Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
ML003698321 | 27 March 2000 | Changes to Emergency Plan Implementing Procedures |
ML020720028 | 27 February 2002 | Submittal of Technical Specification (TS) Bases Change for McGuire Nuclear Station, Units 1 & 2 |
ML021070641 | 1 April 2002 | Duke Energy Corporation, Technical Specification Bases Change |
ML021770117 | 20 June 2002 | Changes to Emergency Plan Implementing Procedures |
ML022040207 | 11 June 2002 | Revised Epips, Including Rev. 31 to Coversheet, Index Pages 1-3, Rev. 20 to RP/O/A/5700/012 & Rev. 12 to RP/O/A/5700/020 |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |
ML033070046 | 5 December 2003 | 50-370, 50-369, Improved Technical Specifications, Mcguire Nuclear Station, Units No. 1 and 2 (Volume 1) |
ML033290615 | 20 November 2003 | Revised EPIP Index Pages 1, 2, and 3, and Revision 22A to RP/0/A/5700/012, Activation of the Technical Support Center (Tsc). |
ML033570496 | 17 December 2003 | Change to Emergency Plan Implementing Procedures |
ML040550091 | 12 February 2004 | Changes to Emergency Plan Implementing Procedures |
ML040900301 | 18 March 2004 | Changes to Emergency Plan Implementing Procedures |
ML042530077 | 30 August 2004 | Technical Specifications Bases Changes |
ML042790461 | 20 September 2004 | License Amendment Request to Eliminate the Technical Specifications Requirements for the Hydrogen Monitors and Hydrogen Recombiners Oconee Technical Specification 3.3.8 and McGuire Technical.. |
ML050810416 | 16 March 2005 | License Amendment Request Applicable to Oconee Technical Specification 3.3.8, PAM Instrumentation, and 3.6.7, Hydrogen Recombiners, Using the Consolidated Line Item Improvement Process |
ML050970142 | 4 April 2005 | Tech Spec Pages for Amendments 227, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process |
ML050970155 | 4 April 2005 | Tech Spec Pages for Amendments 209, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process |
ML053060106 | 20 October 2005 | Technical Specification Bases Manual |
ML080670419 | 7 March 2008 | CDBI Findings |
ML091280276 | 29 April 2009 | Transmittal of Technical Specification and Technical Specification Bases Manual Holders |
ML091310333 | 30 April 2009 | Technical Specification Bases Changes, Tsb 3.3.3, Rev. 100 and Tsb 3.8.4, Rev 100 |
ML093280761 | 23 November 2009 | Initial Exam 2009-302 Final RO Written Exam (as Given) with References and Answer Key |
ML11311A162 | 31 October 2011 | Technical Specifications & Tech Spec Bases Updates |
ML11363A038 | 12 December 2011 | Technical Specifications and Technical Specifications Bases Updates |
ML12130A257 | 17 April 2012 | Emergency Plan Implementing Procedure Changes |
ML12340A518 | 26 November 2012 | Submittal of Technical Specification (TS) and Technical Specification Bases (Tsb) Manual |
ML15141A049 | 7 May 2015 | Enclosure 3, EAL Technical Bases Document (Clean Version) |
ML15141A052 | 7 May 2015 | Attachment 1, EAL Bases, Attachment 2, Fission Product Barrier Loss/Potential Loss Matrix and Bases, and Attachment 3, Safe Operation & Shutdown Areas Tables R-2 & H-2 Bases |
ML15356A365 | 10 December 2015 | Technical Specification Bases, B 3.3.2, Revision 138, ESFAS Instrumentation |
ML16056A243 | 18 February 2016 | Emergency Action Level Technical Bases Document Redline |
ML16056A245 | 18 February 2016 | Emergency Action Level Technical Bases, Revision 1 Redline. Part 2 of 2 |
ML16351A319 | 7 December 2016 | Revision 16-5 to Emergency Plan |
ML17235A612 | 20 June 2017 | MNS EPIP Manual |
ML20008F436 | 9 March 1981 | Responds to NUREG-0737,Item II.F.2, Instrumentation for Detection of Inadequate Core Cooling. Conformance of Reactor Vessel Level Sys to Reg Guide 1.97 Will Be Addressed When Overall Compliance Submitted on 810423 |
ML20137M937 | 1 April 1997 | Forwards Site Responses to RAI Re Emergency Action Level Rev to NUMARC/NESP-007 Methodology |
ML20148H285 | 22 January 1988 | Summary of ACRS Subcommittee on Generic Items 871216 Meeting W/Util in Washington,Dc Re Effectiveness of NRC Process That Deals W/Generic Issues & Usis.Viewgraphs & Presentation Schedule Encl |
ML20151Q166 | 28 July 1988 | Forwards Plan Providing Hydrogen & Steam Release Histories to Containment for Spectrum of Accident Sequences Using MAAP for Mechanistic Portion of Calculation |