Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000237/202000111 May 2020Units, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001
IR 05000237/202000210 August 2020Integrated Inspection Report 05000237/2020002; 05000249/2020002; and 07200037/2020001
IR 05000237/202000310 November 2020Integrated Inspection Report 05000237/2020003 and 05000249/2020003
IR 05000237/202000410 February 2021Integrated Inspection Report 05000237/2020004 and 05000249/2020004
IR 05000237/20200064 March 2021Annual Assessment Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2020006 and 05000249/2020006)
IR 05000237/202001219 May 2020NRC Inspection Report 05000237/2020012 and 05000249/2020012 and Apparent Violation
IR 05000237/202040316 December 2020Security Baseline Inspection Report 05000237/2020403 and 05000249/2020403
IR 05000237/202100113 April 2021Integrated Inspection Report 05000237/2021001 and 05000249/2021001
IR 05000237/20210029 August 2021Integrated Inspection Report 05000237/2021002 and 05000249/2021002
IR 05000237/20210031 November 2021Integrated Inspection Report 05000237/2021003 and 05000249/2021003
IR 05000237/20210051 September 2021Updated Inspection Plan for Dresden Nuclear Power Station, Units 2 and 3, Report 05000237/2021005 and 05000249/2021005
IR 05000237/20210062 March 2022Annual Assessment Letter (Report 05000237/2021006 and 05000249/2021006)
IR 05000237/202101023 February 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000237/2021010 and 05000249/2021010
IR 05000237/202101130 September 2021Triennial Fire Protection Inspection Report 05000237/2021011 and 05000249/2021011
IR 05000237/202140216 March 2021Security Baseline Inspection Report 05000237/2021402 and 05000249/2021402
IR 05000237/20214049 August 2021Security Baseline Inspection Report 05000237/2021404 and 05000249/2021404
IR 05000237/202150125 August 2021Emergency Preparedness Biennial Exercise Inspection Report 05000237/2021501 and 05000249/2021501
IR 05000237/202200522 August 2022Updated Inspection Plan for Dresden Nuclear Power Station (Report 05000237/2022005; 05000249/2022005)
IR 05000237/20220061 March 2023Annual Assessment Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2022006 and 05000249/2022006)
ML20094H02927 March 2020Final: Dresden, Units 2 & 3 LAR Request for Additional Information to Modify Technical Specifications to Main Steam Isolation Valve Leakage Requirements
ML20163A65516 June 20206-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections
ML20169A55916 June 2020Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1)
ML20170B02123 June 2020NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections
ML20178A42030 June 2020NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response
ML20178A42830 June 2020NEI Questions for June 30, 2020 Public Meeting
ML20216A26027 August 2020Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (COVID-19)
ML20238B85725 August 2020Quad 2019 Hq Online EOC Slides
ML20243A00023 September 2020FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020
ML20259A11614 September 2020Incoming Request-Dresden-Exelon Generation Co., LLC
ML20259A49228 September 2020Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0143 (COVID-19))
ML20271A00013 October 2020FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020
ML20302A46028 October 2020Request for Information for an NRC Triennial Baseline Deisgn Bases Assurance Inspection (Team): Inspection Report 05000237/2021010; 05000249/202101
ML20322A30314 December 2020Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0203 (COVID-19))
ML21193A32612 July 2021People of the State of Illinois'S Non-Confidential Request for Leave to Intervene and for a Hearing Regarding Exelon Generation Company, Llc'S Facility Operating License Transfer Application
ML21194A18213 July 2021and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides
ML22269A41125 July 2022Attachment 5 - Dresden Nuclear Station-Development of Evacuation Time Estimates
NMP1L3362, Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency13 November 2020Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency
NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates15 September 2022Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates
SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld15 October 2020Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld