IR 05000335/2010005 | 27 January 2011 | IR 05000335-10-005, 05000389-10-005; 10/01/2010 - 12/31/2010; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems and Other Activities | Boric Acid Non-Destructive Examination Mission time Fire Barrier Weld Overlay Internal Flooding Fire impairment Temporary Modification Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Moisture barrier License Renewal Liquid penetrant GOTHIC Unidentified leakage |
IR 05000335/2010405 | 14 January 2011 | IR 05000335-10-405 and 05000389-10-405, on December 16, 2010, St. Lucie Nuclear Plant, NRC Physical Security Inspection (Cover Letter) | Significance Determination Process Affidavit |
IR 05000335/2010503 | 9 March 2011 | NRC Emergency Preparedness Annual Inspection Report 05000335/2010503 and 05000389/2010503 | |
IR 05000335/2011008 | 25 March 2011 | IR 05000335-11-008 and 05000389-11-008; 01/16/2011 - 02/09/2011; St. Lucie Nuclear Plant; Occupational Radiation Safety | Significance Determination Process |
L-2010-278, Extended Power Uprate Data for NRC Confirmatory EPU Analyses | 6 January 2011 | Extended Power Uprate Data for NRC Confirmatory EPU Analyses | Loop seal Stroke time |
L-2011-008, 2010 Annual Operating Report | 7 January 2011 | 2010 Annual Operating Report | |
L-2011-014, Environmental Protection Plan Report, Approved Revision to Industrial Wastewater Facility Permit | 11 January 2011 | Environmental Protection Plan Report, Approved Revision to Industrial Wastewater Facility Permit | Grab sample Incorporated by reference |
L-2011-021, License Amendment Request for Extended Power Uprate, Attachment 8; Core Operating Limits Report (COLR) Markups | 25 February 2011 | License Amendment Request for Extended Power Uprate, Attachment 8; Core Operating Limits Report (COLR) Markups | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 1; Description and Technical Justifications for the Renewed Facility Operating License Technical Specifications and Licensing Basis Changes | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 1; Description and Technical Justifications for the Renewed Facility Operating License Technical Specifications and Licensing Basis Changes | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report License Renewal Environmental Justice Power Uprate |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages | Boric Acid Shutdown Margin Packing leak Offsite Dose Calculation Manual Hydrostatic Nondestructive Examination Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Offsite Circuit Power change |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups | Boric Acid Shutdown Margin Anticipated operational occurrence Fuel cladding Power change |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5, Appendix C, Grid Stability Analysis and System Impact Study for St. Lucie Plant with Proposed EPU | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5, Appendix C, Grid Stability Analysis and System Impact Study for St. Lucie Plant with Proposed EPU | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B Additional Codes and Methods | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B Additional Codes and Methods | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key Acronyms | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key Acronyms | Earthquake |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix F, Camereron Ultrasonics Engineering Reports, Cover | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix F, Camereron Ultrasonics Engineering Reports, Cover | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU | |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report Compliance | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report Compliance | Boric Acid Hydrostatic Fuel cladding |
L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 7; Summary of Regulatory Commitments | 25 February 2011 | St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 7; Summary of Regulatory Commitments | |
L-2011-033, Emergency Response Data Point Library (Dpl) Changes/New ERDS Link | 27 January 2011 | Emergency Response Data Point Library (Dpl) Changes/New ERDS Link | |
L-2011-058, Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | 23 March 2011 | Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | Decommissioning Funding Plan |
L-2011-061, Request a Change to the Official Service List | 11 February 2011 | Request a Change to the Official Service List | |
L-2011-062, Annual Fitness-For-Duty Program Report for the Period of January 1 Through December 31, 2010 | 21 February 2011 | Annual Fitness-For-Duty Program Report for the Period of January 1 Through December 31, 2010 | Fitness for Duty |
L-2011-063, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2010 | 18 February 2011 | Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2010 | |
L-2011-064, Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010, Enclosures 2 and 3, Offsite Dose Calculation Manual Revisions | 28 February 2011 | Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010, Enclosures 2 and 3, Offsite Dose Calculation Manual Revisions | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2011-064, St. Lucie, Units 1 and 2 - 2010 Annual Radioactive Effluent Release Report | 28 February 2011 | St. Lucie, Units 1 and 2 - 2010 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
L-2011-064, St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010 | 28 February 2011 | St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
L-2011-066, Cycle 19 Core Operating Limits Report | 3 March 2011 | Cycle 19 Core Operating Limits Report | Boric Acid Shutdown Margin |
L-2011-073, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation | 11 March 2011 | License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation | Grab sample |
L-2011-075, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | 3 March 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | Anticipated operational occurrence Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report Exemption Request |
L-2011-076, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | 25 February 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | Hydrostatic Pressure and Temperature Limits Report Exemption Request |
L-2011-089, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | 14 March 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request | Safe Shutdown |
L-2011-090, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Change Report | 18 March 2011 | Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Change Report | |
L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown |
L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
L-2011-096, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 14 March 2011 | Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2011-103, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request | 22 March 2011 | Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request | Cyber Security Power change |
L-2011-108, Submittal of Environmental Protection Plan Report 316(b) Related Documentation | 18 March 2011 | Submittal of Environmental Protection Plan Report 316(b) Related Documentation | |
L-2011-109, Environmental Protection Plan Report 316(b) Related Documentation | 18 March 2011 | Environmental Protection Plan Report 316(b) Related Documentation | Met Tower |
L-2011-126, Response to Request for Additional Information Fourth Ten Year Interval Relief Request PR-9 | 31 March 2011 | Response to Request for Additional Information Fourth Ten Year Interval Relief Request PR-9 | |
ML110120643 | 4 January 2011 | Logbook Entry: 1/4/2011 Saint Lucie, Sea Turtles | |
ML110120666 | 8 January 2011 | December 2010 Marine Turtle Removal Summary | |
ML110120669 | 8 January 2011 | December 2010 Marine Turtle Removal Summary | |
ML110130390 | 7 January 2011 | Annual Letter - Generic Fundamentals Examination (GFE) Section | Generic Fundamentals Examination |
ML110130412 | 13 January 2011 | Request for Information for EPU Review | Pressure and Temperature Limits Report Exemption Request |
ML110240329 | 31 January 2011 | Fourth 10-Year Interval Inservice Inspection Program Plan Relief Request No. 6 | Incorporated by reference Fuel cladding |
ML110260390 | 26 January 2011 | Public Meeting Summary - FPL - St. Lucie & Turkey Point Nuclear Plants | |
ML110260406 | 11 January 2011 | FPL Meeting Summary Presentation Handouts | |