem & Hope Creek Security Plan,Per Requirements of 10CFR50.54(p).Summary of Proposed Changes to Plan Is Included.Without Encl | 14 December 1998 | Forwards Proposed Rev 12 to Salem & Hope Creek Security Plan,Per Requirements of 10CFR50.54(p).Summary of Proposed Changes to Plan Is Included.Without Encl | |
LR-N980574, Submits Response to RAI Re First 10-yr ISI Interval Requests for Relief for Plant.Attachment 1 Responds to Each RAI Item & Refers to Other Attachments,As Necessary,To Provide Responses.Attachment 2 Provides List of Acronyms Used | 15 December 1998 | Submits Response to RAI Re First 10-yr ISI Interval Requests for Relief for Plant.Attachment 1 Responds to Each RAI Item & Refers to Other Attachments,As Necessary,To Provide Responses.Attachment 2 Provides List of Acronyms Used | Nondestructive Examination Liquid penetrant |
LR-N990111, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records | 25 March 1999 | Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records | |
LR-N990112, Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve | 5 March 1999 | Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve | |
LR-N990131, Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities | 22 March 1999 | Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities | |
LR-N990132, Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 | 22 March 1999 | Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 | |
LR-N990133, Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 101 | 22 March 1999 | Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 101 | |
LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds | 9 July 1999 | Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds | Hydrostatic |
LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 | 16 June 1999 | Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 | Incorporated by reference |
LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl | 30 June 1999 | Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl | |
LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also | 1 September 1999 | Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also | |
LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review | 28 September 1999 | Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review | |
ML18011B136 | 13 December 1994 | Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld | |
ML18043B145 | 20 March 1979 | Forwards Proprietary Rept NEDE-23749-1-P, Comparison of Analytical Model for Computing Safety Relief Valve Discharge Line Transient Pressures & Forces to Monticello T-Quencher Test Data. Withheld (Ref 10CFR2.790) | |
ML18079A238 | 30 April 1979 | Forwards Annual Financial Rept,1978 for Public Svc Electric & Gas Co,Atlantic City Electric Co,Delmarva Power & Light Co & Philadelphia Electric Co | |
ML18079A910 | 31 August 1979 | Forwards Rept Re Util Capabilities to Deal w/TMI-2 Type Events, Corporate Capabilities,Nuclear Generating Station Managerial & Prof/Technical Support. | |
ML18081A885 | 10 January 1980 | Forwards Comments by Public Svc Electric & Gas Et Al Intervenors Coleman Petition for Issuance of Order to Show Cause.No Show Cause Proceeding Suspension or Revocation of Licenses Warranted | |
ML18081A915 | 9 January 1980 | Responds to NRC 791031 Ltr.Reflects Agreements Reached at 800107 Meeting Re Monitoring Shortnose Sturgeon.Epa Joins in Consultation W/Nrc Prior to Agency Action W/Natl Marine Fisheries Svc | |
ML18081A927 | 16 January 1980 | Forwards Vj Schuler 790114 Affidavit Re Impact of Facility on Shortnose Sturgeon in DE River Estuary | |
ML18081A996 | 25 January 1980 | Forwards Ichthyological Associates Rept, Review of Aquatic Sampling Programs in DE River Estuary from 1958-1979, W/Special Ref to Capture of Shortnose Sturgeon. | |
ML18081B176 | 5 March 1980 | Concurs W/Nrc Conclusion That Facility Operation Will Not Jeopardize Continued Existence of Shortnose Sturgeon | |
ML18081B263 | 10 March 1980 | Requests Name Removal as Atty for Township of Lower Alloways Creek in Proceedings | |
ML18082A186 | 15 April 1980 | Responds to NRC 800314 Biological Assessment of Impact of Continued Operation or Const of Facilities.Forwards Biological Opinion & Summary of Informal Consultation W/Nrc Re Salem Unit 1.Shortnose Sturgeon Are Not in Jeopardy | |
ML18082A340 | 1 May 1980 | Forwards 1979 Annual Financial Repts for Philadelphia Electric Co,Delmarva Power & Light Co,Atlantic Electric & Public Svc Electric & Gas Co | |
ML18085A284 | 17 November 1980 | Discusses Telcon Re Shift Experience Requirements for License Candidates.Min of 3 Months Experience Is Necessary,But Should Be Separated Into Multiple Wk Segments on Specific Topics.Course Schedules Encl | Shutdown Margin |
ML18085A716 | 22 January 1981 | Forwards Endorsement 42 to Nelia Policy NF-230 & Endorsement 34 to Maelu Policy MF-90 | |
ML18085B077 | 30 January 1981 | Requests Extension Until 810209 to Respond to Suppl 3 of IE Bulletin 79-01B, Environ Qualification of Class IE Equipment, Re Equipment Required to Achieve & Maintain Cold Shutdown | |
ML18086A359 | 29 April 1981 | Forwards 1980 Annual Financial Repts for Public Svc Electric & Gas Co,Atlantic City Electric Co,Delmarva Power & Light Co & Philadelphia Electric Co | |
ML18086A461 | 4 May 1981 | Requests Injunction to Preserve Status Quo of Reracking at Facility | |
ML18086A464 | 4 May 1981 | Requests Info Re Util Requests to Perform Pin Consolidation at Facilities | |
ML18086A490 | 24 March 1981 | Forwards Constituent 810305 Inquiry Re Use of Microfiche at NRC Lpdr | |
ML18086B052 | 17 November 1981 | Requests Removal of FP Librizzi from NRC Mailing List & Replacement W/Ra Uderitz | |
ML18086B334 | 25 February 1982 | Forwards Endorsements 51 & 52 to Nelia Policy NF-230, Endorsement 41 to Maelu Policy MF-90,Endorsements 8 & 9 to ANI Binder EB-60 & Endorsements 6 & 7 to ANI Binder EB-72 | |
ML18086B382 | 9 March 1982 | Forwards Endorsements 8 & 6 to Maelu Binders XB-60 & XB-72, Respectively | |
ML18086B386 | 19 March 1982 | Forwards Endorsement 53 to Nelia Policy NF-230,Endorsement 10 to Nelia Binder EB-60 & Endorsement 8 to Nelia Binder EB-72 | |
ML18086B409 | 8 April 1982 | Forwards Annual Financial Repts,1981 | Biofouling |
ML18086B476 | 4 May 1982 | Forwards Endorsement 54 to Nelia Policy NF-230 | |
ML18086B495 | 17 May 1982 | Forwards Endorsement 42 to Maelu Policy MF-90 | |
ML18086B594 | 26 July 1982 | Responds to 820420 Request for Addl Info on Postulated Main Steam Line Break Inside Containment (IE Bulletin 80-04).Addl Analysis Beyond Design Basis Not Necessary | |
ML18087A810 | 4 April 1983 | Confirms 830331 Commitment to Undertake Independent Mgt Diagnostic of Structure,Mgt Sys & Staffing of Nuclear Dept & Establish Nuclear Oversight Committee to Provide Basis for Evaluating Effectiveness of Nuclear Safety | |
ML18087A835 | 11 April 1983 | Submits Addl Supporting Details Associated W/Independent Mgt Diagnostic of Util Nuclear Dept Structure,Mgt Sys & Staffing.Mgt Analysis Co Will Provide Final Rept W/Appropriate Recommendations & Action Plan by 830613 | |
ML18087A918 | 17 May 1983 | Forwards Annual Financial Repts for 1982 | Nondestructive Examination |
ML18089A225 | 6 July 1983 | Forwards Endorsements 59 & 60 to Nelia Policy NF-230 & Endorsements 46 & 47 to Maelu Policy MF-90 | |
ML18089A342 | 6 September 1983 | Requests Extension Until 840229 to Respond to Generic Ltr 83-28 Re Required Actions Based on Generic Implications of Salem ATWS Events.Delay Based on Completion of BWR Owners Group Guidelines for Assessing Plant Capabilities | |
ML18089A379 | 26 September 1983 | Forwards Endorsements 62 & 63 to Nelia Policy NF-230 & Endorsements 49 & 50 to Maelu Policy MF-90 | |
ML18089A473 | 20 December 1983 | Forwards Summary of Facility Evacuation Time Estimates Based on Review Against NUREG-0654,Rev 1.No Deficiencies Noted | |
ML18089A474 | 21 December 1983 | Forwards Endorsements 64 & 65 to Nelia Policy NF-230, Endorsements 51 & 52 to Maelu Policy MF-90,Endorsement 4 to Nelia Certificates N-60 & N-72 & Endorsement 4 to Maelu Certificates M-60 & M-72 |