Letter Sequence Other |
---|
|
|
MONTHYEARML20216A2602020-08-27027 August 2020 Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (COVID-19) Project stage: Other 2020-08-27
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARML24065A4822024-04-0101 April 2024 Attachment - Exemption Dresden ML24078A3772024-03-15015 March 2024 Email to the State of Illinois Requesting Review of the Dresden Exemption Request Environmental Assessment RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-0808 March 2024 Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24044A0732024-02-28028 February 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - January 2024 ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23328A0092023-11-22022 November 2023 Supplement - Dresden Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0031) (Email) RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML21305A0192022-03-16016 March 2022 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(b) Related to Submission of Subsequent License Renewal Application (EPID L-2021-LLE-0048) (FRN) ML21305A0162022-03-15015 March 2022 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(b) Related to Submission of Subsequent License Renewal Application (EPID L-2021-LLE-0048) (Letter) ML21305A0182022-03-15015 March 2022 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(b) Related to Submission of Subsequent License Renewal Application (EPID L-2021-LLE-0048) (Exemption) RS-21-114, Request for Exemption from 10 CFR 2.109(b)2021-10-28028 October 2021 Request for Exemption from 10 CFR 2.109(b) ML21204A1242021-08-23023 August 2021 Exemption Related to the Approval Authority for Suspension of Security Measures in an Emergency or During Severe Weather ML21103A0082021-04-12012 April 2021 Acceptance Review (Exemption Request): Dresden Nuclear Power Station, Units 1, 2, and 3-Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E ML21076A4382021-03-17017 March 2021 Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E ML21076A4392021-03-17017 March 2021 Attachment 1 - Requests for Exemptions from Portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2) and 10 CFR 50, Appendix E ML20322A3032020-12-14014 December 2020 Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0203 (COVID-19)) NMP1L3362, Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency2020-11-13013 November 2020 Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20248H5652020-10-0505 October 2020 Letter, Exemption from the Requirements of Title 10 of the Code of Federal Regulations Part 50, Appendix J ML20248H5662020-10-0505 October 2020 Exemption from the Requirements of Title 10 of the Code of Federal Regulations Part 50, Appendix J RS-20-124, Request for Exemption from Certain Record Retention Requirements2020-09-30030 September 2020 Request for Exemption from Certain Record Retention Requirements RS-20-113, Request for Exemption from Specific Provisions in 10 CFR 73.55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather2020-09-28028 September 2020 Request for Exemption from Specific Provisions in 10 CFR 73.55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather ML20259A4922020-09-28028 September 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0143 (COVID-19)) ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20259A1162020-09-14014 September 2020 Incoming Request-Dresden-Exelon Generation Co., LLC ML20216A2602020-08-27027 August 2020 Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (COVID-19) ML0614302462006-06-27027 June 2006 TMI and Zion - Exemption from the Requirements of 10 CFR 50.54(a)(3) Re Submittal of Changes to Quality Assurance Topical Report ML0233805992002-11-25025 November 2002 Exemption Request from the Requirements of 10 CFR 50.36(c)(1) ML0223502112002-10-0202 October 2002 Exemption from the Requirements of 10 CFR 50.719(e)(4) ML0218603302002-07-12012 July 2002 Exemption, Reschedule Requalification Examination 2024-04-01
[Table view] Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 2024-09-06
[Table view] |
Text
August 27, 2020 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - EXEMPTION REQUEST FROM CERTAIN REQUIREMENTS OF TITLE 10 OF THE CODE OF FEDERAL REGULATIONS, PART 73, APPENDIX B, GENERAL CRITERIA FOR SECURITY PERSONNEL, SECTION VI (EPID L-2020-LLE-0123
[COVID-19])
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has approved the temporary exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Appendix B,Section VI, Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties, for the Dresden Nuclear Power Station, Units 2 and 3 (Dresden). This action is in response to the Exelon Generation Company, LLCs (Exelon or the licensee) application dated July 28, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20210M410 (non-public, withheld under 10 CFR 2.390)), that requested a temporary exemption from 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1), regarding the annual force-on-force (FOF) exercise at Dresden.
The requirements in 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1), state, in part:
Each member of each shift who is assigned duties and responsibilities required to implement the safeguards contingency plan and licensee protective strategy participates in at least . . . one (1) force-on-force exercise on an annual basis.
Force-on-force exercises conducted to satisfy the NRC triennial evaluation requirement can be used to satisfy the annual force-on-force requirement for the personnel that participate in the capacity of the security response organization.
The purpose of the annual licensee-conducted FOF exercise is to ensure that the site security force maintains its contingency response readiness. Participation in these exercises also supports the requalification of security force members.
On January 31, 2020, the U.S. Department of Health and Human Services declared a Coronavirus Disease 2019 (COVID-19) public health emergency (PHE) for the United States.
B. Hanson Subsequently, the Centers for Disease Control and Prevention issued recommendations (e.g., social distancing, limiting assemblies) to limit the spread of COVID-19.
Exelons application dated July 28, 2020, stated the following:
On March 9, 2020, the Governor of the State of Illinois issued a disaster proclamation in response to the spread of COVID-19 and imposed isolation and other restrictions throughout the State. Since that time, Exelon has implemented isolation restrictions and other precautions for the protection of Dresden site personnel.
This temporary exemption supports the isolation restrictions (e.g., social distancing, group size limitations, self-quarantining, use of personal protective equipment, etc.)
necessary to protect required site personnel in response to the COVID-19 virus.
These restrictions are needed to ensure personnel are isolated from the COVID-19 virus and remain capable of maintaining plant security Exelon will maintain a list of the names of individuals who will not meet the requalification requirements and will include the dates of the last qualification.
Exelon will ensure contingency response readiness of security personnel not participating in an annual FOF exercise by conducting scenario-based evolutions that include a lessons-learned review of past exercises.
Exelon will schedule and complete any missed FOF exercise within the time period in this request (i.e., 90 days after the PHE is ended or December 31, 2020, whichever occurs first) when isolation restrictions are ended.
Exelon will begin implementing COVID-19 PHE controls for managing personnel performing Security Program duties upon NRC approval of its July 28, 2020, exemption request.
This temporary exemption is specific to Dresden security personnel who have previously demonstrated proficiency and are currently qualified in accordance with the requirements in 10 CFR Part 73, Appendix B, Section VI. Exelon stated that because of the rigorous nature of the Dresden nuclear security personnel training programs, which consist of regularly scheduled training activities to include weapons training, contingency response drills and exercises, and demonstrated acceptable performance of day-to-day job activities (e.g., detection and assessment, patrols, searches, and defensive operations), it is reasonable to conclude that security personnel will continue to maintain their proficiency even though the requalification periodicity is temporarily exceeded. Additionally, Exelon identified site-specific COVID-19 PHE controls listed above that will be implemented at Dresden, consistent with those outlined in the NRC staffs April 20, 2020, letter discussing planned activities related to the requirements for 10 CFR Part 73, Appendix B, Section VI, during the PHE (ADAMS Accession No. ML20105A483). Exelon requested that the duration of the exemption be for 90 days after the PHE is ended, or until December 31, 2020, whichever occurs first, consistent with the NRC staffs letter dated April 20, 2020.
Pursuant to 10 CFR 73.5, Specific exemptions, the Commission may, upon application of any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR
B. Hanson Part 73 that are authorized by law and will not endanger life or property or the common defense and security, and are otherwise in the public interest.
In accordance with 10 CFR 73.5, the Commission may grant an exemption from the regulations in 10 CFR Part 73 that is authorized by law. The NRC staff has reviewed the exemption request and finds that granting the proposed exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or other laws. Therefore, the NRC staff finds that the exemption is authorized by law.
In accordance with 10 CFR 73.5, the Commission may grant an exemption from the regulations in 10 CFR Part 73 when the exemption will not endanger life or property or the common defense and security. This exemption will only apply to Dresden security personnel who are already satisfactorily qualified on the security requirements in 10 CFR Part 73, Appendix B, Section VI.
Based on the limited scope of this exemption and the controls Exelon will implement for the duration of the exemption, including conducting a lessons-learned review of past exercises, continuing to conduct required quarterly tactical response drills, and completing any missed annual FOF exercises within the time period for this exemption, the NRC staff has reasonable assurance that the security force at Dresden will maintain its proficiency and readiness to implement the licensees protective strategy and adequately protect the site. Therefore, the NRC staff concludes that the proposed exemption would not endanger life or property or the common defense and security.
In accordance with 10 CFR 73.5, the Commission may grant an exemption from the regulations in 10 CFR Part 73 when the exemption is in the public interest. Participation in FOF exercises requires significant staff support and places site security personnel in close proximity to one another. Such proximity has the potential to increase the likelihood of security personnel being exposed to the COVID-19 virus. The NRC staff finds that the temporary exemption from the annual FOF requirement in 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1),
would facilitate the licensees efforts to maintain a healthy workforce capable of operating the plant safely and implementing the sites protective strategy by isolating security personnel from potential exposure to the COVID-19 virus. The NRC staff concludes that granting the temporary exemption is in the public interest because it allows the licensee to maintain the required security posture at Dresden, while enabling the facility to continue to provide electrical power to the Nation.
Environmental Considerations NRC approval of this exemption request is categorically excluded under 10 CFR 51.22(c)(25),
and there are no special circumstances present that would preclude reliance on this exclusion.
The NRC staff determined, per 10 CFR 51.22(c)(25)(vi)(E), that the requirements from which the exemption is sought involve education, training, experience, qualification, requalification, or other employment suitability requirements. The NRC staff also determined that approval of this exemption request involves no significant hazards consideration because it does not authorize any physical changes to the facility or any of its safety systems, nor does it change any of the assumptions or limits used in the facility licensees safety analyses or introduce any new failure modes. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite because this exemption does not affect any effluent release limits as provided in the facility licensees technical specifications or by the regulations in 10 CFR Part 20, Standards for Protection Against Radiation. There is no significant increase in individual or cumulative public or occupational radiation exposure because this exemption does not affect limits on the release of any radioactive material or the limits provided
B. Hanson in 10 CFR Part 20 for radiation exposure to workers or members of the public. There is no significant construction impact because this exemption does not involve any changes to a construction permit and no significant increase in the potential for or consequences from radiological accidents because this exemption does not alter any of the assumptions or limits in the facility licensees safety analysis. In addition, the NRC staff determined that there would be no significant impacts to biota, water resources, historic properties, cultural resources, or socioeconomic conditions in the region. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the approval of this exemption request.
Conclusions Accordingly, the NRC has determined that pursuant to 10 CFR 73.5, this exemption is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest. Therefore, the Commission hereby grants the licensees request to temporarily exempt Dresden from the annual FOF exercise requalification requirement of security personnel in subsection C.3.(l)(1) of 10 CFR Part 73, Appendix B, Section VI. This exemption expires 90 days after the end of the PHE, or December 31, 2020, whichever occurs first.
If you have any questions, please contact the Dresden project manager, Russell Haskell, at 301-415-1129 or e-mail at Russell.Haskell@nrc.gov.
Sincerely, Digitally signed by Craig Craig G. G. Erlanger Date: 2020.08.27 Erlanger 14:48:17 -04'00' Craig G. Erlanger, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249 cc: Listserv
ML20216A260 *email concurrence OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA* NSIR/DPCP/RSB/BC*
NAME RHaskell (BPurnell for) SRohrer (JBurkhardt for) ABowers DATE 8/27/2020 8/4/2020 8/14/2020 OFFICE OGC - NLO* NRR/DORL/LPL3/BC* NRR/DORL/D*
NAME JMaltese NSalgado CErlanger DATE 8/20/2020 8/26/2020 8/27/2020