Issue date | Title | Topic | |
---|---|---|---|
ML101680575 | 17 June 2010 | Operator Licensing Examination Approval-R.E. Ginna Nuclear Power Plant | |
ML101720347 | 5 May 2010 | Comments on Exam - NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) | |
ML101720553 | 6 April 2010 | Draft - Outlines (Folder 2) | Downpower |
ML101720560 | 5 May 2010 | Draft Written Exam (Folder 2) | Fire Barrier Locked High Radiation Area Continuous fire watch Fire Watch Power change |
ML101720564 | 21 May 2010 | Draft Operating Exam (Sections a, B, and C) (Folder 2) | |
ML102100196 | 23 July 2010 | Response to RIS 2010-08, Preparation and Scheduling of Operator License Examinations | Generic Fundamentals Examination |
ML102320373 | 25 May 2010 | Final Outlines (Folder 3) | Unanalyzed Condition Post Accident Monitoring Locked High Radiation Area Fuel cladding Power change |
ML102320386 | 25 May 2010 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Fire Barrier Locked High Radiation Area Continuous fire watch Fire Watch Power change |
ML102320393 | 25 May 2010 | Handouts to Applicants - Summary of References (Folder 3) | |
ML102320408 | 25 May 2010 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Unanalyzed Condition Boric Acid Grab sample Post Accident Monitoring Job Performance Measure Fuel cladding Downpower |
ML102520045 | 28 June 2010 | Final Qa/Related Forms (Folder 1) | |
ML102520054 | 16 July 2010 | Post Exam Comments and Technical References (Folder 1) | Job Performance Measure |
ML102710006 | 5 August 2010 | NRC Operator Licensing Initial Exam Results, R. E. Ginna Nuclear Power Plant, LLC (Cover Letter Publicly Available; Enclosures Withheld from Public) | |
ML103270138 | 23 November 2010 | Senior Reactor Operator and Reactor Operator Written Retake Examinations - R.E. Ginna Nuclear Power Plant, LLC | |
ML110140343 | 14 January 2011 | Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates | Generic Fundamentals Examination |
ML110950128 | 5 April 2011 | Initial Operator Licensing Written Retake Examination Approval (R.E. Ginna Nuclear Power Plant, LLC) | |
ML111010421 | 13 December 2010 | Written Retake - NRC Comments on Draft Licensee-Developed Exam (Written Tests)(Folder 2) | |
ML111010427 | 6 December 2010 | Written Retake - Draft - Outlines (Facility Letter Dated 12/6/10) (Folder 2) | Boric Acid Loop seal Hydrostatic Power change |
ML111150924 | 29 March 2011 | Written Retake - Final Outlines (Folder 3) | Boric Acid |
ML111150991 | 29 March 2011 | Written Retake - Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Hot Short Safe Shutdown Boric Acid Shutdown Margin High Radiation Area |
ML111580043 | 6 May 2011 | Written Retake - Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML113000053 | 27 October 2011 | Announcement of Generic Fundamentals Examination 2012 Administration Dates | Generic Fundamentals Examination |
ML12143A262 | 22 May 2012 | Senior Reactor and Reactor Operator Initial License Examinations - R.E. Ginna Nuclear Power Plant | |
ML12257A025 | 12 September 2012 | Requalification Program Inspection - R. E. Ginna Nuclear Power Plant | |
ML12272A026 | 28 September 2012 | R. E. Ginna Nuclear Power Plant, Unit 1: Initial Operator Licensing Operating Test Approval | |
ML12291A019 | 17 October 2012 | Initial Operator Licensing Written Exam Approval (R. E. Ginna Nuclear Power Plant, Unit 1) | |
ML12332A097 | 18 October 2012 | Final Outlines (Folder 3) | Boric Acid Shutdown Margin Locked High Radiation Area |
ML12332A107 | 18 October 2012 | Final Written Examination with Answer Key (401-5 Format) (Folder 2) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Locked High Radiation Area Scaffolding Power change |
ML12332A110 | 1 October 2012 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Boric Acid Shutdown Margin High Radiation Area Stroke time Post Accident Monitoring Job Performance Measure Deep Dose Equivalent Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML12339A253 | 21 November 2012 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML12339A257 | 9 November 2012 | Post Exam Comments, Resolution, and Technical References (Folder 1) | Offsite Dose Calculation Manual |
ML12356A332 | 18 October 2012 | NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML12356A346 | 18 October 2012 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML12356A352 | 28 June 2012 | Draft - Outlines (Folder 2) | Shutdown Margin Offsite Circuit Power change |
ML12356A369 | 18 October 2012 | Draft Written Exam (Folder 2) | Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area Power change |
ML12356A376 | 18 October 2012 | Draft Operating Exam (Sections a, B, and C) Folder 2) | Boric Acid Shutdown Margin High Radiation Area Stroke time Post Accident Monitoring Job Performance Measure Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML13079A047 | 19 March 2013 | R. E. Ginna Nuclear Power Plant: Senior Reactor and Reactor Operator Retake Initial License Examinations | |
ML13114A080 | 23 April 2013 | R. E. Ginna Nuclear Power Plant, Unit 1, Initial Operator Licensing Retake Examinations Approval | |
ML13120A072 | 26 April 2013 | R. E. Ginna Nuclear Power Plant, LLC: March 6, 2013, NRC Generic Fundamentals Examination Results (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML13149A412 | 26 April 2013 | Final Written Examination with Answer Key (401-5 Format) (Folder 2) | Shutdown Margin B.5.b Mitigating Strategies Offsite Circuit |
ML13149A419 | 26 April 2013 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Shutdown Margin Grab sample Time to boil Job Performance Measure Offsite Circuit |
ML13184A120 | 16 May 2013 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML13184A123 | 26 April 2013 | Miscellaneous Exam Materials (Folder 1) | |
ML13184A126 | 22 April 2013 | Final Outlines (Folder 3) | Shutdown Margin Time to boil |
ML13184A133 | 25 April 2013 | NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML13184A163 | 16 April 2013 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML13184A174 | 28 January 2013 | Draft Outlines (Folder 2) | Time to boil |
ML13184A181 | 25 March 2013 | Draft Written Exam (Folder 2) | Shutdown Margin B.5.b Mitigating Strategies Offsite Circuit |
ML13184A186 | 5 April 2013 | Draft Operating Exam (Sections a Abd B) (Folder 2) | Shutdown Margin Grab sample Time to boil Met Tower Job Performance Measure Offsite Circuit |
ML14246A013 | 2 September 2014 | Requalification Program Inspection, R.E. Ginna Nuclear Power Plant |