Appendix C Page 2 of 17 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

062-021-01-01 Task

Title:

Establish 10010 Electric Lineup on JPIVI No.:

2012 Retake N-A Circuit 767 KIA

Reference:

062 A4.01 3.3/3.1 Alternate Path:

Yes X No Ability to manually operate andlor Time Critical:

Yes No X monitor in the control room: All breakers (including available switchyard)

Category: ROISRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Matenals:

General

References:

  • The plant is operating at 100% power
  • The Electric Plant is currently in a 50/50 NORMAL lineup
  • RG&E ECC has requested that the plant be placed in a 10010 lineup on Circuit 767 for scheduled maintenance on offsite Circuit 7T later today
  • An A-52.12 for removal of Circuit 7T is being prepared Transfer 4160V buses from a 50/50 NORMAL Lineup to 100/0 Lineup on Circuit 767, recognize failure of breaker to auto trip, and implement of 0-6.9.2.

None 0-6.9.2, ESTABLISHING AND/OR TRANSFERRING OFFSITE POWER TO BUS 12A / BUS 12B Rev 02200 2012 SROI Retake NRC JPM-A

Appendix C Page 3 of 17 Form ES-C-1 JPM WORKSHEET Handouts:

0-6.9.2, ESTABLISHING ANDIOR TRANSFERRING OFFSITE POWER TO BUS 12A I BUS 12B Rev 02200 (marked up)

Initiating Cue:

  • The CRS directs you to establish a 10010 Electric Plant alignment per 0-6.9.2 ESTABLISHING ANDIOR TRANSFERRING OFFSITE POWER TO BUS 12A 1BUS 12B, Section 6.3
  • The SM and RG&E ECC have approved performance of this bus re alignment.

Validation Time:

19 minutes (4104/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Loss of power to 4160V Bus 12A.

SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI Retake NRC..IPM-A

Appendix C Page 4 of 17 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP Reset in IC-19 or any at-power Initial Condition Ensure the electric plant is in a Normal 50/50 electric plant lineup NOTE:

The simulator electrical model (in 2013) does not have the capability to fail the auto trip feature of 52/12AY when 52/12BY is closed in. Having the 52/12AY synchroscope also ON, however, defeats this interlock and would prevent the breaker from opening. Since there is only one (1) synchroscope handle, however, and is being used to close the 52/12BY breaker, a "software work around" must be accomplished by opening an Event and Schedule file:

1. Open Event in the Events box:

Enter x05i115a in the Event Code box

  • Type 'Trigger on 12A AL T Synch Switch taken to ON position" in the Description box (optional)
2. Open Event 2 in the Events box:

Enter jbk 12by & ! x05i115a in the Event Code box

  • Type "Remove Override EDS29 when" in the Description box (optional)
3. SAVE the Event with a file name of your choice.
4. Open and LEAVE OPEN the file you just saved.
5. Build a new Schedule file box:
6. Enter the following in the Schedule box:

~ Insert Pause I @Time Event Action Description 10 0

I 1

insert override ovr-eds29 to 1 0

2 remove override ovr-eds29 I

10 0

0

! Insert OVR-EDS690 to FALSE 12AY Trip signal

0 0

0

Insert OVR-EDS69G to FALSE 12AY Pull-to-stop Signal 1

I 0

0 0

Insert OVR-EDS69F to FALSE 12AY Norm Aft Trip signal 1

I

7. SAVE the schedule file you just created.
8. Open and RUN the schedule file.

2012 SROI Retake NRC JPM-A

Appendix C Page 5 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a --1)

Start Time: ___

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Verifies the appropriate section of 0-6.9.2 to be performed.

Table of Contents and Section 6.3 Reviews Sections 1.0 through 5.0 of 0-6.9.2 Notes in Section 2.1 that the Subsections of Section 6 can be performed as necessary, and subsections NOT performed may be marked N/A None Provide examinee with a copy of 0-6.9.2, marked up through Precaution Step 5.0 ESTABLISH Offsite Power to 12A Bus using Circuit 767 as follows:

MARK BUS 12A NORMAL FEED FROM 7T, 52/12AY, breaker initial position:

OPEN..............

CLOSED........... X 6.3.1.1 Verifies BUS 12A NORMAL FEED FROM 7T, 52112ABY is closed: red light ON and green light OFF Checks box that breaker is CLOSED None 2012 SROI Retake NRC JPM-A

Appendix C Page 6 of 17 Form ES-C-1 JPM VERI FICA TION OF COMPLETION Performance Step: 3 VERIFY CLOSED CIRCUIT BKR 76702 34 KV BUS Procedure Step:

6.3.1.2 Locates Breaker 76702 34 KV BUS indication Standard:

Verifies red light ON and green light OFF.

Evaluator CUE:

None Comment:

Performance Step: 4 TURN ON BUS 12A ALT FEED FROM 767, 52/12BY, SYNCHROSCOPE.

Procedure Step:

6.3.1.3 Standard:

Evaluator CUE:

None Evaluator NOTE:

The operator may inform you that J-6, 4KV MAIN OR TIE BREAKER TRIP, and L-20, 12A XFMR OR 12A BUS TROUBLE, will alarm after closing Bus 12A Normal Feed breaker Comment:

2012 SROI Retake NRC JPM-A

Appendix C Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION NOTE identifies that annunciators J-6 and L-20 will alarm after performing the next step, AND to complete steps 6.3.1.5 thru 6.3.1.7 without delay after closing in.

NOTE prior to 6.3.1.4 Reads the NOTE None CLOSE BUS 12A ALT FEED FROM 767, 52/12BY 6.3.1.4

--I-iJlf Closes 52/12BYbreaR$r Verify breaker Red light ON and Green light OFF None Closing this ALTERNATE feed breaker SHOULD automatically trip the Normal feed breaker and result in J-6, 4KV Main or Tie Breaker Trip Acknowledges annunciators J-6, 4KV MAIN OR TIE BREAKER TRIP, and L-20, 12 XFMR OR 12A BUS TROUBLE.

N/A Notes that J-6 did NOT alarm (since breaker did not trip)

References the previous NOTE None 2012 SROI Retake NRC JPM-A

Appendix C Page 8 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION


--- ---......-~------~

Performance Step: 8 IF Bus 12A NORMAL FEED FROM 7T, 52/12AY, was initially OPEN, then VERIFY breaker is OPEN AND RESET (Green light illuminated, White light EXTINGUISHED). OTHERWISE, mark this step N/A Procedure Step:

6.3.1.5 Standard:

Verifies 52/12AY was initially CLOSED, AND

  • Marks this step N/A Evaluator CUE:

None Comment:

l _____N_R_C_E_X_A_M_IN_E_R_:_A_L_T_E_R_NA_T_E_PA_"_rH_B_E_G_IN_S_W_IT_H_T_H_E_N_E_X_T_S_T_E_P_____---l Performance Step: 9 IF Bus 12A NORMAL FEED FROM 7T, 52/12AY, was initially CLOSED, then perform the following:

a. Verify breaker OPENED (green and white lights - LIT
b. Place Bus12A NORMAL FEED FROM 7T, 52/12AY, control switch to TRIP and then to AUTO
c. Verify the breaker is OPEN and RESET (green light LIT, white light OFF)

Procedure Step:

6.3.1.6 Standard:

  • Verify breaker did NOT OPEN (red light still LIT)

Place Bus 12A NORMAL FEED FROM 7T, 52/12AY, control switch to TRIP and then to AUTO

  • Verify the breaker is OPEN and RESET (green light LIT, white light OFF)

Evaluator CUE:

None Comment:

2012 SROI Retake NRC JPM-A

Appendix C

;. Performance Step: 10 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 11 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 9 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION IF Bus 12A NORMAL FEED FROM 7T, 52/12AY, is NOT OPEN, THEN immediately perform Attachment 1, 7T/Bus 12A Circulating Current Contingency Action. OTHERWISE, mark this step N/A.

6.3.1.7

  • ir~/..g.~&Q9fli4Eis;th9tttif
    ¥.Kfd~.MALFEED52/12AYbteak~r qiB;!~P;jf:¥9pe9 Goes to Attachment 1 None CAUTION: This attachment is only performed as directed when breaker 52/12AY is NOT OPEN.

ATT -1, CAUTION prior to Step 1.0 Reads CAUTION, confirms this is the correct action based on 52!12AY not opening None 2012 SROI Retake NRC JPM-A

Appendix C Performance Step: 12 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 13 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 14 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 10 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION VERIFY Bus 12A NORMAL FEED FROM 7T, 52/12AY, is NOT OPEN ATT-1, Step 1.0 Checks 52/12AY breaker is still closed (red light ON, green light OFF)

None VERIFY CLOSED BUS 12A ALT FEED FROM 767, 52/12BY 2.0 Verifies that ALT FEED from 767, 52/12BY, is CLOSED (in Step 6.3.1.4 None VERIFY BUS 12A VOLTMETER4160V indicates approximately 4000 VOLTS 3.0 Verifies BUS 12A VOLTMETER reads -4000 VOLTS None 2012 SROI Retake NRC JPM-A

Appendix C Page 11 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 15 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 16 Procedure Step:

Standard:

Evaluator CUE:

Comment:

.~

Performance Step: 17 Procedure Step:

Standard:

VERIFY CLOSED CIRCUIT BREAKER 7T1352 34 KV BUS 4.0 Verifies 7T1352 34 KV BUS supply breaker is CLOSED None NOTE:

  • Next step SHOULD automatically trip BUS 12A ALT FEED FROM 767, 52/12BY
  • Performance of next step will cause MCB alarm J-6, 4KV MAIN or TIE BREAKER TRIP, to illuminate NOTE prior to Step 5.0 Reads NOTE None TURN OFF BUS 12A ALT FEED FROM 767, 52/12BY, SYNCHROSCOPE AND REMOVE handle 5.0

[~l TURNS OFF BU812A ALTFEEDFROM 767, 52/12BY, SYNCHROSCOPE

  • Removes handle Evaluator CUE:

None Comment:

2012 SROI Retake NRC JPM-A

Appendix C Page 12 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 18 VERIFY BUS 12A AL T FEED FROM 767, 52/12BY, OPENS (Green light ILLUMINATED, White light ILLUMINATED)

Procedure Step:

6.0 Standard

Checks MCB indications for 52/12BY: green light LIT, white light LIT Evaluator CUE:

None Comment:

Performance Step: 19 PLACE BUS 12A ALT FEED FROM 767, 52/12BY, control switch to TRIP and THEN to AUTO Procedure Step:

7.0 Standard

Places the switch for breaker BUS 12A ALT FEED FROM 767, 52112BY, to the TRIP position and then to AUTO Evaluator CUE:

None Comment:

2012 SROI Retake NRC..IPM-A

Appendix C Performance Step: 20 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 21 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 13 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION VERIFY BUS 12A ALT FEED FROM 767, 52/12BY, is OPEN and RESET(Green light ILLUMINATED, White light EXTINGUISHED) 8.0 Verifies that green light is ON, white light is OFF None PLACE BUS 12A NORMAL FEED FROM 7T, 52/12AY, control switch to CLOSE AND THEN to AUTO 9.0 Places the switch for breaker BUS 12A NORMAL FEED FROM 7T, 52/12AY, to the CLOSE position and then to AUTO

  • Verifies that RED light is ON, white light is OFF None 2012 SROI Retake NRC JPM-A

Appendix C Performance Step: 22 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Terminating Cue:

Stop Time: ___

Page14of17 Form ES-C-1

~IPM VERIFICATION OF COMPLETION VERIFY BUS 12A NORMAL FEED FROM 7T, 52/12AY, is CLOSED and RESET(Red light ILLUMINATED, White light EXTINGUISHED) 10.0 Verifies that red light is ON, white light is OFF None "No further action is required."

2012 SROI Retake NRC JPM-A

Appendix C Page 15 of 17 Form ES-C-1

~IPM VERIFICATION OF COMPLETION JR062.027, Rev. 0 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Establish 100/0 Lineup on Circuit 767 (Power 12A and 128 Buses from Ckt 767)

TASK:

062-021-01-01, Lineup the Electrical Distribution System Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE DYES D NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

D SATISFACTORY UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM-A

i Appendix C Page 16 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Step Procedure Step I

Basis for Critical Step 4

6.3.1.3 I Required switch action(s) to perform correctly 6

6.3.1.4 Required switch action(s) to perform correctly 10 6.3.1.7 Critical to the recognition of the failure and correct transition to Attachment 1 17 ATT-1, step 5.0 Required switch action(s) to perform correctly 2012 SROI Retake NRC JPM-A

Appendix C Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

JPM CUE SHEET

  • The plant is operating at 100% power
  • The Electric Plant is currently in a 50/50 NORMAL lineup
  • RG&E ECC has requested that the plant be placed in a 100/0 lineup on Circuit 767 for scheduled maintenance on offsite Circuit 7T later today
  • An A-52.12 for removal of Circuit 7T is being prepared
  • The CRS directs you to establish a 100/0 Electric Plant alignment per 0-6.9.2 ESTABLISHING AND/OR TRANSFERRING OFFSITE POWER TO BUS 12A / BUS 12B, Section 6.3
  • The SM and RG&E ECC have approved performance of this bus re-alignment 2012 SROI Retake NRC JPM-A

Appendix C Page 2 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Facility:

Ginna Task

Title:

Place Standby AFW System In Service per FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK KJA

Reference:

E05 EA1.1 (4.1/4.0)

Ability to operate and/or monitor the following as they apply to the Loss of Secondary Heat Sink: Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Examinee:

Facility Evaluator:

Method of testing:

Simulated Performance:

Classroom Simulator x

Task No.:

061-003-01-01

~IPM No.:

JR061.001 Alternate Path: YES NO~

Time Critical:

YES NO Category:

ROISRO NRC Examiner:

Date:

Actual Performance:

x Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant was at power when both Main Feedwater Pumps tripped

Mechanical Maintenance is investigating the problem

  • The crew is responding per FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, and has completed the procedure up to step 5 Task Standard:

The 'C' SAFW Pump started with a flow path to the 'A' SIG established.

Required Materials:

None 2012 SROI Retake NRC JPM-B


.....-.~.-.......

Appendix C General

References:

Handouts:

Initiating Cue:

Time Critical Task:

Validation Time:

Page 3 of 17 Form ES-C-1

,,'PM VERIFICATION OF COMPLETION

  • A TT -5.1, SAFW, Rev 01002
  • ATT-22.0, RESTORING FEED FLOW, Rev 00600 FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, Revision 04002 FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK (marked up to Step 5)
  • ATT-5.1, SAFW
  • ATT-22.0, RESTORING FEED FLOW
  • The CRS has directed you to complete steps 5 and 6 of FR-H.1 to feed the 'A' S/G utilizing the 'C' SAFW pump.

No 10 Minutes (04/05/13) 2012 SROI Retake NRC "IPM-B

Appendix C Page 4 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION SIMULATOR SETUP Malfunctions:

Reset to IC-19, then go to RUN Ensure 'A', 'C', and 'D' SW pumps running Take 'A' MDAFW pump out of service: place 'A' MDAFW pump in Pullstop and close MOV-4007. Place CAUTION tags on switches for both components.

  • To fail TDAFW pump, insert MALF FDW12, 0 RPM
  • To trip Bus 16, set EDS04B true on Trigger 1.
  • To trip both MFPs, set FDW02A and FDW02B true on Trigger 1. Insert Trigger 1. (This will trip the reactor and initiate the procedural response)

Ensure BOTH Tavg values are < 550°F prior to FREEZE

  • AFTER Step 4 of FR-H.1 has been completed (Stop both RCPs), FREEZE the simulator and take shapshot.

Procedures:

Placekeep the Control Room laminated copy of E-O through Step 4 Note that ES-O.1 will not be place-kept because CSFSTs were monitored when E-O was exited, and FR-H.1 has been entered Placekeep the Control Room copy of FR-H 1 through step 4.

2012 SROI Retake NRC JPM-B

Appendix C Page50f17 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a..J)

Start Time: ____

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comments:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Obtain copy of FR-H.1, RESPONSE to LOSS of SECONDARY HEAT SINK N/A Obtains/ reviews first four (4) steps of marked-up FR-H.1 None Provide student with a marked-up copy of FR-H.1 Reset SI If Actuated FR-H.1, Step 5 Recognizes that SI has NOT occurred Goes to Step 6 None During a Safety Injection, MOV thermal overload relays are bypassed. The thermal overloads are put back in service by resetting Safety Injection. Therefore, if K-6 is extinguished, SI is RESET. In this event, no 51 has occurred.

2012 SROI Retake NRC JPM-B

Appendix C Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 6 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Try to establish SAFW flow to at least one intact S/G:

a. Perform the following:
1) Align SAFW system for operation (Refer to ATT-5.1, ATTACHMENT SAFW)

FR-H.1, Step 6a Refers to Attachment 5.1.

Provide a copy of ATT-5.1 SAFW controls and indications are on the back of the MCB Panel.

2012 SROI Retake NRC JPM-B

Appendix C Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 7 of 17 Form JPM VERIFICATION OF COMPLETION CAUTION: If selected S/G Wide Range Level less than 50 Inches (100 Inches Adverse CNMT), THEN refer to Attachment 22.0, Restoring Feed Flow, prior to starting SAFW Pump ATT -5.1, CAUTION prior to Step A)

Reads CAUTION prior to Step A)

None

'A' and 'B' wide range levels will be -180" in this JPM setup Examiner should be standing by with a copy of ATT-22.0 If SW is not available to SBAFW, THEN go to ER-AFW.1 ALTERNATE WrER SUPPLY TO THE AFW PUMPS, to operate SAFW on city water supply.

ATT-5.1, Step A)

  • Verifies SW is available by verifying PI-2060 and 2061 indicate approximately 70 psig OR by the number of running SW pumps and absence of SW isolation.
  • Does NOT go to ER-AFW.1 None SW header pressure meters are on the front of the center vertical section of MCB, right side 2012 SROI Retake NRC JPM-B

Appendix C Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 8 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Align SAFW Pump C to selected S/G as follows:

1) Ensure SI Reset ATT-S.1, Step B) 1)

Observes K-6, THERMAL OVERLOAD RELAY BYPASSED extinguished, OR vocalizes that SI has not occurred None SI was extinguished previously in Step S of FR-H.1, AND SI has not occurred in this initial condition.

Ensure the following valves open:

MOV-9701A, SAFW PUMP C DISCHARGE VLV MOV-4616, AUX BLDG SW ISOL VLV MOV-9704A, SAFW PUMP C ISOL VLV ATT-S.1, Step B) 2)

Verifies Red light is lit for the following valves:

MOV-9701A, SAFW PUMP C DISCHARGE VLV (Back of MCB)

MOV-4616, AUX BLDG SW ISOL VLV (Front of MCB)

MOV-9704A, SAFW PUMP C ISOL VLV (Back of MCB)

None 2012 SROI Retake NRC JPM-B

-I Appendix C Page 9 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Open MOV-9629A, SAFW PUMP C SUCTION VLV ATT-S.1, B) 3)

(-/.)Bot(3tes'tAe.hanpS'li illuminated).on:MOV'-'96 Observes the Red light LIT for MOV-9629A, SAFW PUMP 'C

'SUCTION VLV None Verify at least 1 SW pump running ATT-S.1,B)4)

Returns to front of MCB and observes the Red light lit for the A, C and 0 Service Water pumps Observes approximately 55 psig on PI-2160 and 2161, SW Header Pressure.

None 2012 SROI Retake NRC...IPM-B

Appendix C Page 10 of 17 Form ES-C-1

~IPM VERIFICATION OF COMPLETION Performance Step: 10 NOTE: Perform Step 5a to feed 'A' S/G OR Step 5b to feed '8' S/G Procedure Step:

ATT-5.1, NOTE prior to Step B) 5a}

Standard:

Recalls from Initiating CUE that the direction provided was to feed the 'A' S/G Goes to Step 5a for further guidance Evaluator CUE:

None Evaluator NOTE:

Background document for FR-H.1 has the crew select and feed ONE S/G at a TIME. Initiating Cue was to feed 'A' S/G.

Comment:

Performance Step: 11 To feed S/G 'A', go to Step 6.

Procedure Step:

A TT -5.1, B) 5a)

Standard:

Goes to Step 6 EXAMINER CUE:

None Comment:

2012 SROI Retake NRC JPM-8


~..-

Appendix C Page 11 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 12 Restore SAFW flow as directed by procedure in effect.

Procedure Step:

A TT -5.1, Step 8) 6)

Standard:

Transitions back to FR-H.1, Step 6.a.2)

Evaluator ClIE:

None Comment:

Performance Step: 13 Determine SAFWflow requirements per ATI-22.0, ATIACHMENT RESTORING FEED FLOW Procedure Step:

FR-H.1, Step 6.a.2)

Standard:

Refers to ATI-22.0 Evaluator CUE:

Provide candidate with A TT -22.0 Comment:

2012 SROI Retake NRC JPM-B

Appendix C Page 12 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 14 CAUTION Feed flow rates should be controlled to prevent excessive RCS cooldown and associated RCS pressure and inventory reduction.

NOTE:

o This attachment provides the desired feed flow rate when restoring feed flow to a S/G during FR-H.1 o If feedwater is restored via main feedwater or condensate the following may be used to indicate flow to the S/G:

o S/G feedwater flow meters (MCB) o S/G feedwater flow recorders (MCB) o S/G feedwater flow (PPCS Point 10 F0466, F0467, F0476, F0477) o S/G feedwater RTD temperature lowers (PPCS Point ID T2096, T2097)

Procedural Step:

ATT -22.0, NOTE and CAUTION prior to Step 1 Standard:

Reads CAUTION and NOTES prior to Step 1 Evaluator CUE:

None Comment:

2012 SROI Retake NRC JPM-B

Appendix C Performance Step: 15 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 13 of 17 Form ES-C-1

~IPM VERIFICATION OF COMPLETION Check affected S/G Loop RCS Temperature:

a. Tavg in the affected loop less than 550°F
b. Fill affected S/G as necessary to restore level
c. Go to Step 3 A TT -22.0, Step 1
  • Checks MCB meters (TI-401 & TI-402 for Loop 'A') or ppes for RCS average temperature, determines Tavg < 550°F
  • Does NOT start the SAFW pump in this attachment
  • Returns to FR-H.1, Step 6.a.3) after making flow determination None
  • FR-H.1, Step 6.a.2) had candidate determine the flow requirements in ATT -22.0 prior to starting the SAFW pump. After making the determination of flow restrictions, the candidate returns to FR-H.1, Step 6.a.3) to start the SAFW pump.
  • Even IF Tavg was> 550°F, feed and bleed is NOT required due to WR levels> 120", and Step 2 RNa will direct filling as desired to restore S/G levels (i.e., still no flow restrictions).

2012 SROI Retake NRC...IPM-B

~~~-....... -------- ----------------------

Appendix C Page 14 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION

--.~----------------------

(.J)

Performance Step: 16 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Terminating Cue:

Stop Time: ____

Start selected SAFW pump(s)

FR-H.1, Step 6.a.3)

(.JlRotatesthE}.handl~forihe:;~$'~Ew Pump to the STARTpositiOrl (RED light illuminated)

  • Verifies SAFW flow on FI04084B automatically throttles to between 215 - 280 GPM None Candidate was directed to start the 'C' SAFW pump in Initiating Cue After SAFW flow is verified: "Evaluation on this "IPM is complete."

2012 SROI Retake NRC JPM-B

Appendix C Page 150f17 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SROI RETAKE JPM-B LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Place Standby AFW System in Service per FR-H.1 TASK:

061-003-01-01, Perform Lineups of the Auxiliary Feedwater System (MCB)

Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE DYES D

NO PERSONNEL ACTIONSIINACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

SATISFACTORY UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM-B

Appendix C Page 16 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

I I Performance Procedure Basis for Critical Step Step Step 8

ATT-5.1, step B)3)

Required switch action(s) to perform correctly I

15 ATT-22, step 1 Required action for proper procedural sequence 16 FR-H.1, step 6.a.3)

Required switch action(s) to perform correctly i

I I

i 2012 SROI Retake NRC JPM-B

Appendix C Page 17 of 17 Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

JPM CUE SHEET

.--........ --..~--~ -----

  • The plant was at power when both Main Feedwater Pumps tripped
  • After transitioning from E-O, REACTOR TRIP or SAFETY INJECTION to ES-0.1, REACTOR TRIP RESPONSE, the STA determined that a RED path condition existed on the HEAT SINKCSFST
  • The crew is responding per FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, and has completed the procedure up to step 5 The CRS has directed you to complete steps 5 and 6 of FR H.1 to feed the 'A' S/G utilizing the 'C' SAFW pump 2012 SROI Retake NRC JPM-B

Appendix C Page 2 of 22 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

004-004-02-04 Task

Title:

Place Letdown in Service JPM No.:

JR004.012 KIA

Reference:

004 A4.05 (3.6/3.1)

Alternate Path Yes

~ No Ability to manually operate andlor monitor in the control room:

Letdown pressure and temperature control valves Time Critical Yes No X

Category:

ROISRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is at power with the normal letdown system secured

  • Excess letdown is in service with one Charging Pump in operation
  • The letdown line has been isolated for 40 minutes and was not drained
  • A flush is NOT required
  • The setpoint of TCV-130 has been verified by FCMS points SP-3771 and SP-3758 to be 100°F Task Standard:

Letdown PCV-135 is in MANUAL and maintaining -250 psig, or letdown is isolated due to a failure of PCV-135 to respond in AUTO.

Required Materials:

None General

References:

S-3.2E, PLACING IN OR REMOVING FROM SERVICE NORMAL LETDOWN/EXCESS LETDOWN, Revision 02603 2012 SROI Retake NRC Exam JPM-C

Appendix C Page 3 of 22 Form ES-C-1 JPM WORKSHEET Handouts:

S-3.2E, PLACING IN OR REMOVING FROM SERVICE NORMAL LETDOWN/EXCESS LETDOWN, Revision 02603 (Marked up copy)

Initiating Cue:

  • The Shift Manager directs you to return Normal Letdown to service per Section 6.3 of S-3.2E, PLACING IN OR REMOVING FROM SERVICE NORMAL LETDOWN/EXCESS LETDOWN, using the 40 GPM orifice
  • After Normal Letdown is in service, remove Excess Letdown from service
  • If an auto makeup occurs, the other board operator will monitor the auto makeup using S-3.1 Validation Time:

18 minutes (4/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Lifting of the letdown line relief valve, RV-203 Possible damage to letdown line SAFETY CONSI DERA TIONS:

Rotating equipment INSTRUCTOR NOTES:

  • Indicate reason for unsatisfactory performance in the comment section below each step.

Make available a copy of S-3.2E to the Operator at the appropriate cue, signed off/initial per setup notes.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI Retake NRC Exam JPM-C

Appendix C Page 4 of 22 Form JPM WORKSHEET SIMULATOR SETUP

  • Select IC-19, 100% MOL, or ANY at-power IC Remove Normal Letdown from service per Section 6.2 of S-3.2E Place Excess Letdown in service per Section 6.1 of S-3.2E
  • Shift to single running charging pump CA") in AUTO in step 6.1.13 Ensure VCT level is at -35%
  • Insert MALF CVC07 A, 0% open, Trigger 1. (Letdown pressure control valve PCV-135 failure with MANUAL control available)

PROCEDURAL MARKUPS:

Markup the procedure Sections 6.1, 6.2, and 6.5 2012 SROI Retake NRC Exam JPM-C

Appendix C Page 5 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a..JJ Start Time:

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performs page check of S-3.2E procedure provided N/A Reviews the procedure Provide Operator with a clean copy of S-3.2E Review Table of Contents of procedure to ensure correct section to be performed.

Table of Contents Identifies section 6.3, Placing Normal Letdown In Service, is required per the Initiating Cue.

None 2012 SROI Retake NRC Exam.JPM-C

Appendix C Page 6 of 22 Form ES-C-1

.JPM VERIFICATION OF COMPLETION Performance Step: 3 Review PRECAUTIONS AND LIMITATIONS section of procedure.

Procedure Step:

4.0 Standard

N/A Evaluator CUE:

None Comment:

Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Reviews PREREQUISITES section of procedure.

Section 5.0, PREREQUISITES Ensures PREREQUISITES section of procedure is completed None Initial Conditions have provided information that the setpoint of TCV-130 has been verified to be 100°F 2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 5 Procedure Step:

Standard:

Evaluator's Cue:

Evaluator NOTE:

Comment:

Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION Placing Normal Letdown In Service NOTE and CAUTIONS prior to Step 6.3.1 N/A None From the Initial Conditions, flush is not required based on isolation time. Letdown line has been isolated for 40 minutes and has not been drained. Section 6.5 of procedure should be "N/A."

Determine if a flush is required:

  • If the letdown line has been isolated for less than one hour perform section 6.4 and N/A section 6.5, with the permission of the Shift Manager or Control Room Supervisor.

If the letdown line has been isolated for greater than one hour perform section 6.5 and N/A section 6.4, with the permission of the Shift Manager or Control Room Supervisor.

6.3.1

  • Determines flush NOT required based on isolation time and Initial Conditions provided
  • Recognizes that Section 6.5 should be "N/A"
  • Proceeds to section 6.4, RESTORE LETDOWN WITHOUT A FLUSH None 2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 8 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION ENSURE letdown is secured PER Section 6.2 prior to restoring.

6.4.1.1 Proceeds to section 6.2, Removing Normal Letdown From Service None PLACE Charging Pumps in MANUAL.

6.2.1 Place 'A' Charging Pump Speed Controller in MANUAL.

None ENSURE CLOSED Letdown Orifice isolation valves.

C AOV-200A r:.

AOV-200B

=

AOV-202 6.2.2 Verifies associated MCB valve control switches in CLOSE, green lights ON, red lights OFF.

None 2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 10 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 9 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION CLOSE LTDN ISOLATION VLV RHR to NRHX, AOV-427.

6.2.3 Verifies MCB valve control switch for AOV-427 in CLOSE (green light ON, red light OFF).

None Taking Normal Letdown OOS previously has closed AOV 427 Performance Step: 11 NOTE prior to Step 6.2.4 Procedure Step:

NOTE prior to Step 6.2.4 Standard:

Observes NOTE Evaluator CUE:

None Comment:

2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 12 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 13 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 14 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 10 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION REDUCE charging flow while throttling closed charging flow to Regenerative Heat Exchanger HCV-142 to maintain greater than 20" RCP labyrinth seal L'lP.

6.2.4 Observes labyrinth seal uP and MCB HCV-142 controller at 100% demand.

None Candidate may adjust charging speed to maintain labyrinth seal.b.P greater than 20 inches.

CLOSE LETDOWN ISOL VLV RHR TO NRHX AOV-371.

6.2.5 Observes MCB valve control switch in CLOSE, green light ON, and red light OFF.

None Read Caution prior to Step 6.2.6.

CAUTION prior to Step 6.2.6 Observes CAUTION None 2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 15 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 16 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 11 of 22 Form ES-C-1

.JPM VERIFICATION OF COMPLETION PLACE NRHX LTDN OUTLET TEMP (TI-130) TCV-130 in MANUAL! CLOSED.

6.2.6

  • Observes MCB TCV-130 controller selected to MANUAL with a closed demand signal;
  • Returns to section 6.4.1.2 None IF charging flowpath to Loop B COLD Leg is desired (preferred method),

THEN PERFORM the following:

a. ENSURE CLOSED CHARGI NG VLV RHX TO LOOP B HOT, AOV-392A.
b. OPEN CHARGING VLV RHX TO LOOP B COLD LEG AOV-294.

6.4.1.2 Determines charging flowpath should be to (normal) Loop B COLD Leg.

If requested, feedback charging flowpath to Loop B COLD leg is desired.

2012 SROI Retake NRC Exam JPM-C

Appendix C Page 12 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 17

a. ENSURE CLOSED CHARGING VLV RHX TO LOOP B HOT, AOV-392A.

Procedure Step:

6.4.1.2 a Standard:

Observes MCB valve control switch in CLOSE, green light ON, red light OFF.

Evaluator CUE:

None Comment:

Performance Step: 18 OPEN CHARGING VLV RHX TO LOOP B COLD LEG AOV-294 Procedure Step:

6.4.1.2 b Standard:

Verifies that AOV-294 is already open: red light ON, green light OFF Evaluator CUE:

None Comment:

2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 19 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 20 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 13 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION START a second Charging Pump at minimum speed.

6.4.2

  • Ensure associated pump controller demand to minimum;
  • Rotates pump control switch to START;
  • Verifies red light ON, green light OFF, red flag visible, and charging flow rising on MCB F1128C.

If requested, feedback "AO reports pump is ready to start and all personnel are clear of the pump."

Read CAUTION prior to step 6.4.3 CAUTION prior to Step 6.4.3 Determines CAUTION is not applicable since AOV-392A flowpath is not aligned.

None 2012 SROI Retake NRC Exam JPM-C

Appendix C

...J Performance Step: 21 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 22 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 14 of 22 Form ES-C-1

..IPM VERIFICATION OF COMPLETION SLOWLY OPEN charging flow to Regenerative Heat Exchanger HCV-142 to reduce labyrinth seal liP to - 40".

6.4.3

[V)'$loVi/ly5raises HCV;-142c:(mtr,0U&r,,~I~roar:td,toopen.valve and r,ed£1c~MOB0fat)yrni}fhs~all?8¢ifa\\pjt0It~4Q/h6hes(pll31n24);

None ADJUST Charging Pump speed while maintaining - 40" labyrinth seal liP UNTIL HCV-142 is fully OPEN.

6.4.4

  • Alternately adjusts charging pump speed and opens HCV 142 until HCV-142 is full open with -40 inches labyrinth seal delta P (PI131/124).

None 2012 SROI Retake NRC Exam JPM-C

Appendix C

--,/.

Performance Step: 23 Procedure Step:

Standard:

Evaluator CUE:

Comment:

--,/

Performance Step: 24 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 15 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION ESTABLISH greater than or equal to 22 gpm charging line flow.

6.4.5 None IF placing 40 GPM orifice in service THEN PERFORM the following:

1. PLACE LOW PRESS L TDN PRESS PCV-135 in MANUAL at - 40% open.

6.4.6.1

  • ["] PJacesPCV-1~?~<;ontroUerinMANUALGll1d

[.,J]0pens.valveto"'40~y*asdeterminedbycontroIJer output indication.

Insert MALF CVC07 A, 0% Open on Trigger 1 2012 SROI Retake NRC Exam JPM-C

Appendix C

--J Performance Step: 25 Procedure Step:

Standard:

Evaluator CUE:

Comment:

<:1 Performance Step: 26 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 16 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION IF placing 40 GPM orifice in service THEN PERFORM the following:

2. PLACE NRHX LTDN OUTLET TEMP (TI-130)

TCV-130 in MANUAL at -40% open.

None OPEN LETDOWN ISOL VLV RHR TO NRHX AOV-371.

6.4.8

[~l RotatesAOV':'371 MCB control switch to OPEN Verifies red light ON, green light OFF None 2012 SROI Retake NRC Exam JPM-C

Appendix C Performance Step: 27 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 28 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 17 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION PLACE L TON LOOP B COLD LEG TO RHX AOV-427 to OPEN and THEN to AUTO.

6.4.9

.:r-JIRo~ates AOV--4:21~N{tce#(.mjlCorswitch to OPEN Verifies red light on, green light off.

l;)rR6tates :sWJf&tY:~~~~~t)

None Step 6.4.11 SHOULD be performed promptly after Step 6.4.10 to prevent overpressurization of letdown line NOTE prior to 6.4.10 Observes note prior to 6.4.10 None 2012 SROI Retake NRC Exam..JPM-C

Appendix C Page 18 of 22 Form ES-C-1 Performance Step: 29 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 30 Procedure Step:

Standard:

Evaluator CUE:

Comment:

~IPM VERIFICATION OF COMPLETION OPEN desired Letdown orifice valve AOV-200A, AOV-200B, or AOV-202 AND MARK AOV's not opened N/A AOV-200A AOV-200B AOV-202 6.4.10 r~J~~Rlru~~;AOV:~2ocrA:~~r:$r\\~Q~~()~~WitCtl;f()()REN Verifies red light ON, green light OFF If requested, direct AOV~200A be placed in service.

Candidate should proceed to next step without delay.

ADJUST LOW PRESS LTDN PRESS PCV-135 to achieve Letdown pressure of -250 psig on PI-135.

6.4.11 Adjusts PCV-135 controller to -250 (+1-20) psig (PI135) without alarming annunciators A-3, A-4, A-11, A-12 or A-19 None NRC EXAMINER: ALTERNATE PATH BEGINS WITH THE NEXT 2012 SROI Retake NRC Exam JPM-C

Appendix C

-I. Performance Step: 31 Procedure Step:

Standard:

Evaluator'S Cue:

Comment:

Performance Step: 32 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Terminating Cue:

Stop Time:

Page 19 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION PLACE LOW PRESS LTDN PRESS, PCV-135IN AUTO.

6.4.12

  • Places PCV-135 controller in AUTO;
  • [~:

. Blet9o~hri?e 1'*.prAR~A~3~,alafm

~E' an

  • If requested, direct Operator to place PCV-135 in MANUAL and control pressure to -250 (+1-20) psig.
  • Note that Operator may use guidance contained with AR A-11 and/or AR-A-3 to respond to failure.

Place PCV-135 in MANUAL; control pressure at -250 (+1-20) psig. or isolates letdown Previous Step 6.4.11

[,,],Places PCV-135*in MANUAL;

  • Controls pressure at -250 (+/- 20) psig, OR
  • [-.JIlsolates letdown by closing AOV-427, LETDOWN ISOLATION VL V RHR to NRHX None Either action above is an acceptable response "No further action required."

2012 SROI Retake NRC Exam JPM-C

Appendix C Page 20 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION JR004.012. Rev. 0 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Place Letdown in Service TASK:

004-004-02-04, Place Letdown in Service Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE D YES NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this.JPM and determined to be:

SATISFACTORY D UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC Exam JPM-C

i Appendix C Page 21 of 22 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Procedure Basis for Critical Step Step Step 21 S-3.2E, 6.4.3 Required switch action(s) to perform correctly 23 S-3.2E, 6.4.5 I Required switch action(s) to perform correctly 24 I S-3.2E, 6.4.6.1 Required switch action(s) to perform correctly 25

  • S-3.2E, 6.4.6.2
  • Required switch action(s) to perform correctly 26 S-3.2E, 6.4.8 Required switch action(s) to perform correctly 27 S-3.2E, 6.4.9 Required switch action(s) to perform correctly 29 S-3.2E, 6.4.10 Required switch action(s) to perform correctly 31 S-3.2E,6.4.12 Required action necessary to take corrective actions 32 S-3.2E, 6.4.11 Required action to mitigate failure response i

I 2012 SROI Retake NRC Exam JPM-C

Appendix C Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

JPM CUE SHEET

  • The plant is at power with the normal letdown system secured
  • Excess letdown is in service with one Charging Pump in operation
  • The letdown line has been isolated for 40 minutes and was not drained
  • A flush is NOT required
  • The Shift Manager directs you to return Normal Letdown to service per Section 6.3 of S-3.2E, PLACING IN OR REMOVING FROM SERVICE NORMAL LETDOWN/EXCESS LETDOWN, using the 40 GPM orifice
  • After Normal Letdown is in service, remove Excess Letdown from service
  • If an auto makeup occurs, the other board operator will monitor the auto makeup using S-3.1 2012 SROI Retake NRC Exam JPM-C

Appendix C Page 2 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION Facility:

Ginna Task No.:

012-003-05-01 Task

Title:

Perform Immediate Actions of E-O JPM No.:

2012 Retake N-D with SI KIA

Reference:

EPE007 EA2.02 (4.3/4.6)

Alternate Path Yes X

No Ability to determine or interpret the Time Critical Yes No X

following as they apply to a reactor trip: Proper actions to be taken if the automatic safety functions have not taken place.

Category: RO/SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is stable at 100 percent power.

No equipment is out of service.

Task Standard:

Successfully complete all Immediate Actions in E-O from memory AND perform required actions for failed component in Att.-27.0.

Required Materials:

None General

References:

E-O, REACTOR TRIP OR SAFETY INJECTION, Rev 04500 Att-27.0, AUTOMATIC ACTION VERIFICATION, Rev 00200 Handouts:

Att.-27.0 (when directed by E-O, Step 6) 2012 SROI Retake NRC JPM-D

Appendix C Page 3 of 14 Form ES-C-1

~IPM VERIFICATION OF COMPLETION Initiating Cue:

You are the HCO assigned the monitoring function.

Validation Time:

6 min (4/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Timelines and assumptions made in UFSAR are invalidated.

SAFETY CONSI DERA TIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

Per ES-603, Section C.1.d, JPMs that test the immediate action steps are acceptable.

However, JPMs should not solely test fA steps, and should include testing additional steps or items that are not from memory.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the ~IPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI Retake NRC JPM-D

Appendix C Page 4 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION SIMULATOR SETUP IC-19 100% MOL GENOa, ['A' DIG], Autostart failure RPS11-B1, [isol signal only], CI failure AOV-5738 RPS11-B2, [isol signal only], CI failure AOV-5737 RPS11-E3, [isol signal only], CI failure AOV-5735 RPS11-E4, [isol signal only], CI failure AOV-5736 After the individual has taken the watch:

51S01, [Train A], Inadvertent 81 train "An only, Trigger 1 EDS01A, Loss of circuit 7T, Trigger 1 RC505B, RCP 1 B trip, Trigger 1 2012 SROI Retake NRC JPM-D

Appendix C Page 5 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a>lJ Start Time: ___

Performance Step: 1 Verify Reactor Trip Procedure Step:

Step 1 (IA)

Standard:

Check at least one train of Reactor trip breakers open Trip A and/or Trip B indicating lights green Checks MRPI indicating all rods on the bottom

  • Checks Neutron flux lowering (IR Current NI-35B, NI 368) (lR SUR NI-35D, NI-36D)

Evaluator CUE:

None Comment:

Performance Step: 2 Verify Turbine Stop Valves - CLOSED.

Procedure Step:

Step 2

  • Checks both Turbine Stop Valves (SVL and SVR)

Standard:

indicate Closed (GREEN) on EH valve status panel Evaluator CUE:

None Comment:

2012 SROI Retake NRC JPM-D

Appendix C Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 6 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION Verify both trains of AC Emergency Buses energized to at least 440 Volts.

Step 3

  • r"r Ch.ecks BUs 14ahd BU~18busesare deenergized
  • Checks Bus 16 and Bus 17 voltmeters >440 Volts None Attempt to start the "A" Diesel Generator Step 3 RNO
  • NrOepresses the "AI} Diesel Generator start push botton
  • Verifies the "A" diesel starts and loads buses 14 and 18 None The MALF inserted was Auto-start failure ONLY 2012 SROI Retake NRC JPM-D

Appendix C Page 7 of 14 Form ES-C-1

~IPM VERIFICATION OF COMPLETION Performance Step: 5 Procedure Step:

Standard:

Comment:

Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Verify both trains of AC Emergency Buses energized to at least 440 Volts.

Step 3 Checks Bus 14 and Bus 18 voltmeters >440 Volts Checks Bus 16 and Bus 17 voltmeters >440 Volts Check if SI is actuated:

a. Any 81 Annunciator - LIT Step 4.a
  • Verifies no 81 annunciator is lit by checking D-19, D-21, D-22 and D-28 extinguished None The referenced annunciators relate to plant parameter inputs to auto SI. The "Inadvertent SI on Train A" malfunction does not result in any of these alarms.

2012 SROI Retake NRC JPM-D

Appendix C

.,j Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 8 of 14 Form ES-C-1

..IPM VERIFICATION OF COMPLETION Manually actuate SI and CI Step 4.a RNO Checks various SI set point conditions

[~l~Operator*fecognizesthat()n[y *~A"*trajn ofSI*has started Labd CImanual push buttons to None Check if SI is actuated:

b. SI sequencing - BOTH TRAINS STARTED Step 4.b
  • Checks BOTH SI trains have actuated (multiple indications).
  • Operator should announce that "Immediate Actions Are Complete" IF the student stops after the IA are completed, inform him that "this JPM is not yet complete."

Previous experience with only IA JPMs may condition the students to stop after Step 4 is completed.

2012 SROI Retake NRC JPM-D

Appendix C Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 9 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION o Verification of Steps 1-4 using the procedure o Verification that CNMT spray is not required (Step 5) o Performance of Att.27, AUTOMATIC ACTION VERIFICATION (Step 6)

Steps 5 & 6 None "The CRS has verified the Immediate Action steps and completed Step 5."

"You have been directed to perform Att.-27.0" Performance Step: 10 Verify 81 and RHR pumps running Procedure Step:

Att.-27.0, Step 1 Standard:

Checks that all 81 pumps - RUNNING Checks both RHR pumps - RUNNING Evaluator CUE:

None Comment:

2012 8ROI Retake NRC JPM-D

Appendix C Performance Step: 11 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 12 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 10 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION Verify CNMT RECIRC fans Running Att.-27.0, Step 2

  • Checks all fans RUNNING Charcoal filter dampers green lights Extinguished None Check if Main Steamlines Should 8e Isolated:
a. Any MSIV - OPEN
b. CNMT pressure - LESS THAN 18 PSIG
c. Check if any MSIV should be isolated:

o Low Tavg (545°) AND high steam flow (0.5x106 Ib/hr) from either S/G, or o High-high steam flow (4.4x1 06 Ib/hr) from either S/G

d. Verify MSIV closed on affected S/G Att.-27.0, Step 3 Recognizes that MSIVs are closed ('A' closed on the loss of

'8' Instrument 8us and '8" closed on HI-HI steam flow + SI when all of the steam demand shifted to '8' S/G)

  • Goes to Step 4 None 2012 SROI Retake NRC JPM-D

Appendix C Page 11 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION

...J.* Performance Step: 13 Verify MFW Isolation:

a. MFW pumps - TRIPPED
b. MFW Isolation valves - CLOSED
c. S/G blowdown and sample valves CLOSED Procedure Step:

Att.-27.0, Step 4 Standard:

  • Recognizes that both MFPs are tripped
  • Recognizes 80th MFW isolation valves are closed

.:{

.')i*~~~~,SaiTIprevai\\fes are!opeJl; Evaluator CUE:

None Comment:

Terminating CUE:

No further actions are required.

Stop Time: ___

2012 SROI Retake NRC JPM-D

Appendix C Page120f14 Form ES-C-1 JPM VERIFICATION OF COMPLETION JR012.012, Rev. 2 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Perform Immediate Actions of E-O with SI TASK:

012-003-05-01, Perform Immediate Actions of E-O with SI Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE YES NO PERSONNEL ACTIONSIINACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

SATISFACTORY D UNSATISFACTORY DATE:

EVALUATOR'S SIGNATURE:

2012 SROI Retake NRC JPM-D

I Appendix C Page 13 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Step Procedure Step Basis for Critical Step 3

E-O, step 3 Required to recognize condition to perform step correctly 4

E-O, step 3 RNO Required switch action(s) to perform Immediate Action correctly 7

E-O, step 4 Required to recognize condition to perform step correctly E-O, step 4 RNa equired switch action(s) to perform Immediate Action correctly 13 ATI-27.0, step 4c Required to recognize condition to perform step correctly ATT-27.0, step 4c Required to complete containment isolation RNO I

2012 SROI Retake NRC JPM-D

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

The plant is stable at 100 percent power No equipment is out of service INITIATING CUE:

You are the HCO assigned the monitoring function 2012 SROI Retake NRC JPM-D

Appendix C Job Performance Measure ES-C-1 Facility:

Ginna Task No.:

026-008-05-01 Task

Title:

Secure Containment Spray

  • .lPM No.:

2012 Retake N-E KIA

Reference:

026 A4.01 (4.5/4.3)

Alternate Path: YES NO X CNMT Spray System: Ability to Time Critical:

YES NO ~

manually operate and/or monitor in the control room: CSS controls Category:

RO/SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Plant has experienced a large break LOCA The crew has completed E-O, REACTOR TRIP or SAFETY INJECTION, and is at Step 13 of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Task Standard:

Both CS Pumps secured with system controls and valves properly aligned.

Required Materials:

A marked up copy of E-1 completed to Step 13 available in the simulator.

General

References:

E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Revision 04100 Handouts:

, pages 1-14, marked up to and including Step 12 Initiating Cue:

Perform Step 13 of E-1.

  • Another board operator will respond to alarms NOT associated with the task.

Time Critical Task:

No Validation Time:

8 Minutes 2012 SROI Retake NRC JPM E

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP Reset to IC-19 or any at-power Initial Condition Insert MALF RCS03A (Loop A hot leg DBA), RCS03B (Loop A cold leg DBA), RCS03C (Loop B hot leg DBA), OR RCS03D (Loop B cold leg DBA)

Perform and placekeep the actions of E-O, transition to E-1, and complete the actions of E 1 up to and including Step 12

  • Allow simulator to run until CNMT pressure is < 4 psig and 0-28, CNMT PRESSURE 4 PSI, is extinguished NOTE: Use of a large (e.g., 5000-6000 gpm) break may save time in bringing CNMT pressure down below 4 psig assumed in the initial cue.

2012 SROI Retake NRC JPM E

Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a :..J)

Start Time: ____

Performance Step: 1 Procedure Step:

Standard:

Examiner CUE:

Examiner NOTE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Examiner CUE:

Examiner NOTE:

Comment:

Reviews marked-up procedure and FOLDOUT page E-1 Steps 1-12 N/A None Provide a copy of E-1, Step 13 (Pgs.1-14), properly place kept up to Step 13 Monitor if CNMT Spray Should Be Stopped:

a. CNMT spray pumps - ANY RUNNING E-1, Step 13.a
  • Observes red light LIT for each of two (2) CS pumps
  • Observes CS flow on FI-930 None Provide a copy of E-1, Step 13 (Pgs. 1-14), properly place kept up to Step 13 2012 SROI Retake NRC JPM E

Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 2 Monitor if CNMT Spray Should Be Stopped:

a. CNMT Spray Pumps ANY RUNNING
b. Determine number of CNMT spray pumps required from table:

CNMT CNMT CNMT RECIRC FA\\l~

SPRAY PUMPS PRESSURE RUNNING REQUIRED TER THAN 60 PSIG 2

BETWEEN 4 PSIG AND 60 PSIG 2

AND RISING BETWEEN oor 1 2

4 PSIG AND 60 PSIG AND LOWERING 2,3,or4 1

LESS THAN 4 PSIG 0

I Procedure Step:

Step 13.b Standard:

  • Identifies that CNMT pressure is less than 4 PSIG on PI-944, PI-945, PI-947, & PI-949 and lowering and observes 0-28, CNMT PRESSURE 4 PSI, extinguished
  • Determines four (4) CRFs are running by observing red lights LIT
  • [:it* Usin~thevClluesfor,C~MJ pressyreandthe.number of CNM1;.R~~ircr::ans*running;'determiries*.O**CNMT Spray PUtTlPS arerequired Examiner CUE:

None Evaluator NOTE:

Any combination of CNMT pressure indicators is acceptable to determine the value/trend of CNMT pressure.

Comment:

2012 SROI Retake NRC JPM E

Appendix C Page 6 of 11 Form PERFORMANCE INFORMATION NRC EXAMINER: ALTERNATE PATH BEGINS WITH THE NEXT Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Monitor if CNMT Spray Should Be Stopped:

c. CNMT spray pumps running EQUAL TO NUMBER REQUIRED Step 13.c
  • Observes 2 CS pumps running using the red light LIT for each pump.
  • Recalls no CS pumps are required per Table in step 13.b.
  • Proceeds to step 13.c. RNO None Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Stop CNMT spray pumps as necessary to meet table requirements:

IF CNMT spray pump is to be stopped, THEN perform the following:

1) Place CNMT Spray Pump in PULL STOP Step 13.c.1) RNO

[.J];~()tClt~s<handlesc()unter-cloCkwiseand then pulls out to the locked position on EACH of the following pumps:

  • [41CS pump A
  • [4J CSPumpB None 2012 SROI Retake NRC JPM E

Appendix C

..J Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

..J Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION IF CNMT pressure < 4 psig, THEN perform the following:

a. Place NaOH Tank outlet valve switches to OPEN
  • AOV-836A
  • AOV-836B Step 13.c.2)a) RNO None Considered critical because it properly aligns the valves in the event that CS Pumps must be manually started should CNMT pressure start to rise.

Reset CNMT spray Step 13.c.2)b) RNO

[..J}Depresse.stheQNMTSpray Reset green pushbutton on the.vertiCalsectioh*ofMCB Checks that A-27, CNMT SPRAY, has cleared None 2012 SROI Retake NRC JPM E

Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Close discharge valves for idle CNMT Spray Pump:

  • CS Pump 'N MOV-860A MOV-860B

-OR

  • CS Pump 'B' MOV-860C MOV-860D Performance Step:

E-1, Step 13.c.2)c) RNa Standard:

~alVe.~

l.JQ1cp~)1y;tC)t~ting

.'i:t':j*[N1:~.MQ~ij§QB

."," 'l"lfJvlQYia$QC

[~;MID\\I;;86bD Evaluator CUE:

None Evaluator NOTE:

Considered critical because this action ensures containment isolation.

Terminating Cue:

After closing the four discharge valves or when the operator proceeds to Step 14: Evaluation on this JPM is complete.

Stop Time: ____

2012 SROI Retake NRC JPM E

Appendix C Page 9 of 11 Form JPM CUE SHEET 2012 SRO RETAKE EXAM JPM N-E (Simulator)

LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Evaluate CNMT Spray Flow Requirements During E-1 Performance TASK:

026-008-05-01: Secure Containment Spray Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR IVIISS OCCUR DUE TO INAPPROPRIATE o YES NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this,IPM and determined to be:

o SATISFACTORY 0 UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM E

Appendix C Page 10 of 11 Form ES-C-1

~IPM CUE SHEET CRITICAL STEP BASES STEP: "Those steps that, when not performed correctly, in the proper sequence, I and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

, Performance I Procedure Basis for Critical Step Step Step 2

E-1, step 13.b Required assessment to implement procedural action correctly 4

E-1, step 13.c.1)

Required component manipulation to perform correctly RNO 5

E-1, step 13.c.2)a)

Critical because this action properly aligns the valves in RNO the event that CS Pumps must be manually started should CNMT pressure start to rise.

6 E-1, step 13.c.2)b)

Required component manipulation to perform correctly RNO 7

E-1, step 13.c.2)c)

  • Performance of this step ensures CNMT isolation RNO I

,~.....

I -_.......

I i

I i

i 2012 SROI Retake NRC "IPM E

Appendix C Page 11 of 11 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

Plant has experienced a large break LOCA The crew has completed E-O, REACTOR TRIP or SAFETY INJECTION, and is at Step 13 of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

INITIATING CUE:

Perform Step 13 of E-1.

  • Another board operator will respond to alarms NOT associated with the task.

2012 SROI Retake NRC JPM E

Appendix C Page 2 7

Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

029-007 01 Task

Title:

Startup the Containment Mini Purge

~IPM No.:

JR029.001 KIA

Reference:

029 A2.03 (2.7/3.1) CNMT Purge Alternate Path:

Yes No

~

System: Ability to predict the impacts of the following malfunctions or operations on the CNMT purge system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated valve lineups Time Critical:

Yes No X

Category:

RO/SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The Unit is operating at 100% power.

  • A routine Containment entry is scheduled for tomorrow.
  • A Containment Mini-Purge Release has been initiated by Radiation Protection (RP)
  • SM and RP approvals have been received
  • All RMS channels are operating normally

Mini-purge is secured after R-14 indicates an Alarm condition.

Required Materials:

None.

2012 SROI Retake NRC JPM N-F

Appendix C Page 3 of 17 Form ES-C-1 General

References:

Handouts:

Initiating Cue:

JPM WORKSHEET

  • S-23.2.3, CONTAINMENT MINI-PURGE SYSTEM OPERATION, Rev 12
  • AR-E-16, RMS PROCESS MONITOR HIGH ACTIVITY, Rev 11 AR-RMS-14, R14 VENT GAS, Rev 8 S-23.2.3
  • The Shift Manager directs you to place the Containment Mini-Purge System in service in accordance with S-23.2.3, CONTAINMENT MINI-PURGE SYSTEM OPERATION Validation Time: 13 minutes (04/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Possible release greater than approved release limits.

SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

Make available a copy of S-23.2.3 to the Operator at the appropriate cue.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the ~IPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues, the ~IPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this ~IPM?

2012 SROI Retake NRC JPM N-F

Appendix C Page 4 of 17 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP IC-19, but ANY at-power IC will work

  • Verify Containment Mini-Purge System is secured in selected IC Set Trigger 30 conditional on taking the CNMT Mini-Purge Supply Blower to START: set x08i074b==1 Set MALF RMS02D, 1.3EOS, 60 second ramp, 30 second delay on Trigger 30 (The HIGH alarm setpoint for R-14, per P-9, is 1.2ES and the release rate limit is 3.0ES.)

2012 SROI Retake NRC JPM N-F

Appendix C Page 5 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a-V)

Start Time:

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Reviews Initial Conditions and Initiating Cue, obtains a current revision of S-23.2.3.

N/A N/A Provide Operator a copy of S-23.2.3.

Containment Radiation Monitoring R-11 or R-12 are operating.

3.1 Confirms via RMS panel indications that both R-11 and R-12 are operating.

None Candidate may take time to set up PPCS displays to trend RMS values and/or CNMT pressure.

Either Auxiliary Building Iodine Radiation Monitor R-1 OB or R-14A is operable.

3.2 Confirms via panel indications that R-10B or R-14A (PPCS) are operable.

None 2012 SROI Retake NRC JPM N-F

Appendix C Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 6 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Auxiliary Building Radiation Monitor R-13 is operating or samples are continuously collected with auxiliary equipment.

3.3 Confirms via panel indications that R-13 is operating.

None If either R-11 or R-12 is inoperable, ensure requirements of LCO 3.6.3, Actions Note 1 are met, otherwise N/A 3.3.1 Confirms via panel indications that both R-11 and R-12 are operable, and uN/As" this step.

None At least one containment recirculation fan is running.

3.4 Describes/points out the MCB indications for each of the four (4)

CNMT RECIRC FAN switches that at least one containment recirculation fan is running (red light LIT).

None 2012 SROI Retake NRC JPM N-F

Appendix C Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 17 Form ES-C-1

,JPM VERIFICATION OF COMPLETION Plant ventilation system operating.

3.5 Confirms that annunciator L-1, AUX BLDG VENT SYSTEM CONTROL PANEL, is NOT lit When asked as AO, "Aux Bldg ventilation systems are lined up normally and operating properly."

There are no Aux Bldg plant ventilation component indications or controls available in the MCR, so candidate should:

  • Contact the primary AO for confirmation
  • Check L-1 not lit Containment mini-purge release has been initiated by Radiation Protection and approved by the Shift Manager and either Radiochemist or Health Physicist.

3.6,3.7,3.8 Confirms via Initial Conditions provided that:

  • The mini-purge release has been initiated by Radiation Protection
  • SM has approved
  • RP approval has been obtained If queried, confirm "mini-purge release initiated by Radiation Protection."

2012 SROI Retake NRC JPM N-F

Appendix C Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 10 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 11 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 8 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Auxiliary Building Radiation Monitor R-14 is operating or grab samples are being taken at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and these samples analyzed for isotopic activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or if RM 14A is operable a review of data from channel 5 "Low Range Noble Gas" is performed at least every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

3.9 Observes via panel indication that R-14 is operating None PRECAUTIONS 4.1 through 4.7 Reviews each Precaution Verifies R-11 and R-12 below release limits prior to release None Precaution 4.5, "Secure the mini-purge system if either R-13, R-14, or R-14A goes into alarm (except during performance of PT-17.2 or PT-12.5)" is the one to be exercised during this JPM Verify Mini Purge Roof Vent Isolation Valve, V-7479, locked closed.

5.1.1 Directs Secondary AO to verify V-7479 locked closed.

When requested: "Secondary AO reports that V-7479 is locked closed."

2012 SROr Retake NRC JPM N-F

Appendix C

y. Performance Step: 12 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 13 Procedure Step:

Standard:

Evaluator CUE:

Comment:

y Performance Step: 14 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 9 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Open Mini Purge Exhaust Valve, AOV-7970. (Inside CNMT) 5.1.2

['J} RotatesAOV-791Q¥~Jv~contr9Iswitch to OPEN Verifies red light ON, green light OFF None The mini-purge components are located BEHIND the left hand section of the MCB Open Mini Purge Exhaust Valve, AOV-7971. (Outside CNMT) 5.1.3

  • . [V] Rotate,s.AOVC?7.97t¥~IV~:~c~Vttot$witchto OPEN Verifies red light ON, green light OFF None Open Mini Purge Supply Valve, AOV-7478. (Inside CNMT) 5.1.4
  • ["1 Rotates AOV-7478valve control switch to OPEN Verifies red light ON, green light OFF None 2012 SROI Retake NRC JPM N-F

Appendix C Page 10 of 17 Form ES-C-1

c",,~

Performance Step: 15 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 16 Procedure Step:

Standard:

Evaluator CUE:

SIM DRIVER:

Comment:

JPM VERIFICATION OF COMPLETION Open Mini Purge Supply Valve, AOV-7445. (Outside CNMT) 5.1.5

  • ... [>4} Rotates AO\\l37445tvalve;cpcitr(}Lswitchto OPEN Verifies red light ON, green light OFF None NOTE: Blower discharge valve AOV-7480 will stroke open on blower start NOTE prior to Step 5.1.6 Reads NOTE None ENSURE that Trigger 30 is activated in the next step 30 seconds after the Mini-Purge Supply Blower is started NRC EXAMINER: ALTERNATE PATH BEGINS WITH THE NEXT STEP 2012 SROI Retake NRC JPM N-F

Appendix C Page 11 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION

'. ~ Performance Step: 17 Start 1A Mini-Purge Supply System Blower and verify Containment pressure increase. (Pressure should rise in 4-5 minutes)

Procedure Step:

5.1.6 Standard

-1"1 Momentadlyrot~tes'bloWercoT1trolswitc:h to START

  • Verifies blower red light ON, green light OFF, red flag visible
  • Monitors MCB Containment pressure (PI-945/947/949) indication
  • Logs Purge STARTTIME ___

Evaluator CUE:

None Evaluator NOTE:

C-17, CONTAINMENT VENT SYSTEM, will alarm momentarily during blower start Comment:

Performance Step: 18 R-14 Channel Indication Rises to > 1 E+05 HIGH ALARM setpoint Procedure Step:

PRECAUTIONS 4.1 and 4.5 Standard:

Recognizes that R14 is rising

  • Recognizes PPCS R14 alarm
  • Acknowledges E-16, RMS PROCESS MONITOR HIGH ALARM
  • Acknowledges L-1, AUX BLDG VENT SYSTEM CONTROL PANEL, due to AB Ventilation trip due to R14 alarm
  • Informs CRS that he is securing the Mini-Purge per the guidance provided in Precaution 4.5 for R-14 in Alarm
  • Goes to Section 5.2, Securing CNMT Mini-Purge Evaluator CUE:

"The SM understands that you are securing the mini-purge due to an R-14 high alarm."

Evaluator NOTE:

Candidate may also refer to AR-E-16, then to AR-RMS-14, for direction to secure mini-purge if in progress Comment:

2012 SROI Retake NRC JPM N-F

Appendix C Performance Step: 19 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 20 Procedure Step:

Standard:

Evaluator CUE:

Comment:

~ Performance Step: 21 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 12 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION ------........-

NOTE: If Nitrogen is being vented from the SI Accumulators, then DO NOT secure mini-purge operation Section 5.2, NOTE prior to Step 5.2.1

  • Reads NOTE, identifies that NOTE is N/A None Ensure the shutdown of containment mini-purge is authorized by:
  • Shift Manager
  • Health Physicist Step 5.2.1
  • Notes that previous communication to evaluator has identified the need to secure the mini-purge, and the SM has concurred None Stop 1A containment mini-purge supply system blower.

5.2.2

  • ["'1 Momentarily rotates MINI-PURGE SUPPLY blower control switch counter-clockwise to STOP
  • Verifies blower red light OFF, green light ON, red flag not visible
  • Logs Purge STOP TIME ____

None 2012 SROI Retake NRC JPM N-F

Appendix C

,.,j Performance Step: 22 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

.,J Performance Step: 23 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 13 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Close Mini Purge Supply Valve, AOV-7478. (Inside CNMT) 5.2.3

.; ["1 ;Rotates AOV~7478*valve col1trol.switch. counter clocKwisetoGLQSE

  • Verifies red light OFF, green light ON
  • Checks R-14 for indication that release has been terminated None This valve closure, OR the closure of AOV-7445 in the next step, will isolate the CNMT mini-purge supply line Close Mini Purge Supply Valve, AOV-7445. (Outside CNMT) 5.2.4

[-JlRotates AOV*7445 valv~,control switch counter clockwise to CLOSE

  • Verifies red light OFF, green light ON None This valve closure, OR the closure of AOV-7478 in the previous step, will isolate the CNMT mini-purge supply line 2012 SROI Retake NRC JPM N-F

Appendix C

-I. Performance Step: 24 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

" Performance Step: 25 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Terminating Cue:

Stop Time:

Page 14 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION Close mini-purge exhaust valve, AOV-7970. (Inside CNMT) 5.2.5

[;iJRotates,AOV-:-79]:1valve controlswitch counter clockwise,toCtOSE

  • Verifies red light OFF, green light ON None This valve closure, OR the closure of AOV-7971 in the next step, will isolate the CNMT mini-purge exhaust line Close mini-purge exhaust valve, AOV-7971 (Outside CNMT) 5.2.6
  • H] Rotat~sAQV..7971valve control switch counter clockwise to CLOSE
  • Verifies red light OFF, green light ON None This valve closure, OR the closure of AOV-7970 in the previous step, will isolate the CNMT mini-purge exhaust line "No further action is required."

2012 SROI Retake NRC JPM N-F

Appendix C Page 15 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION JR029.001, Rev. 1 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Startup the Containment Mini Purge and Terminate Upon Indications of HIGH Radiation TASK:

029-007 01, Startup the Containment Mini Purge Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE DYES D NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

D SATISFACTORY D

UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM N-F

Appendix C Page 16 of 17 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Procedure Basis for Critical Step Step Step 12 S-23.2.3, step 5.1.2 Required switch action(s) pt::liullll I

13 S-23.2.3, step 5.1.3 Required switch action(s) to perform correctly 14 S-23.2.3, step 5.1.4 Required switch action(s) to perform correctly 15

  • S-23.2.3, step 5.1.5 Required switch action(s) to perform correctly I

17

  • S-23.2.3, step 5.1.6 Required switch action(s) to perform correctly 21 S-23.2.3, step 5.2.2 Required switch action(s) to perform correctly 220R S-23.2.3, step 5.2.3 Required switch action(s) to isolate CNMT mini-purge supply line 23 S-23.2.3, step 5.2.4 24 OR S-23.2.3, step 5.2.5 Required switch action(s) to isolate CNMT mini-purge 25 S-23.2.3, step 5.2.6 i

2012 SROI Retake NRC JPM N-F

Appendix C INITIAL CONDITIONS:

INITIATING CUE:

Page 17 of 17 Form JPM CUE SHEET

  • The Unit is operating at 100% power.
  • A routine Containment entry is scheduled for tomorrow.
  • A Containment Mini-Purge Release has been initiated by Radiation Protection (RP)
  • SM and RP approvals have been received
  • All RMS channels are operating normally
  • The Shift Manager directs you to place the Containment Mini Purge System in service in accordance with S-23.2.3, CONTAINMENT MINI-PURGE SYSTEM OPERATION 2012 SROI Retake NRC JPM N-F

Appendix C Page 2 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION Facility:

Ginna Task No.:

012-006-01-01 Task

Title:

Defeat a Failed PRZR Pressure "IPM No.:

2012 Retake '"'PM N-G Channel KIA

Reference:

012 A4.04 3.3/3.3 Alternate Path Yes No X

Ability to manually operate and/or monitor in the control room:

Bistable, trips, reset and test switches Time Critical Yes No X

Category:

RO/SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant was operating at 100% power when PI-430 failed high due to PT-430 failure The operators took actions per ER-II\\IST.1, up to step 6.3.4 A Turbine Runback did not occur Task Standard:

Complete the defeat of PRZR Pressure PI-430 without error Required Materials:

Key to Protection Racks General

References:

ER-INST.1, REACTOR PROTECTION BISTABLE DEFEAT AFTER INSTRUMENTATION LOOP FAILURE, Rev 03602 Handouts:

ER-INST.1 (pages 1-16) and Attachment 6 2012 SROI Retake NRC JPM-G

Appendix C Page 3 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION Initiating Cue:

  • The Shift Supervisor directs you to defeat the failed PRZR instrument channel per ER-INST.1, Attachment-6, White Channel Pre-Job Brief has been completed Time Critical Task:

No Validation Time:

15 minutes (04/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

None SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory step performance in the comment section below each step.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.

7 Are there any questions before beginning this JPM?

2012 SROI Retake NRC JPM-G

Appendix C Page 4 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION SIMULATOR SETUP Load IC-19, 100%, MOL Insert MALF PZR02B, [2500 psig]

2012 SROI Retake NRC ~IPM-G

Appendix C Page 5 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with av)

Start Time: ___

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Obtain controlled copy of ER-INST.1.

N/A Obtains controlled copy of ER-INST.1.

Provide the candidate with copy of ER~INST.1., marked up to step 6.3.4, and Attachment G IF PRZR pressure channel failure resulted in a runback, THEN PERFORM the following....

ATT. G, step 1.0

  • Recognizes that per the Initial Conditions, a runback did NOT occur
  • Goes to step 2.0 None Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

NOTE: Performing the following step will remove the affected channel from control of PORV-430 AND inputs to alarms F-2, PRESSURIZER HI PRESS 2310 PSI and F-10, PRESSURIZER LO PRESS 2205 PSI ATT.G, NOTE prior to Step 2.0 Reads NOTE None 2012 SROI Retake NRC JPM-G

Appendix C

.y. Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 6 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION In the PLP PRZR PRESS AND LEVEL rack, VERIFY the PRZR pressure DEFEAT switch P/429A position.

2.1 IF P/429A is in NORMAL, THEN place P/429A to DEFEAT-2 2.2 IF P/429A is NOT in NORMAL, THEN notify the SM ATT.6, steps 2.0 - 2.3

  • Obtains cabinet key, goes to PLP Rack, unlocks and opens

[~'\\lefifyP/429Ajs;inNormal position, turns DEFEAT switch counter -cfockwrsefo DEFEAT -2 position None P/429A is initially in the Normal position NOTE: Performing the following step will defeat the b.T Runback and Rodstop for the failed channel AND remove the associated b.T input from the RI L computer. Annunciators F-30 and F-31 will clear if lit ATT.6, NOTE prior to Step 3.0 Reads NOTE before performing step 3.0 None 2012 SROI Retake NRC JPM-G

-I Appendix C Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION In the RIL INSERTION LIMIT rack, PLACE T/405E DELTA T DEFEAT switch to LOOP A UNIT 2 ATT.6, step 3.0 Unlocks the RIL Rack and opens door.

[~Turns T/405EDELT~::;Tl)EF:EATf switch clockwise from Operateto LOOP A lJnif2'position Closes and locks door None NOTE contains a list of bistable status lights and Annunciators that are expected to be LIT after the defeat ATT.6, NOTE prior to Step 4.0 Reads NOTE before step 4.0 None RECORD the following data:

PRZR Pressure PI-430 2500 LOOP 1A-2.6.T TEMP TI-406B 67 OT.6.T SP1 LOOP 1A-2 TEMP TI-406A 85 ATT.6, step 4.1 Records data from MCB indications None 2012 SROI Retake NRC JPM-G

Appendix C Page 8 of 13 Form ES-C-1 Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Comment:

JPM VERIFICATION OF COMPLETION DETERMINE the expected post defeat Bistable proving light status and circle the expected status in table below:

ATT.G, step 4.2 OVERTEMP TRIP Light OFF !.E TI-4068 <: TI-40BA 430 CHANNEL 2 HIGH PRESS TRIP Light OFF !.E P!-4}() > 23n psig LOW PRESS TRIP Light OFF !.E PI-4}() :5 1873 psig 51 Light OFF !.E PI-4}() s 1750 psig UNBLOCK 81 light OFF !.E PI-430 " 1992 psig Expected Provifl;~

Post Defeat Light Bistable Light status (Cird,,)

Statlls Verifted

~------.~~--=-=-------~-------~

406 LOOP Pr2 i

i G

i ~':::::::~: ! -- :N E)-:--=:=:----+-:______J i HIGH PRESS TRJP i I

\\

1 43{l CHANNEL 2-+'-(3----*1.*.**..

ON OFF

, LOW PRESS TRIP' i

~43{) C'H:~NEl i G OFF ~-----

430 CHANNEL :2 i ON ELFF UNBLOCK 81 i

-'--~-~---'----

.-~.---.~~.-.

None 2012 SROI Retake NRC JPM-G

Appendix C Performance Step: 10 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 11 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 9 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION In the (WHITE) W-1 PROTECTION CHANNEL 2 rack, PLACE the following bistable proving switches to DEFEAT (UP) AND VERIFY the proving light status is correct per the table above.

406 LOOP A-2 OVERTEMP TRIP 430 CHANNEL 2 HIGH PRESS TRIP LO PRESS TRIP 51 UNBLOCK SI ATT.6, step 5.0

[-VJPulis and l'fts.QVERTEMp,.TRIPswitct:l (Light ON)

  • til; Pu!ls:cl6c:t~i~~~*tUGI;i~J:,F~E~m~~BJ~i~'NjtCh.(Light OFF)
  • 'NIPulls~hdlj,ti~ I::bWPRESS/rgip'§i~itth(Light ON)

[-V1Pu!ls'anc:lJiftsLOWPRESSTSJTBII{switch (Light ON)

[-V1 Pulisand.jiftsUNBL.OcKSliswitch (Light OFF)

None PLACE the PRZR pressure recorder switch (MCB) to position 1-3 6.0 Places MCB recorder switch to 1-3 position None 2012 SROI Retake I\\IRC JPM-G

Appendix C Performance Step: 12 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Terminating Cue:

Stop Time:

Page10of13 Form ES-C-1 JPM VERIFICATION OF COMPLETION VERIFY the bistable status lights AND Annunciators listed below are lit 7.0 Verifies correct Bistable Status Light and Annunciator status lights

  • PRZR H~Jh Pres.s PC430A (Trip)
  • PRZR La Press PC430H (Trip)

PRZR La Press PC430E (SI)

  • PRZR Lo Press PC430E-! (51)
  • OTII.TLOOP ATC406C The following Annunciators are expected to be Irt after the DEFEAT:
  • F-26, PRESSURIZER HI PRESS CHANNEL ALERT 2377 PSI F-27, PRESSURIZER LO PRESS CHANNEL ALERT 1873 PSI
  • C-27, PRESSURIZER LO PRESS SI CHANNEL ALERT 1750 PSIG
  • C-28, PRESSURIZER LO PRESS 51 CHANNEL ALERT 1750 PSIG F-23. ReS aT DELTA TCHANNEL ALERT None JPM is complete when the proper bistable indications have been verified.

"No further action is required."

2012 SROI Retake NRC JPM-G

Appendix C Page 11 of 13 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 Retake..I PM N-G LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Defeat a Failed PRZR Pressure Channel TASK:

012-006-01-01, Defeat a Failed PRZR Pressure Channel Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE DYES D NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

D SATISFACTORY D

UNSATISFACTORY EVALUATOR'S SIGNATURE:

DATE:

2012 SROI Retake NRC JPM-G

Appendix C Page 12 of 13 Form ES-C-1

.JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES

.l CRITICAL STEP: 'Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

I Performance Procedure i

Basis for Critical Step Step Step 4

ATT.6, step 2.1 Required switch action(s) to perform task correctly

~......

6 ATT.6, step 3.0 Required switch action(s) to perform task correctly

~-

10 ATT.6, step 5.0 Required switch action(s) to perform task correctly I

I i

i I

2012 SROI Retake NRC JPM-G

~---~~~-

--.~::-::---=---


~-........ ---~-....... ---~~~

Appendix C Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

,JPM CUE SHEET

  • The plant was operating at 100% power when PI-430 failed high due to PT-430 failure The operators took actions per ER-INST.1, up to step 6.3.4
  • A Turbine Runback did not occur
  • The Shift Supervisor directs you to defeat the failed PRZR instrument channel per ER-INST1, Attachment-6, White Channel Pre-Job Brief has been completed 2012 SROI Retake NRC JPM-G

Appendix C Page 2 of 12 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

062-029-05-04 Task

Title:

Energize a Minimum of 100 KW JPM No.:

Backup heaters onto DIG KIA

Reference:

APE056 AA1.03 (3.2/3.3)

Alternate Path Yes No X

Adjustment of EDIG load by selectively energizing PZR backup heaters.

Time Critical Yes No X

Category:

RO/SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant was operating at 100% power when it experienced an SI coincident with a loss of all AC power.
  • The 'B' DIG is now running and carrying approximately 1650 KWon Buses 16 and 17.
  • PRZR level is 20% and stable
  • CNMT pressure is 0.4 psig
  • SI has been RESET Task Standard:

125 KW of pressurizer backup heaters are energized per ER-PRlR.1.

Required Materials:

Hard Hat, Safety Glasses, Hearing Protection, Safety Shoes, gloves and Dosimetry.

General

References:

ER-PRZR.1: RESTORATION OF PRZR HEATERS DURING BLACKOUT, Rev 00700 Drawing 03200-0122, Sheets 1 & 2 Drawing 03200-0123, Sheets 1 & 2 2012 SROI Retake NRC JPM-H

Appendix C Page 3 of 12 Form ES-C-1 JPM WORKSHEET Handouts:

ER-PRZR.1: RESTORATION OF PRZR HEATERS DURING BLACKOUT, Rev 00700 Drawing 03200-0122, Sheets 2 Initiating Cue:

  • The CRS has directed you to energize a minimum 100 KW of PRZR BACKUP heaters per ER-PRZR.1, Section 4.2.

Validation Time:

9 Minutes (4/03/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Equipment Damage SAFETY CONSIDERATIONS:

Radiological Hazard Personal Protective Equipment INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

Make a copy of ER-PRZR.1 available to the Operator at the appropriate cue.

  • Assess Auxiliary Building for radiological and/or personnel safety concerns prior to start of JPM. Validation on 11/20/12 showed a potential problem with the height of panel ACPDPPAB12 (located above ACPDPPAB13). Use the lower panel for both performance steps 7 and 8.

Proper use of H/U tools shall be exhibited for all steps.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. SIMULATE only. Do NOT actually manipulate any plant equipment.
4. Verbalize all your actions and observations while performing the JPM.
5. Where necessary, consider the examiner for peer checks as appropriate.
6. Verbalize when you consider your performance of the JPM complete.
7. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
8. Are there any questions before beginning this JPM?

2012 SROI Retake NRC JPM-H

Appendix C Page 4 of 12 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP N/A 2012 SROI Retake NRC JPM-H

Appendix C Page 5 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a ~)

Start Time:

Performance Step: 1 PRECAUTIONS:

3.1 A minimum of 1 OOKW of PRZR heaters should be restored within 1 hr of initiation of natural circulation to prevent loss of subcooling (ITS LCO 3.4.9) 3.2 PRZR level must be greater than 13% [50%] to energize PRZR heaters.

3.3 Continuous DIG loading should not exceed 1950 KW.

3.4 During accident conditions, the on-duty RP Technician should be consulted prior to entry into the controlled area.

3.5 The PASS surge line to the VCT may require flushing to minimize radiological hazards prior to entering the SPF Hx area.

Procedure Step:

Section 3.0 Standard:

Reads PRECAUTIONS, compares with Initial Conditions If RP is consulted per Precaution 3.4, report "No additional Evaluator CUE:

radiological precautions required at this time".

Provide a copy of ER-PRZR.1 Evaluator NOTE:

Comment 2012 SROI Retake NRC JPM-H

Appendix C Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Examiner NOTE:

Comment:

Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 6 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION Proceeds to PRZR backup heater breaker panel.

N/A Locates panel ACPDPAB12 None Panel is located on the AB Middle level, behind 'A' SFP heat exchanger.

Candidate may review performance steps 3, 4, 5 and 6 prior to proceeding to Panel 4.2 Perform the following to restore all or part of the PRZR Backup heaters:

4.2.1 Verify SI has been reset (Annunciator K-6 clear). Reset SI if necessary.

4.2.1 Verifies that SI has been reset.

IF candidate verifies SI is reset with the Control Room, feedback "SI is Reset, Annunciator K-6 is clear".

SI RESET was part of the Initial Conditions 2012 SROI Retake NRC JPM-H

Appendix C Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION Verify Emergency DIG B is supplying Bus 16 4.2.2 Determines from initial conditions that the 'B' DIG is supplying Bus 16 (and Bus 17)

None To energize all PRZR Backup heaters (400KW) perform the following:

  • Verify Emergency DIG B load less than 1550 KW, IF NOT, then go to step 4.2.4 4.2.3, 4.2.3.1
  • [~'i~q~!~[1J1tF!~~,t!~m;:i~ltf?lti~,gicue that EDl(3/B/loading is 1"65P~)!an4gp$Sitoistep4~2.4
  • Also notes from the Initiating Cue that the direction given was to energize a minimum of 100 KW of Backup heaters.

None 2012 SROI Retake NRC,JPM-H

Appendix C Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 8 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION


~~~~--~~~~------~

To energize a minimum of 125 KWof PRZR Backup heaters, perform the following:

IF Emergency DIG B load is greater than 1825 KW, THEN evaluate plant status and reduce DIG loading to less than 1825 KW 4.2.4, 4.2.4.1 Determines from initial conditions that the 'B' DIG load is 1650 KW and therefore reducing 'B' DIG load is NOT necessary.

IF Control Room is asked to verify, 'B' DIG load is 1650 KW and stable."

At ACPDPAB12, open all breakers EXCEPT Breaker Switch #4.

4.2.4.3

[Y]:Srmt:llates'.bpenfng'~II"l1eatEit:'Df~akers EXCEPT.Sreaker Swifchi#4;

  • Due to potential safety concern with panel's elevation, after identifying the panel inform candidate that they may simulatel describe breaker actions on provided panel arrangement drawing 03200-0122. sheet 2
  • Feed back "Breaker is OFF" as the Operator simUlates opening each heater breaker
  • Breakers in panel ACPDPA12 are identical to the breakers in ACPOPAB13 in upcoming step.
  • Nearest ladder station is on the wall next to the Spent Fuel Pool 01 room gate.

2012 SROI Retake NRC JPM-H

Appendix C Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Terminating Cue:

Stop Time: ___

Page 9 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION At ACPDPAB13, open all breaker switches except Breaker Switch #1, #3, #6. (Total capacity available should be -125 KW) 4.2.4.4

[:J.1 tes' 9pellin9.;~lIheatE;rbreakers except. Breaker

.#1;;#3(;#$.

Feed back "Breaker is OFF" as the Operator simulates opening each heater breaker When reported to control room, acknowledge status of breakers.

When all pressurizer backup heater breakers are aligned as required:

"No further Action required."

2012 SROI Retake NRC JPM-H

Appendix C Page 10 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SRO RETAKE EXAM - JPM-N-H (In plant)

LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Energize a Minimum of 100 KW Backup heaters onto DIG TASK:

062-029-05-04, Energize a Minimum of 100 IWV Backup heaters onto DIG Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE 0 YES 0 NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

o SATISFACTORY UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM-H

Appendix C Page 11 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP' "Those steps that when not performed correctly in the proper sequence and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Step Procedure Step Basis for Critical Step 5

ER-PRZR1, step action for proper procedural sequence

. 4.2.3, 4.2.3.1 7

I ER-PRZR 1, step Required switch action(s) to perform correctly 4.2.4.3 8

ER-PRZR 1, step Required switch action(s) to perform correctly 4.2.4.4 I

I i

2012 SROI Retake NRC JPM-H

Appendix C Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

JPM CUE SHEET

  • The plant was operating at 100% power when it experienced an SI coincident with a loss of all AC power.
  • The 'B' DIG is now running and carrying approximately 1650 KW on Buses 16 and 17.
  • PRZR level is 20% and stable
  • CNMT pressure is OA psig
  • SI has been RESET
  • The CRS has directed you to energize a minimum 100 KW of PRZR BACKUP heaters per ER-PRZR.1, Section 4.2.

2012 SROI Retake NRC JPM-H

Appendix C Page2of12 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task

Title:

Perform transfer operations from the RCDT and the PRT KIA

Reference:

068 K1.04 (2.4/2.5)

Knowledge of physical connections and/or cause effect relationships between the Liquid Radwaste system and the following systems:

Reactor drain tank Task No.:

068-001-01-01 JPM No.:

2012 Retake N-I Alternate Path Yes NoX Time Critical Yes No x

Category:

RO/SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

x Actual Performance:

Classroom -- Simulator -- Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Handouts:

The plant is operating at 100% power.

RCDT Level is 31% and stable RCDT is in a normal configuration lineup RCDT '8' is tagged out for a minor PM Manually pump down RCDT Hard Hat, Safety Glasses, Gloves, Safety shoes, dosimetry 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET, Rev. 16700 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET, Rev. 16700, Attachment 15, Weekly Operation Of Reactor Coolant Drain Tank Pumps 2012 SROI Retake JPM I

Appendix C Page 3 of 12 Form ES-C-1 JPM WORKSHEET Initiating Cue:

  • The CRS directs you to perform the weekly Operation Of Reactor Coolant Drain Tank Pumps per 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET Validation Time:

7 Minutes CONSEQUENCES OF INADEQUATE PERFORMANCE:

Possible Pump damage! degradation Possible damage to MSA Gas Analyzer SAFETY CONSI DERA TIONS:

Radiological requirements I NSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

Make available a copy of 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET, Rev. 16700, Attachment 15, Weekly Operation Of Reactor Coolant Drain Tank Pumps.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must correctly perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your reactions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI Retake JPM I

Appendix C Page 4 of 12 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP

  • N/A 2012 SROI Retake JPM I

Appendix C Page 5 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a 'V)

Start Time: ___

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Obtain a copy of 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET, Rev.

16700 N/A Obtains a copy of procedure from FCMS.

Provide Operator a copy of 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET, Rev. 16700.

Review procedure to determine correct section/ Attachment to be performed.

6.1.11 Identifies Attachment 15, Weekly Operation of Reactor Coolant Drain Tank Pumps, required per Initiating Cue.

Observes requirements of -30% level to pump down RCDT manually If asked when looking at LI-1003 on waste panel: "U-1003 reads

-30%"

RCDT level given in Cue.

2012 SROI Retake JPM I

Appendix C Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 6 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION PERFORM this Attachment on Saturday to exercise the RCDT Pumps. This Attachment may also be performed, at any time, to lower RCDT level prior to 40%, to prevent auto pump down ATT-15, Step 1.0 Reviews Attachment 15, Weekly Operation Of Reactor Coolant Drain Tank Pumps.

None IF RCDT GAS OUTLET ISOL TO VENT HDR, V-1716A, is CLOSED,THEN PERFORM section 3.0 OTHERWISE, MARK this step N/A 2.0 Determines, by checking locally, that V-1716A is open and that step does not apply. N/A's this step.

If checked locally, feedback that "valve indicates open, stem out".

  • V-1716A is a Normally Open valve that would be closed only for maintenance or for leakage path isolation (e.g.,

Refueling OE)

Located AS Intermediate Level, behind SFP 'A HX (6ft) 2012 SROI Retake JPM I

Appendix C Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 7 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION IF RCDT GAS OUTLET ISOL TO VENT HDR, V-1716A, is OPEN,THEN PERFORM section 4.0 OTHERWISE, MARK this step N/A 2.1

  • Determines, by checking locally, that V-1716A is open.
  • Determines that the step applies.
  • Proceeds to step 4.0, to PERFORM the following to exercise RCDT Pump A If checked locally, feedback: "V-1716A is open."

PLACE Switch for RCDT Pump A suction AOV-1 003A to OPEN (Waste Panel).

4.1

[~Si~q!~tf(~ ~~t~gilJ~/tV~;'F>¥,it~hJo[.RCDT Pump A suction AOV,.

1003A'(l..C:\\f-'f003}toOPEN":

If requested, feedback: "Switch is in the OPEN position".

"Red light is LIT, Green light is Out"

  • If verification is requested pertaining to labels, "AOV-1003 is the same as LCV-1003" 2012 SROI Retake,JPM I

Appendix C J' Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 8 of 12 Form ES-C-1

.JPM VERIFICATION OF COMPLETION START RCDT Pump A at the Waste Panel.

4.2.

(..J],$in;1~Ia,jesSTARrINGRCDt;Pump A (11CDP1A*L)at the Waste Panel.

  • Feedback:" Red light lit, Green light out"
  • If RCDT level checked, feedback "level lowering on '-1 1003" If Candidate informs Control Room of RCDT Pump down, acknowledge When RCDT pump is started, level will begin to lower.

WHEN a level decrease is noted in RCDT level, THEN STOP RCDTPumpA.

4.3

  • ['I]Verifies leyelloweting,on>t::1;1 003
  • ['I] Simfilates;stoppM@'RCDWfpump A If candidate checks RCDT level, after RCDT Pump is stopped feedback "Level is 25% and stable" RCDT Low Level Alarm is received at 13%.

2012 SROI Retake JPM I

Appendix C

.y Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 10 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 9 of 12 Form ES-C-1 "IPM VERIFICATION OF COMPLETION PLACE Switch for RCDT Pump A suction AOV-1003A switch to AUTO Position.

4.4

[Nl,RQsitjons§~it~h'1oF!AQ~~j@~jilli@V~1003)*to***AUTO

[\\ljt\\qpS'erve~~¥at~~~~¥i~.d"Q~~c¢~tl$!3S, red light OFF.

"Red Light OFF, Green Light ON" If guidance is requested pertaining to labels, "AOV-1003 is the same as LCV~1003" Valve AOV-1003A will open/cycle closed automatically to pump down when the switch is in AUTO Report Completion of Pump exercise.

N/A Reports to CRS/Control Room that pump-down is completed Acknowledge communication Terminating Cue:

When report is made to the Control Room: "This JPM is complete."

Stop Time:

2012 SROI Retake JPM I

Appendix C Page 10 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SRO RETAKE EXAM JPM N-I (In plant)

LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Weekly Operation of Reactor Coolant Drain Tank Pumps TASK:

068-001-01-01 Perform transfer operations from the RCDT and the PRT Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE YES NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

SATISFACTORY D UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake JPM I

Appendix C Page 11 of 12 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Step Procedure Step Basis for Critical Step 6

ATT-15, step 4.1 Required switch action(s) to perform correctly 7

ATT-15, step 4.2 Required switch action(s) to perform correctly 8

ATT-15, step 4.3 Required action for proper procedural sequence 9

ATT-15, step 4.4 Required switch action(s) to perform correctly 2012 SROI Retake JPIVI I

Appendix C Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

JPM CUE SHEET

  • The plant is operating at 100% power.
  • RCDT Level is 31 % and stable RCDT is in a normal configuration lineup RCDT Pump B is tagged out for a minor PM
  • The CRS directs you to perform the weekly Operation Of Reactor Coolant Drain Tank Pumps per 0-6.11, SURVEILLANCE REQUIREMENT/ROUTINE OPERATIONS CHECK SHEET 2012 SROI Retake JPM I

Appendix C Page2of15 Form ES-C-1 JPM WORKSHEET Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Ginna Start up Fuel Cooling system in different Pump! Heat Exchanger combinations.

033 G2.1.29 (RO 4.1! SRO 4.0)

Knowledge of how to conduct system lineups, such as valves, breakers, switches, etc.

Simulated Performance:

X Classroom Simulator Task No.:

JPM No.:

033-003-01-04 JR033.006 (New)

Alternate Path Yes No X

Time Critical Category:

NRC Examiner:

Date:

Yes RO/SRO No X

Actual Performance:

Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

  • The plant is Shutdown for a Refueling Outage and has just entered MODE 3.
  • Preparations are being made to accommodate an upcoming Full Core Off-Load to the SFP.
  • Initial SFP temperature is BO°F
  • SFP cooling system A just been removed from service Properly performs all steps of procedure S-9 to alternate SFP Cooling Systems.

Hard Hat, Safety Glasses, Hearing Protection, Gloves, Safety Shoes and Dosimetry.

2012 SROI NRC Retake JPM J

Appendix C Page 3 of 15 Form ES-C-1 JPM WORKSHEET General

References:

S-9, SFP COOLING SYSTEM OPERATION, Rev 00500.

33013-1248 AUXILIARY COOLING SPENT FUEL POOL COOLING.

33013-1250,2 STATION SERVICE COOLING WATER SAFETY RELATED.

Handouts:

S-9, SFP COOLING SYSTEM OPERATION, Rev 00500 Initiating Cue:

  • The CRS has requested that you continue the swap of the SFP cooling systems by placing SFP cooling system '8' in service starting at step 6.6.4 of S-9, SFP COOLING SYSTEM OPERATION Validation Time:

15 Minutes CONSEQUENCES OF INADEQUATE PERFORMANCE:

Inadequate SFP cooling for expected core off-load.

  • System component damage
  • Tech Spec Violation
  • TRM Violation SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

If SFP system is "Protected Equipment", contact SM for permission for performing,JPM in area Indicate reason for unsatisfactory performance in the comment section below each step.

  • Simulate all component manipulations should be stressed Make available a copy of S-9, SFP COOLING SYSTEM OPERATION, Rev 00500, to the Operator at the appropriate cue.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI NRC Retake JPM J

Appendix C Page 4 of 15 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP

  • N/A 2012 SROI NRC Retake JPM J

Appendix C Page 5 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a :-V)

Start Time: ___

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Obtains the working copy of S-9, SFP COOLING SYSTEM OPERATION, Rev. 00500 N/A N/A Provide Operator a marked-up copy of S-9, SFP COOLING SYSTEM OPERA liON, Rev. 00500 Review applicable sections to be performed in procedure.

Table of Contents N/A If requested, "CRS directs placing B in service per section 6.6."

Candidate may N/A sections not used Reviews PRECAUTIONS AND LIMITATIONS section of procedure.

4.0 Reviews PRECAUTIONS and LIMITATIONS section None 2012 SROI NRC Retake JPM J

Appendix C Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CLlE:

Comment:

Page 6 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION Review PREREQUISITES section.

Step 5.0 Reviews marked up section Completes signature block 5.1.2 None Proceeds to section 6.6 Placing SFP System B in service Reads CAUTION ahead of step 6.6.6 not to exceed flow of 2500 GPM as read FI-8683 CAUTION prior to Step 6.6.4 Verbalizes understanding of CAUTION.

None 2012 SROI NRC Retake JPM J

Appendix C Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Page 7 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION THROTTLE OPEN 1B SFP HX SW RETURN ISOL VLV, V 8689, until SFP HX 8 outlet flow, FI-8683, indicates between 1450 and 1550 GPM RECORD final flow on FI-8683 GPM 6.6.4 and 6.6.5 lat~s "[hrottling:Open'~~86a9:fobbtainafiow'of 550"GBM As candidate throttles valve, and checks flow, feedback "Flow on FI-8683 begins to rise from 0 GPM and indicates1500 GPM" OPEN 18 SERVICE WATER OUTLET BLOCK VALVE TO RE-20B, V-8634 Step 6.6.6 Opens V-8634.

"Valve no longer turns in that direction" Valve is located between Operating floor between A' SW HX and B' SFP HX (5FT) 2012 SROI NRC Retake JPM J

Appendix C Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 8 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION THROITLE SFP HX B SW OUTLET BLOCK VLV, V-8685, UNTIL SPENT FUEL POOL HEAT EXCHANGER B OUTLET TO RE-20B FLOW INDICATOR, FI-8631, indicates between 75 and 100 GPM RECORD final flow on FI-8631 __GPM Step 6.6.7 and 6.6.8 Simulates opening V-8685 and verifies flow on FI-8631.

  • "Valve is throttled OPEN" When candidate checks flow, "FI-8631 Indicates 90 GPM" Valve 8685 is located at Aux Bldg operating floor platform near B CCW HX top of stairs ENSURE a leak check of the SFP suction line is performed prior to pump start ENSURE a visual verification has been performed that ensures the SFP pump suctions are not blocked and SFP area is free of potential foreign material.

Steps 6.6.9 and 6.6.10 Performs visual check of suction lines for leakage and verifies SFP suctions are not blocked

  • "No leaks are indicated";

"Suction lines are not blocked" "Spent Fuel Pool area is free of potential foreign materiaL" 2012 SROI NRC Retake JPM J

Appendix C Page 9 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION

....:-./.

Performance Step: 10 ENSURE OPEN LOW SUCTION ISOL VLV TO SPENT FUEL POOL RECIRC PUMPS (ALT), V-782 Procedure Step:

Step 6.6.11 Standard:

["-41 Simulates openingV-782.

Evaluator CUE:

"Valve no longer turns in that direction" Comment:

Performance Step: 11 ENSURE OPEN HIGH SUCTION ISOL VLV TO SPENT FUEL POOL RECIRC PUMPS (NORMAL), V-781.

Procedure Step:

Step 6.6.12 Standard:

Ensures V-781 OPEN Evaluator CUE:

If checked in closed direction feedback "valve moves in that direction" Evaluator NOTE:

"stem indicates out" Valve will be open already at this point Comment:

2012 SROI NRC Retake JPM J

Appendix C Page 10 of 15 Form ES-C-1

~IPM VERIFICATION OF COMPLETION

,f Performance Step: 12 THROTTLE CLOSED ISOLATION GATE VALVE FROM SFP PUMP B TO SFP HEAT EXCHANGER B, V-8667, to approximately 80%-90% CLOSED.

Procedure Step:

Step 6.6.13 Standard:

Evaluator CUE:

"Valve indicates approximately 90% closed" Comment:

Performance Step: 13 START SFP Pump B.

Procedure Step:

Step 6.6.14 N1Starts SFppump B by depressing STARTpushbutton.

Standard:

Observes 'Red' light lit Evaluator CUE:

"Normal pump motor Noise on startup, Red light lit"

  • If candidate checks Pump pressure on PI-8672, feedback "60 psig stable" If Control Room is notified of pump start, acknowledge.

Comment:

2012 SROI NRC Retake JPM J

Appendix C Page 11 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 14 DO NOT exceed 1700 GPM as indicated on FLOW INDICATING TRANSMITTER FOR PAC07B (SPENT FUEL POOL RECIRCULATION PUMP B), FIT-8667 Procedure Step:

CAUTION prior to step 6.6.15 Standard:

Reads CAUTION Evaluator CUE:

None Comment:

Performance Step: 15 THROTTLE ISOLATION GATE VALVE FROM SFP PUMP B TO SFP HEAT EXCHANGER B, V-8667, UNTIL flow is between 1100 and 1700 GPM on (SPENT FUEL POOL RECIRCULATION PUMP B), FIT-8667 Procedure Step:

Step 6.6.15 Standard:

['/:1;$irol:!~ates~t~fqttliR9,¥;-a667,toadjust flow..between 1100 and 1700GPM onFlT~8607.

Evaluator CUE:

  • IF Flow is checked initially on FIT-8667checked, feedback "flow indicates 300 GPM" After simulating throttling V-8667 open, feedback "flow indicates 1200 GPM" Comment:

2012 SROI NRC Retake JPM J

Appendix C Page 12 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 16 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 17 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Terminating Cue:

IF SW system flow rate greater than 1800 GPM through 8 SFP heat exchanger as indicated in Step 4.4, THEN an evaluation SHALL be performed CAUTION prior to Step 6.6.16 Observes note and determines that SW system flow was throttled to less than 1800 GPM on FI-8683 in step 6.6.4

  • IF Flow is re-verified on FIT-8683, feedback "flow indicates 1500 GPM"
  • If Control Room is notified of SFP cooling system 8 in service is made, acknowledge.

This was checked in step 6.6.4.

THROTTLE SFP HX B SW OUTLET VLV, V8689, as required to maintain desired maintain SFP temperature.

Step 6.6.16 Verifies SFP Temperature and determines no changes to SW flow required at this time

  • Feedback SFP temperature is 80°F
  • If Control Room is notified of SFP cooling system 8 in service is made, acknowledge.

SFP Temperature changes would take a significant amount time to occur "No further action is required."

Stop Time:

2012 SROI NRC Retake JPM J

Appendix C Page 13 of 15 Form ES-C-1

..IPM VERIFICATION OF COMPLETION 2012 SRO RETAKE EXAM JPM N-J (In plant)

LICENSED OPERATOR NAME:

JOB PERFORMANCE IVIEASURE:

Alternate SFP Cooling Systems (A to B)

TASK:

033-003-01-04, Start-up Fuel Cooling System in different Pump! Heat Exchanger combinations Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE 0 YES 0 NO PERSONNEL ACTIONS!INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

o SATISFACTORY 0 UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI NRC Retake JPM J

Appendix C Page 14 of 15 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Step Procedure Step Basis for Critical Step 6

S-9, step 6.6.4, Required component manipulation to perform correctly 6.6.5 10 S-9, step 6.6.11 Required component manipulation to perform correctly 12 S-9, step 6.6.13 Required component manipulation to perform correctly 13 S-9, step 6.6.14 Required component manipulation to perform correctly 15 S-9, step 6.6.15 Required component manipulation to perform correctly 2012 SROI NRC Retake JPM J I

Appendix C Form ES-C-1

..!PM CUE SHEET INITIAL CONDITIONS:

  • The plant is Shutdown for a Refueling Outage and has just entered MODE 3.

Preparations are being made to accommodate an upcoming Full Core Off-Load to the SFP.

SFP cooling system A just been removed from service Initial SFP temperature is 80°F The CRS has requested that you continue the swap of the INITIATING CUE:

SFP cooling systems by placing SFP cooling system 'B' in service starting at step 6.6.4 of S-9, SFP COOLING SYSTEM OPERATION 2012 SROI NRC Retake JPM J

Appendix C Page 2 of 11 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

341-038-03-03 Task

Title:

Interpret and Ensure Compliance JPM No.:

2012 Retake SA-1 With Plant Administrative Procedures During Normal and Off-Normal Plant Operations KIA

Reference:

KIA 2.1.8 (3.4 / 4.1)

Alternate Path:

Yes No X Ability to direct personnel activities Time Critical:

Yes No X outside the control room.

Category:

SRO-Only Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

x Classroom x

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • 0-22 Cold Weather Walkdown procedure is in progress.
  • Attachment 1, Cold Weather Temperature Log is complete
  • All other area temperatures are reported to be > 65°F
  • A severe lake-effect storm is occurring with 20 inches of snow now on the ground
  • Driveway and parking lots are being cleared of snow.
  • There are no open work orders/trouble reports numbers generated from M-1306.1, Ginna Station Maintenance Department, Winterizing Inspection Program
  • SM has determined no hazards to plant operation exist at this time.

Task Standard:

  • Perform applicable portions of 0-22 cold weather walk down procedure
  • Document the required actions 2012 SROI Retake NRC JPM-SA-1

Appendix C Page 3 of 11 Form ES-C-1 JPM WORKSHEET Required Materials:

None General

References:

0-22 COLD WEATHER WALK DOWN Procedure, Rev 00804 SC-3.19 Snow Removal for access to Fire Equipment, Rev 11 Handouts:

0-22 COLD WEATHER WALK DOWN, Rev 00804 (marked up), Cold Weather Log (marked up)

Initiating Cue:

You are the CRS and have been directed by the SM to review the conditions and information provided by the AO and perform section 6.1, General Instructions, of 0-22, Cold Weather Walkdown Procedure Document discrepancies, if any, and any required action(s) on the JPM cue sheet.

Validation Time:

8 minutes (4/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Freezing of Critical components/systems SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory step performance in the comment section below each step.

Provide a copy of 0-22, marked up through step 5.2, to examinee.

  • This JPM is intended to be administered in the classroom to multiple examinees.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI Retake NRC JPM-SA-1

Appendix C Page 4 of 11 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP N/A 2012 SROI Retake NRC JPM-SA-1

Appendix C Page 5 of 11 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a ::--/)

Start Time: ___

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Reviews Sections 1.0 through 4.0 Steps 1.1 - 4.1 Reviews sections 1.0-4.0 None Provide the candidate with a copy of 0-22, marked up through step 5.2 and Attachment 1 marked up with temperatures including GE BETZ water truck and AVT Building temperatures.

Prerequisites Section 5.0 5.1 Completes signature! initial block None Reviews NOTE before step 6.1.1 NOTE before Step 6.1.1 Reviews NOTE None 2012 SROI Retake NRC JPM-SA-1

Appendix C Comment:

Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 6 of 11 Form ES-C-1 JPM VERIFICATION OF COMPLETION If the temperature in any of the areas listed falls below the listed temperature, THEN the Shift Manager shall contact Plant Management to establish priority corrective actions to raise temperatures in the affected areas AND raise surveillance frequency until temperature can be restored.

6.1.1 Reviews Attachment 1, Cold Weather Temperature Log:

E"Nk":~l-'prr,nrn'~ the 3 IF asked:

  • "Plant Management has been notified"
  • "AO's have been informed to raise temperature monitoring frequency" If an abnormal condition exists that poses a hazard to plant operation, then submit a work request and immediately notify maintenance to correct the problem. Otherwise mark this step N/A 6.1.2 Based on the initial conditions, determines that NO abnormal condition exists based and marks step N/A None 2012 SROI Retake NRC JPM-SA-1

Appendix C Page 7 of 11 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

NOTE: Routine thermometer readings are obtained with the Auxiliary Operator's PDA. However, when the Auxiliary Operator's PDA is unavailable, Attachment 1 may also be used to log the following readings.

NOTE prior to 6.1.3 Reads NOTE None Obtain designated thermometer readings in potential cold areas once per shift. (AO using PDA) 6.1.3 Determines temperatures are logged by AD's based on from initial conditions provided.

If asked, "AD's have obtained required thermometer readings on Attachment 1."

If required by the Shift Manager, then perform the following to install light weight easy view thermometers at locations susceptible to cold or hot air or where temporary work setups would pose a freezing problem. Otherwise mark this step N/A Step 6.1.4 Determines this is not required based on initial conditions and marks the step N/A Evaluator CUE:

If asked, "No temporary thermometer placement is required at this time."

Comment:

2012 SROI Retake NRC JPM-SA-1

Appendix C Page 8 of 11 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 9 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

Performance Step: 10 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Terminating Cue:

When contacted by the Mechanical PM Analyst, then Log open WRlTR numbers and descriptions generated from completion of M-1306.1, Maintenance Department Winterizing Inspection program, on Attachment 2 Step 6.1.5 Determines from initial condition this is not required If asked, "SM has authorized you to initial on his behalf."

Examinee may chose to NOT initial this step due to it being an SM initial blank.

If Snow Accumulation reduces the 12 inch minimum from a fire hydrant nozzle to ground level THEN NOTIFY Fire Brigade to implement SC-3.19, Snow Removal for Access to Fire Equipment. Otherwise, Mark this step N/A Step 6.1.6

["1... Determines that snow depth is 20 inches and documents:

notify the Fire Brigade to implement SC3.19 If asked, "Fire Brigade will implement SC-3.19."

When examinee hands in completed procedure and JPM cue sheet, then JPM is complete Stop Time: ___

2012 SROI Retake NRC JPM-SA-1

Appendix C Page 9 of 11 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 NRC Retake JPM SA-1 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Evaluate data obtained from the latest 0-22 cold weather walk down procedure TASK:

115-020-02-04 Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE YES 0 NO PERSONNEL ACTIONSIINACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

o SATISFACTORY UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM-SA-1

Appendix C Page 10 of 11 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Procedure Basis for Critical Step Step Step Parameters required to be identified to perform procedure 6.1.1 4

i correctly to ensure task completion Parameters required to be identified to perform procedure 10 6.1.6 correctly to ensure task completion 2012 SROI Retake NRC JPM-SA-1

Appendix C Form ES-C-1 Initial Conditions:

INITIATING CUE:

JPM CUE SHEET

  • 0-22 Cold Weather Walkdown procedure is in progress.
  • Attachment 1, Cold Weather Temperature Log is complete
  • All other area temperatures are reported to be > 65°F
  • A severe lake-effect storm is occurring with 20 inches of snow now on the ground
  • Driveway and parking lots are being cleared of snow.
  • There are no open work orders/trouble reports numbers generated from M-1306.1, Ginna Station Maintenance Department, Winterizing Inspection Program
  • SM has determined no hazards to plant operation exist at this time.
  • You are the CRS and have been directed by the SM to review the conditions and information provided by the AO and perform section 6.1, General Instructions, of 0-22, Cold Weather Walkdown Procedure Document discrepancies, if any, and any required action(s) on the JPM cue sheet.

2012 SROI Retake NRC JPM-SA-1

COLD WEATHER WALKDOWN PROCEDURE 0-22 Revision 00804 35 of 37 Page 1 of 1, Cold Weather Temperature Log Outside Air Temp (33' Level) 10 or outside Door 11 if Met Tower is OOS i Int. Bldg. East end, top of stairs from Door S-44 72 I

A Diesel Generator Room 66 B Diesel Generator Room 68 Main Feed Pump Room near NPSH Panel 78 Main Feed Pump Room Northwest area 78 Main Feed Pump Room Southwest Area 75

  • MCC 1A Turbine Bldg. Basement 69 i Screenhouse South Screen Bay Area, East side 65 Screenhouse, North wall 67 Screenhouse, West wall 65 i Standby Aux. Feed Pump Room 68 TSC Diesel Generator Room 66 TSC Batt Room Whenever Generator Rm Heat E-28 is 68 on, N/A the rest of the time. Maintain> 66°F I

Aux Building North wall by MCC 1 E 71 Aux Building South wall by Door #29 70 Aux Building North of Door #28 69 Battery Room A 75 Battery Room B 76 GE Betz Water Truck 44 AVT Building 65 END OF SHIFT REVIEW by either Shift Manager or CRS i

Appendix C Page 2 of 10 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

344-001-04-02 Task

Title:

Perform calculations to determine JPM No.:

2012 Retake N-SA-2 the Plant Status (e.g. Fluid Flow/heat balance, Quadrant Power Tilts, Shutdown Margin, Etc.)

KIA

Reference:

G2.1.25 (RO 3.9/SRO 4.2)

Alternate Path:

Yes No 6 Ability to interpret reference materials, such as graphs, curves, tables, etc Time Critical:

Yes No X

Category:

SRO-Only Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is in Mode 5 for a refueling outage

  • The plant has been shutdown for 25 hrs
  • The pressurizer is solid with L TOP in service RCS temperature is 140°F
  • The Ginna Defense-in-Depth computer program used to calculate time to boil and core uncovery is unavailable Task Standard:

Properly performs all calculations and transposes answers onto CUE sheet:

Condition 1 Time to Boil is determined to be 2.46 hrs.

Condition 2 Time to Boil is determined to be.43 hrs (25.96 min +0.2/-0 min>>

2012 SROI Retake NRC JPM SA-2

Appendix C Page 3 of 10 Form ES-C-1 JPM WORKSHEET Required Materials:

Pen! pencil General

References:

IP-OUT-2, OUTAGE RISK MANAGEMENT Rev 01901 Handouts:

IP-OUT-2,OUTAGE RISK MANAGEMENT Initiating Cue:

The Shift Manager has directed you to determine the Time to Boil given a Loss of RHR and the following two sets of conditions:

1. For present plant conditions,
2. Exactly four (4) days from now based on the following conditions:

RCS level will be reduced to 64 inches.

RCS temperature will be lowered to 100°F PRZR manway will be removed Validation Time:

8 minutes (4/05/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

  • Violation of Federal Regulations
  • Tech Spec Violation SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step

  • Make available a copy of IP-OUT-2 to the candidate at the appropriate cue.

Ensure candidate understands to put information on cue sheet.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the...IPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7.

Are there any questions before beginning this JPM?

2012 SROI Retake NRC JPM SA-2

Appendix C Page 4 of 10 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP N/A 2012 SROI Retake NRC JPM SA-2

Appendix C Page 5 of 10 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a --1)

Start Time:

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Reviews the copy of IP-OUT-2, OUTAGE RISK MANAGEMENT, provided.

N/A Demonstrates knowledge that latest procedure revision is obtained through FCMS Provide Operator a copy of IP-OUT-2 Candidate reviews the Table of Contents.

IP-OUT-2, Table of Contents Candidate determines that Attachment E, Time to Boil and Core Uncovery, will be required for necessary determinations.

None 2012 SROI Retake NRC JPM SA-2

Appendix C Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page60f10 Form ES-C-1 JPM VERIFICATION OF COMPLETION Determines for condition 1 (current) that Pressurizer is Full and Attachment E, Page 5 of 11 will be required Attachment E, Page 5 of 11 Identifies Attachment Page 5 of 11 will be required to determine 'Time to Reach Saturation with Pressurizer Full and RCS Closed' from Procedure and Initial Conditions given.

None Determine Time to Reach Saturation (boil) for condition (1)

Attachment E, Page 5 of 11

  • b~,i~~(~~i,~~J qQll)\\ for ~oo~itl()rr"(1:~js 21'i46l

__' Houf§usi~0

,J;:~

Titdowniand;l"'fc:~ 140~F Records time on Cue sheet for Condition 1 None Determines for condition (2), Loop Level at 64" and with PRZR manway open that Attachment E, Page 7 of 11 will be required.

Attachment E, Page 7 of 11 Identifies Attachment E, Page 7 of 11 will be required to determine Time to Reach Saturation with 64" and RCS Open' from Initial Conditions given.

None 2012 SROI Retake NRC JPM SA-2

Appendix C Page 7 of 10 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 6 Determine Time to Reach Saturation (boil) for condition (2)

Procedure Step:

Attachment E, Page 7 of 11 Standard:

Records time on Cue sheet for Condition 2 Evaluator CUE:

None Comment:

Terminating Cue:

When student hands in cue sheet with times: "JPM is complete."

Stop Time: ___

2012 SROI Retake NRC,-'PM SA-2

Appendix C Page 8 of 10 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SRO RETAKE EXAM - JPM-N-SA-2 (Classroom)

LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Determine Time to Boil for a Loss of Shutdown Cooling TASK:

344-001-04-02 Perform calculations to determine the Plant Status (e.g. Fluid Flow/heat balance, Quadrant Power Tilts, Shutdown Margin,Etc.)

Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE DYES D NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

o SATISFACTORY 0 UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI Retake NRC JPM SA-2


..... -.~--

Appendix C Page 9 of 10 Form ES-C-1 JPM VERIFICATION OF COMPLETION


~------------

CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper and/or at the proper time, will prevent the system from functioning properly or

. successful completion of the task." (ES-603, pp 2-3)

Performance Procedure Basis for Critical Step Step Step m]

4 IP-OUT-2, ATT E,

! Correct table needs to be selected, and data ch~sen page 5 of 11 based on plant conditions to perform calculation correctly IP-OUT-2, ATT E, Correct table needs to be selected, and data chosen page 7 of 11 based on plant conditions to perform calculation correctly I

I I

I 2012 SROI Retake NRC JPM SA-2

Appendix C Form ES-C-1 INITIAL CONDITIONS:

INITIATING CUE:

JPM CUE SHEET The plant is in Mode 5 for a refueling outage The plant has been shutdown for 25 hrs

  • The pressurizer is solid with L TOP in service RCS temperature is 140°F
  • The Ginna Defense-In-Depth computer program used to calculate time to boil and core uncovery is unavailable The Shift Manager has directed you to determine the Time to Boil given a Loss of RHR and the following two sets of conditions:
1. For present plant conditions,
2. Exactly four (4) days from now based on the following conditions:

RCS level will be reduced to 64 inches RCS temperature will be lowered to 100°F PRZR manway will be removed 2012 SROI Retake NRC JPM SA-2

Appendix C Page 2 of 14 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

300-003-03-02 Task

Title:

Control of Limiting Conditions for

~IPM No.:

2012 Retake N-SA-3 Operation Evaluation KJA

Reference:

G 2.2.23 (RO 3.11 SRO 4.6) Ability Alternate Path Yes No to track Technical SpeCification X

limiting conditions for operation Time Critical Yes No X

Category:

SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Plant is operating at 100% power

  • Electricians are preparing to perform a PM on MOV-3996, TDAFW Pump Discharge Valve, under Work Order #C92144243
  • No other equipment is currently Out of Service.
  • A "What if' risk assessment in EOOS has been performed and it was determined that the highest PRF color is yellow and the highest top level system status color is yellow. Values match IWS expected risk Task Standard:

Properly fill out A-52.4, attachment 1 sections 1.0 through 4.0 and 6.0 Required Materials:

None 2012 SROI NRC Retake JPM SA-3

Appendix C Page 3 of 14 Form ES-C-1 JPM WORKSHEET General

References:

  • A-52.4, CONTROL OF LIMITING CONDITIONS FOR OPERATING EQUIPMENT Rev 14300
  • Technical Specifications Amendment 112
  • A-52.3 SAFETY FUNCTION DETERMINATION PROGRAM
  • A-52.4, Attachment 1 KEY Handouts:
  • Attachments 1 and 2 of A-52.4, Control of Limiting Conditions for Operating Equipment Rev 14300 Technical Specifications Amendment 112 available
  • A-52.4, Control of Limiting Conditions for Operating Equipment Rev 14300 Initiating Cue:
  • The Shift Manager requests that you, the CRS, fill out and submit the required paperwork (A-52.4) for performing maintenance on MOV 3996 at time 0800 on today's date Time Critical Task No Validation Time:

18 Minutes (4/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Technical Specification violation SAFETY CONSI DERA TIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the..IPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this JPM?

2012 SROI NRC Retake JPM SA-3

Appendix C Page 4 of 14 Form ES-C-1

.JPM WORKSHEET SIMULATOR SETUP N/A 2012 SROI NRC Retake JPM SA-3

Appendix C Page 5 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a..J)

Start Time: ___

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Examiner NOTE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Examinee NOTE:

Comment:

Reviews A LCO.

TECHNICAL SPECIFICATIONS, LCO 3.7.5 aCD3.7.5, Auxiliary ri1:ta

  • See attached KEY (A-52.4, Attachment 1)

None

  • It is NOT critical for Candidate to complete performance steps in order 1.0, INOPERABILITY A-52.4, Attachment 1, Section 1.0, steps 1), 2),3),4), and 5)
  • See attached KEY
  • Proceeds to step 6 None
  • Work Order in Step 3 will be placed in section 6.0
  • Candidate may fill in section 4.0 for equipment deemed inoperable at this time for performance step 10.0 2012 SROI NRC Retake JPM SA-3

Appendix C Page 6 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SROI NRC Retake JPM SA-3

Appendix C Page 7 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 3 Perform loss of Safety function determination PER Attachment 2 Procedure Step:

A-52.4, Attachment 1, Step 6 Standard:

Proceeds to Attachment 2 See attached KEY Evaluator CUE:

None Comment:

Performance Step: 4 Have any of the following supporting system LCO's been entered? YES! NO Procedure Step:

A-52.4 Attachment 2, Step 1.0 Standard:

Circles NO in step 1.0 Proceeds to step 2.0 Evaluator CUE:

None Comment:

2012 SROI NRC Retake JPM SA-3

Appendix C Page 8 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION Performance Step: 5 Has only one (1) LCO been entered? (i.e. total # of LCOs in effect is only 1) YES/ NO.

IF YES AND Question #1 was answered NO, THEN the single LCO provides necessary ACTIONS.

Return to Attachment 1 and checks of 'Loss of Safety Function Determination box Procedure Step:

A-52.4 Attachment 2, Step 2.0 Standard:

Circles YES in step 2.0 Determines that the single LCO provides necessary ACTIONS Return to Attachment 1 section 1.0, step 7)

Evaluator CUE:

None Comment:

2012 SROII\\IRC Retake "IPM SA-3

Appendix C Page 9 of 14 Form ES-C-1 Performance Step: 6 Procedure Step:

Standard:

Evaluator CUE:

Comment:

JPM VERIFICATION OF COMPLETION PERFORM a "what if' risk assessment in EOOS for inoperable equipment lAW 5.2.

If equipment is being removed for planned maintenance, Verify EOOS PRF color and value match IWS expected risk:

If color AND value match IWM schedule expected risk, then continue with this Attachment.

EOOS highest PRF color:

green D Iyellow D I orange D Ired D EOOS highest top level system status color:

green D Iyellow D I orange D Ired A-S2.4, Attachment 1, Section 1, Step 7) and 8)

  • Checks the Uwhat if' risk assessment box in step 7)
  • Checks box for color and value match with IWM schedule expected risk
  • Marks both yellow boxes in step 8).

None 2012 SROI NRC Retake JPM SA-3

Appendix C Performance Step: 7 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 8 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Page 10 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION If equipment being removed from service is due to emergent maintenance issues, THEN PERFORM the following A-52.4, Attachment 1, Section 1, Step 9)

Recognizes that steps are due to planned maintenance and N/A's boxes None REQUIRED ACTIONS:

A-52.4, attachment 1, Section 2.0

[:il~~IU,~/',

.~E,q,mH~

$:~able (Attachmentrfi'step 2iO}Th;l\\"

'>")Witl'l'J ",

}K~Y See the attached Key with similar wording and times 2012 SROI NRC Retake JPM SA-3

Appendix C

..,J Performance Step: 9 Procedure Step:

Standard:

Evaluator Cue:

Comment:

Performance Step: 10 Procedure Step:

Standard:

Evaluator Cue:

Examinee note Comment:

Terminating Cue:

Stop Time: ___

Page 11 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION REQUIREMENTS IF REQUIRED ACTIONS! COMPLETION TIMES ARE NOT MET:

A-S2.4, Attachment 1, Section 3.0 E1J~~JU~¥)y~,tlrLe:REQUIRED.A~f~Qr:iI§,JZ~plell}**Accordance.With tne~'aftaeltffij'key See the attached Key with similar wording and times Declaration of Inoperable Equipment A-S2.4, Attachment 1, Section 4.0 Declare equipment inoperable (logged in official record from initial conditions)

Candidate signs for Equipment deemed inoperable, Date and time If asked feedback to candidate that the the TDAFWP is logged out of service in the Official Record See the attached Key Candidate may have performed this in performance step 2.0 After the REQUIRED ACTION Table and the DECLARATION OF INOPERABLE EQUIPMENT sections are completed:

"Evaluation of this JPM is complete."

2012 SROI NRC Retake JPM SA-3

Appendix C Page 12 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SRO RETAKE EXAM-JPM-N-SA-3 (classroom)

LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Control of Limiting Conditions for Operation Evaluation TASK:

300-003-03-02, Control of Limiting Conditions for Operation Evaluation Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE 0 YES 0 NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

o SATISFACTORY UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE:

2012 SROI NRC Retake JPM SA-3

I Appendix C Page 13 of 14 Form ES-C-1 JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Procedure Basis for Critical Step Step Step 1

ITS LCO 3.7.5 Required assessment to complete attachment correctly 8

A-52.4, ATT-1, Required action to complete Attachment correctly section 2.0 9

A-52.4, ATT-1, Required action to complete Attachment correctly section 3.0 2012 SROI NRC Retake JPM SA-3

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

Plant is operating at 100% power Electricians are preparing to perform a PM on MOV-3996, TDAFW Pump Discharge Valve under Work Order

  1. C92144243 No other equipment is currently Out of Service.
  • A "What if' risk assessment in EOOS has been performed and it was determined that the highest PRF color is yellow and the highest top level system status color is yellow.

Values match IWS expected risk INITIATING CUE:

  • The Shift Manager requests that you, the CRS, fill out and submit the required paperwork (A-52.4) for performing maintenance on MOV-3996 at time 0800 on today's date 2012 SROI NRC Retake JPM SA-3

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION Facility:

Ginna Task No.:

341-012-03-03 TasklJPM

Title:

Approve Radioactive Waste JPM No.:

2012 Retake JPM SA-4 Discharge/Release Permit KIA

Reference:

2.3.6 (RO 2.0/ SRO 3.8)

Alternate Path Yes No~

Ability to approve release permits.

Time Critical Yes No~

Category:

SRO Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is at 100% power.

The A Monitor Tank release was not authorized by the Shift Manager due to discrepancies with the CH-700 Liquid Waste Release Form, Attachment 3.

No additional actions have been taken Task Standard:

Identify discrepancies on discharge permit and all critical tasks evaluated as satisfactory.

Required Materials:

Attached Key.

General

References:

S-3.4K: Releasing Monitor Tank A or B to Discharge Canal, Rev 03002 CH-700, Liquid Waste Batch Release, Rev. 00600, Attachment 3 Handouts:

  • CH-700, Liquid Waste Batch Release, Rev. 00600, Attachment 3 submittal CH-700, Liquid Waste Batch Release, Rev. 00600 2012 SROI Retake JPM SA-4

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION Initiating Cue:

Review the CH-700 Liquid Release form, Attachment 3, for the A Monitor Tank and document ALL discrepancies on the JPM CUE SHEET Time Critical Task:

No Validation Time:

16 minutes (4/3/13) 2012 SROI Retake JPM SA-4

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION SIMULATOR SETUP N/A 2012 SROI Retake JPM SA-4

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a.,J)

START TIME:

Performance Step: 1 Procedure Step:

Standard:

EXAMINER CUE:

Comment:

Performance Step: 2 Standard:

EXAMINER NOTE:

Comment:

Terminating Cue:

STOP TIME:

LIQUID WASTE RELEASE FORM of CH-700

  • Reviews release form.
  • Identifies the sample time is greater than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Identifies R-18 is OOS and that LINE-UP VERIFIED BY should not be N/A.

Hand the Examinee the marked up copy of:

1) CH-700, Liquid Waste Batch Release, Rev. 00600,, LIQUID WASTE RELEASE FORM, and
2) CH-700, Liquid Waste Batch Release, Rev. 00600 Answer the questions on the JPM CUE SHEET.

[.,J] Documents that the sample time is greater than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (CH-700step6.10A)

  • ["1 Documents that with R-18 being OOS the LINE-UP VERIFIED BY would be required. (CH-700 step 6.10.2.2)

(When examinee returns JPM to the Examiner) "Evaluation of this..'PM is complete."

2012 SROI Retake JPM SA-4

Appendix C Form ES-C-1 JPM CUE SHEET 2012 SROI RETAKE JPM SA-4 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Review & Approve Radioactive Waste Discharge/Release Permit TASK:

341-012-03-03: Approve Radioactive Waste Discharge/Release Permit Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE D YES NO PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS/GRADING:

1.

All discrepancies listed on JPM CUE sheet SATISFACTORY? DYES NO The operator's performance was evaluated against the standards contained in this JPM and determined to be:

SATISFACTORY D UNSATISFACTORY EVALUATOR'S SIGNATURE:

DATE:

2012 SROI Retake JPM SA-4

Appendix C Form ES-C-1 JPM CUE SHEET CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance '

Step Procedure Step Basis for Critical Step 2

, CH-700, Attachment Required assessment to complete answer correctly 3 (1 st bullet)

(sample time) 2 CH-700, Attachment Required assessment to complete answer correctly (R-18 3 (2nd Bullet) j)

I 2012 SROI Retake JPM SA-4

Appendix C Form ES-C-1 Initial Conditions:

Initiating Cue:

JPM CUE SH The plant is at 100% power.

The A Monitor Tank release was not authorized by the Shift Manager due to discrepancies with the CH-700 Liquid Waste Release Form, Attachment 3.

No additional actions have been taken Review the CH-700 Liquid Release form, Attachment 3, for the A Monitor Tank and document ALL discrepancies on the JPM CUE SHEET Document ALL discrepancies with the CH-700 Liquid Release form, Attachment 3 form here:

2012 SROI Retake JPM SA-4

Appendix C Page 2 of 9 Form ES-C-1 JPM WORKSHEET Facility:

Ginna Task No.:

340-001-05-02 Task

Title:

Event Classification JPM No.:

2012 Retake N-SA-5 KIA

Reference:

KIA 2.4.41 (2.9/4.6)

Alternate Path Yes No X

Knowledge of the emergency action level thresholds and classifications Time Critical Yes X No Category:

SRO Only Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • 30 minutes ago, a large steamline break occurred inside containment
  • Prior to the accident, the plant had been at full power for 185 days
  • Automatic SI actuated
  • Coincident with the automatic SI, both CKT 7T and 767 were lost
  • EDG 1A started and immediately energized Bus 14
  • EDG 1 B failed to start automatically but was started locally and Bus 16 was energized within 8 minutes of the SI actuation
  • Containment Pressure peaked at 31 PSIG and is lowering slowly
  • Containment radiation levels are normal (none elevated or in alarm)
  • RCS cold leg temperatures have stabilized at 265°F Task Standard:

Determine the proper EAL classification within 15 minutes Required Materials:

Pencil and dry-erase marker General

References:

EPIP-1-0, GINI\\JA STATION EVENT EVALUATION AND CLASSIFICATION, Rev 04800 EAL wall chart, Rev 04800 EAL Technical Basis Document, Rev 04800 2012 SROI Retake NRC JPM-SA-5

Appendix C Page 3 of 9 Form ES-C-1 JPM WORKSHEET EPIP-1-0, GINNA STATION EVENT EVALUATION AND Handouts:

CLASSIFICATION,

  • EAL Wall Chart Initiating Cue:

Using EPIP-1-0 or the EAL wall chart, classify this event

  • Provide both the classification level and EAL number on this Cue Sheet
  • This is a time-critical ~IPM the time will start when you tell me you understand the initial conditions Validation Time:

5 Minutes (4/04/13)

CONSEQUENCES OF INADEQUATE PERFORMANCE:

Misclassification of event could hinder timely activation of support functions and notification of offsite organizations.

SAFETY CONSIDERATIONS:

None INSTRUCTOR NOTES:

Indicate reason for unsatisfactory performance in the comment section below each step.

  • This is a time critical (15 minute) JPM.

Make available a copy of EPIP-1-0 (or the EAL wall chart) to the Operator at the appropriate cue Provide the candidate with the EAL Technical Basis document, if requested.

DIRECTIONS TO PERFORMER:

1. To complete the task successfully, you must perform each critical element correctly.
2. Where necessary, consider the examiner to be the CRS.
3. Verbalize all your actions and observations while performing the JPM.
4. Where necessary, consider the examiner for peer checks as appropriate.
5. When you have indicated you understand the Initial Conditions and Initiating Cues the JPM will commence.
6. Verbalize when you consider your performance of the JPM complete.
7. Are there any questions before beginning this ~IPM?

2012 SROI Retake NRC JPM-SA-5

Appendix C Page 4 of 9 Form ES-C-1 JPM WORKSHEET SIMULATOR SETUP N/A 2012 SROI Retake NRC JPM-SA-5

Appendix C Page 5 of 9 Form ES-C-1 JPM VERIFICATION OF COMPLETION (Denote Critical Steps with a.,J)

Start Time:

Performance Step: 1 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 2 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Performance Step: 3 Procedure Step:

Standard:

Evaluator CUE Comment:

Operator reviews initial conditions and procedures to determine plant conditions N/A None Provide Operator a copy of EPIP~1*0 and the EAL Wallchart Reviews Sections 1-5 of the procedure EPIP-1-0, Sections 1-5 Verbalizes understanding of each Precaution in Section 4.0 None Identify the initiating conditions using either the guidelines of the EAL wall chart or Attachment 1 of EPIP-1-0 6.1.2 Determines which method to use for EAL classification None 2012 SROI Retake NRC JPM-SA-5

Appendix C Page 6 of 9 Form JPM VERIFICATION OF COMPLETION

........-~

Performance Step: 4 Procedure Step:

Standard:

Evaluator CUE:

Evaluator NOTE:

Comment:

.~ Performance Step: 5 Procedure Step:

Standard:

Evaluator CUE:

Comment:

Terminating Cue:

Assess given plant conditions and determine event classification using either Attachment 1 or EAL wall chart 6.1.2

'" *q~t~~tmines'~~~n~;~I~~~~c~i9nis:AlERT due to a RED path onR.GS fntegrijyg:§F:SY,.EAt: lA.1.

None

  • Since the accident occurred 30 minutes ago, and cold leg temperatures have been reduced by >100°F within 60 minutes to <284°F, this meets the RED path entry condition for the Integrity CSFST and FR-P.1 should be entered.
  • The loss of both offsite power circuits satisfies the UE conditions of EAL 6.1.1, but this is a lower classification level.
  • Candidate may consider an ALERT condition on EAL 6.1.3, Available safeguard train AC power reduced to a single EDG for> 15 min, but the 'B' EDG was started and energized Bus 16 in 8 minutes.

Complete time-critical classification within 15 minutes N/A

'" Completes assessment.of'90nditions and classifies the event within 15 minutes from.thestartofthe JPM None Once the EAL classification is made: No further actions are required.

Stop Time:

Classification Time (Stop time Start time): ____ minutes 2012 SROI Retake NRC JPM-SA-5

Appendix C Page 7 of 9 Form ES-C-1 JPM VERIFICATION OF COMPLETION 2012 SROI NRC Retake JPM SA-5 LICENSED OPERATOR NAME:

JOB PERFORMANCE MEASURE:

Event Classification TASK:

340-001-05-02, Event Classification Time to Complete: _____

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of HU Tools.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE DYES D NO PERSONNEL ACTIONSIINACTIONS OR PROCEDURAL QUALITY?

(If yes, provide comments below)

COMMENTS:

START TIME: ______ FINISH TIME: _____ DURATION: _____

The operator's performance was evaluated against the standards contained in this JPM and determined to be:

D

  • SATISFACTORY D

UNSATISFACTORY EVALUATOR'S DATE:

SIGNATURE

  • In addition to the correct EAL classification, "IPM duration must be < 15 minutes 2012 SROI Retake NRC JPM-SA-5

I Appendix C Page 8 of 9 Form JPM VERIFICATION OF COMPLETION CRITICAL STEP BASES CRITICAL STEP: "Those steps that, when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task." (ES-603, pp 2-3)

Performance Procedure Basis for Critical Step Step Step 4

EPIP-1.0, step 6.1.2 Correct classification required for satisfactory performance 5

N/A Event declaration must be made within 15 minutes of the conditions being apparent in the control room (or in the case of this JPM, from the time the candidate states the he/she understands the Initial Conditions and Cue) 2012 SROI Retake NRC JPM-SA-5 I

~

Appendix C INITIAL CONDITIONS:

INITIATING CUE:

EAL Classification Level:

EAL Classification Number:

Page 9 of 9 Form ES-C-1 JPM CUE SHEET

  • 30 minutes ago, a large steamline break occurred inside containment
  • Prior to the accident, the plant had been at full power for 185 days
  • Automatic SI actuated
  • Coincident with the automatic SI, both CKT 7T and 767 were lost
  • EDG 1A started and immediately energized Bus 14
  • EDG 1 B failed to start automatically but was started locally and Bus 16 was energized within 8 minutes of the SI actuation
  • Containment Pressure peaked at 31 PSIG and is lowering slowly
  • Containment radiation levels are normal (none elevated or in alarm)
  • RCS cold leg temperatures have stabilized at 265°F
  • Using EPIP-1-0 or the EAL wall chart, classify this event
  • Provide both the classification level and EAL number on this Cue Sheet
  • This is a time-critical JPM - the time will start when you tell me you understand the initial conditions 2012 SROI Retake NRC JPM-SA-5