Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000395/2002003 | 24 October 2002 | IR 05000395-02-003, on 09/28/02 for Virgil C Summer Nuclear Station. Post-Maintenance Testing, Identification and Resolution of Problems | Safe Shutdown Packing leak Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Earthquake Fire Protection Program Siren |
IR 05000395/2002007 | 8 November 2002 | IR 05000395-02-007, on 9/23-10/11/2002, South Carolina Electric & Gas Co., Virgil C. Summer, Safety System Design and Performance Capabiltity Biennial Baseline Inspection | Power Uprate |
ML022740071 | 1 October 2002 | Safety Evaluation, Nozzle-to-pipe Welds in the Hot Legs of Loops B and C | |
ML022830826 | 10 October 2002 | Yellow Ticket No. 0200020247, NRC - Response, e-mail, VC Summer Nuclear Plant Concern | |
ML022970033 | 23 October 2002 | NRC Examination Report 50-395/2002-301 | Job Performance Measure |
ML022970363 | 23 October 2002 | Meeting with NEI, Surry & North Anna Units 1 & 2, McGuire & Catawba Units 1 & 2, Peach Bottom Units 2 & 3, St. Lucie Units 1 & 2, Fort Calhoun, H. B. Robinson Unit 2, R.E. Ginna, and Virgil C. Summer. the Proposed Agenda Is Attached | |
ML023080014 | 30 October 2002 | Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Resubmittal of Notification of Proprietary Information | |
ML023110206 | 30 October 2002 | Comment (17) Submitted by Sce&G Company, Stephen A. Byrne on Proposed Rule (Dfr) PR-Chapter 1 Re Maintenance and Submission of Information | |
ML023250143 | 12 November 2002 | October 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station | |
ML023250378 | 21 November 2002 | Request for Additional Information, Bulletin 2002-01 Reactor Coolant Pressure Boundary Integrity 60 Day Response | Boric Acid VT-2 |
ML023290184 | 20 November 2002 | Slides for 11/4/2002 Lrsc Meeting | Aging Management |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023400490 | 3 December 2002 | Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter Revision to Testing Plan for the Temporary Crane | |
ML023450559 | 4 December 2002 | February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing Exam | Generic Fundamentals Examination |
ML023520156 | 6 December 2002 | November 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station | |
ML030030520 | 30 December 2002 | NPDES Permit SC0030856 | |
ML030080299 | 30 December 2002 | Special Report 2002-002 | |
ML030160169 | 20 November 2002 | Power Shield Tap Block Solder Joints 10CFR Part 21 Report | |
ML030300475 | 31 October 2002 | DHEC Warning Letter September 2002 Discharge Monitoring Report for V. C. Summer Plant | |
ML030300662 | 22 October 2002 | Monthly Discharge Monitoring Report for September 2002 | |
ML030300670 | 22 October 2002 | VC Summer Discharge Monitoring Report for September 2002 | |
ML030300754 | 3 December 2002 | NPDES Permit December 2002 | Boric Acid Grab sample |
ML030310162 | 30 November 2002 | Sensitive (Threatened and Endangered) Species Field Survey, V. C. Summer Nuclear Station | |
RC-02-0170, Operating License No. NPF-12, Basis Documentation for Application for Renewed Operating License, Virgil C. Summer Nuclear Station Mechanical Database AMR Query, Pages 1 to 237 | 1 October 2002 | Operating License No. NPF-12, Basis Documentation for Application for Renewed Operating License, Virgil C. Summer Nuclear Station Mechanical Database AMR Query, Pages 1 to 237 | Boric Acid Reactor Vessel Water Level Stroke time Aging Management Through-Wall Leak Fire Protection Program |
RC-02-0173, September 2002 Monthly Operating Report for South Carolina Electric & Gas Co | 14 October 2002 | September 2002 Monthly Operating Report for South Carolina Electric & Gas Co | |
RC-02-0176, Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter | 14 October 2002 | Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter | |
RC-02-0184, Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Clarification of Response to Request for Additional Information - Dated May 8, 2002 | 18 October 2002 | Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Clarification of Response to Request for Additional Information - Dated May 8, 2002 | High Radiation Area Deep Dose Equivalent |
RC-02-0191, Request to Use Alternatives to ASME Boiler & `Pressure Vessel Code, Section XI (0-C-02-3202) | 30 October 2002 | Request to Use Alternatives to ASME Boiler & `Pressure Vessel Code, Section XI (0-C-02-3202) | High Radiation Area |
RC-02-0200, Technical Specification Amendment Request TSP 00-0032, Revision to Engineered Safety Feature Actuation System Instrumentation Tables, Response to Request for Additional Information | 14 November 2002 | Technical Specification Amendment Request TSP 00-0032, Revision to Engineered Safety Feature Actuation System Instrumentation Tables, Response to Request for Additional Information | |
TAC:MB4870 | 1 October 2002 |