Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-97-299, Investigation Rept 3-96-047 on 961220.No Noncompliance Noted.Major Areas Investigated:Allegations Re Alleged Deliberate Failure to Follow Procedures Required by TSs | 20 December 1996 | Investigation Rept 3-96-047 on 961220.No Noncompliance Noted.Major Areas Investigated:Allegations Re Alleged Deliberate Failure to Follow Procedures Required by TSs | Loop seal Power change |
IR 05000410/2006018 | 9 July 1985 | Insp Rept 50-461/85-20 on 850410-0618.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Preoperational Test Procedure Review, Preoperational Test Witnessing & Program Implementation | |
IR 05000416/1982049 | 21 June 1982 | IE Insp Rept 50-416/82-49 on 820603-04.No Noncompliance Noted.Major Areas Inspected:Followup Insp Re Comparison of Licensee Results W/Values of Simulated Liquid & Particulate Samples & Radiochemical Procedures | |
IR 05000416/2005028 | 31 May 1985 | Insp Rept 50-461/85-21 on 850416-0528.No Noncompliance or Deviation Noted.Major Areas Inspected:Const & Preoperational Testing,Including Review of Allegations,Employee Concerns, Plant Maint Procedures & Operating Staff Training | |
IR 05000416/2006011 | 24 July 1985 | Special Insp Rept 50-461/85-22 on 850416-0611.No Violation or Deviation Noted.Major Areas Inspected:Allegations & Applicable Work Activities,Procedures & records.In-ofc Review of Overinsp Program Data Also Performed | Hydrostatic |
IR 05000429/2006011 | 10 July 1985 | Insp Rept 50-461/85-27 on 850429-0611.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings | |
IR 05000429/2008014 | 21 August 1985 | Insp Rept 50-461/85-26 on 850429-0814.Violation Noted: Unacceptable Methods Used to Identify Nonconforming Conditions Re Installation of Travelers | |
IR 05000461/1978006 | 11 December 1978 | IE Inspec Rept 50-461/78-06 on 780913-14 & 1005-06 During Which 3 Items of Noncompliance Were Noted:Failure to Control Special Processes (Welding),Failure to Provide Procedures & Lack of Calibr Control.W/Encl Ltrs Re Welding | Liquid penetrant |
IR 05000461/1982007 | 19 June 1982 | IE Insp Rept 50-461/82-07 on 820517-20.No Noncompliance Noted.Major Areas Inspected:Followup of 10CFR50.55e Repts, IE Bulletins & Circulars | Anchor Darling |
IR 05000461/1982009 | 21 June 1982 | IE Insp Rept 50-461/82-09 on 820609 & 10.No Noncompliance Noted.Major Areas Inspected:Preservice Insp Procedures, Work Activities,Nondestructive Exam Personnel Certifications & Data & Shop & Field Radiographs | Liquid penetrant |
IR 05000461/1982012 | 26 July 1982 | IE Mgt Meeting Rept 50-461/82-12 on 820712.No Noncompliance Noted.Major Areas Discussed:Existing Stop Work Recovery Plans & Proposals W/Respect to Continuing Const Work Activities at Facility | |
IR 05000461/1983006 | 7 April 1983 | IE Mgt Meeting Rept 50-461/83-06 on 830317.Major Areas Discussed:Status of Stop Work Recovery & Overinsp & Improvement Programs | |
IR 05000461/1985001 | 22 November 1985 | SALP Board Rept 50-461/85-01 for Mar 1984 - Aug 1985 | Fitness for Duty Hydrostatic Nondestructive Examination Systematic Assessment of Licensee Performance Fire Protection Program |
IR 05000461/1985028 | 8 August 1985 | Insp Rept 50-461/85-28 on 850715-19.No Violations or Deviations Identified.Major Areas Inspected:Preoperational Radwaste & Radiation Protection Programs,Including Organization,Staffing,Qualifications & ALARA | Process Control Program |
IR 05000461/1985029 | 20 June 1985 | Insp Rept 50-461/85-29 on 850509,10,13 & 14.No Violations or Deviations Noted.Major Areas inspected:as-built Walkdown & Review Documentation for Structural Steel Framing & Attachments | |
IR 05000461/1985031 | 11 June 1985 | Insp Rept 50-461/85-31 on 850520-23.No Noncompliance Noted. Major Areas Inspected:Allegations & Resolution of Open Items.Allegations Unsubstantiated.Stop Work Order Unwarranted | Coatings |
IR 05000461/1985032 | 23 July 1985 | Insp Rept 50-461/85-32 on 850529-0709.No Violations or Deviations Noted.One Unresolved Item Re Socket Weld Fit Up Requires Licensee Response.Major Areas Inspected:Const & Preoperational Testing Activities | Reactor Vessel Water Level Ultimate heat sink Hydrostatic Anchor Darling Nondestructive Examination |
IR 05000461/1985033 | 11 July 1985 | Safeguards Insp Rept 50-461/85-33 on 850606 & 0610-14.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Program Audit.Details Withheld (Ref 10CFR73.21) | |
IR 05000461/1985034 | 1 October 1985 | Insp Rept 50-461/85-34 on 850618-0912.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on IE Bulletins,Reactor Coolant Loop Piping Welds & Quality Records & Other safety-related Piping Welds | |
IR 05000461/1985035 | 15 August 1985 | Insp Rept 50-461/85-35 on 850708-12,15-18 & 22-25.No Violations or Deviations Identified.Major Areas Inspected: Previous Insp Findings,Audits,Safety Committee Activity, Tests & Experiments | |
IR 05000461/1985036 | 5 September 1985 | Insp Rept 50-461/85-36 on 850708-0820.Violation Noted: Preoperational Test Procedure PT-FC/SM-01 Not Accomplished Since Sequence of Performing Test Not Controlled | |
IR 05000461/1985037 | 8 August 1985 | Insp Rept 50-461/85-37 on 850710-12.No Noncompliance Noted. Major Areas Inspected:Allegations & Resolution of Open Items | |
IR 05000461/1985038 | 25 July 1985 | Mgt Meeting Rept 50-461/85-38 on 850711.Major Areas Discussed:Allegations Re Contractor Mgt,Plant Housekeeping & Const Activity | |
IR 05000461/1985039 | 19 December 1985 | Insp Rept 50-461/85-39 on 851112-21.No Violations or Deviations Noted.Major Areas Inspected:Onsite Emergency Preparedness,Including Administration of Emergency Preparedness Program,Emergency Organization & Training | Safe Shutdown Grab sample Earthquake Power change Siren |
IR 05000461/1985040 | 23 December 1985 | Insp Rept 50-461/85-40 on 851203-06.No Noncompliance, Deficiencies or Deviations Noted.Weaknesses Identified: Classification of General Emergency Delayed & Info Flow to Media Via Joint Public Info Ctr Poor at Times | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Earthquake Fuel cladding Overexposure |
IR 05000461/1985041 | 21 October 1985 | Insp Rept 50-461/85-41 on 850715-0930.Violation Noted: Failure to Verify Availability & Acceptability of Vendor Documentation | |
IR 05000461/1985042 | 30 August 1985 | Insp Rept 50-461/85-42 on 850709-0819.Violations Noted in Areas of Electrical Raceway Allegations & Bechtel Independent Design Review Const Variances | Hydrostatic Flow Induced Vibration |
IR 05000461/1985043 | 1 October 1985 | Preoperational Physical Protection & SNM Control & Accountability Insp Repts 50-461/85-43 & 70-2947/85-01 on 850826-0910.No Violation Noted.Areas Inspected:Security Program Audit.Details Withheld (Ref 10CFR73.21) | |
IR 05000461/1985044 | 30 September 1985 | Special Safety Insp Rept 50-461/85-44 on 850823,24 & 30 & 0903-04.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions Re Program | |
IR 05000461/1985045 | 22 October 1985 | Insp Rept 50-461/85-45 on 850820-1003.No Violation or Deviation Noted.Major Areas Inspected:Const & Preoperational Testing Activities,Including Previous Insp Findings, 10CFR50.55(e) Items & Site Surveillance Tours | Flow Induced Vibration |
IR 05000461/1985046 | 6 December 1985 | Insp Rept 50-461/85-46 on 850828-1010.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on IE Circular,Fan Housing Missile shield,10CFR50.55(e) Items & Allegation Followup | |
IR 05000461/1985047 | 22 October 1985 | Insp Rept 50-461/85-47 on 850909-1019.Violation Noted: Failure to Calibr Fire Hose Standpipe Pressure Restricting Valve & to Inspect Portable Fire Extinquishers | Fire Barrier B.5.b Fire Protection Program Fire Watch |
IR 05000461/1985048 | 1 November 1985 | Insp Rept 50-461/85-48 on 850824-1010.Violation Noted: Failure to Confirm Design Safety Requirements of Standby Liquid Control Sys Due to Inadequate Program Implementation | Emergency Lighting |
IR 05000461/1985049 | 30 September 1985 | Safety Insp Rept 50-461/85-49 on 850911.No Violation or Deviation Noted.Major Areas inspected:as-built Condition of Conduit Hangers,Cable Tray Hangers,Hvac Ducts & HVAC Duct Supports | |
IR 05000461/1985050 | 28 October 1985 | Insp Rept 50-461/85-50 on 850918-20.No Violation or Deviation Noted.Major Areas Inspected:Chemistry & Radiochemistry,Radiological Environ Monitoring Program & Previously Identified Findings | |
IR 05000461/1985051 | 19 November 1985 | Safety Insp Rept 50-461/85-51 on 850924-26 & 1025.Violation Noted:Lead Instrument Verification Engineer Did Not Meet Educational Requirement Per Baldwin Assoc Resident Engineering Job Description | |
IR 05000461/1985052 | 7 November 1985 | Insp Rept 50-461/85-52 on 850923-27 & 1015-17.No Violation or Deviation Noted.Major Areas Inspected:Preoperational Radwaste & Radiation Protection Programs,Including Training, Organization & Preoperational Tests of Liquid Effluents | Process Control Program |
IR 05000461/1985053 | 22 November 1985 | Insp Rept 50-461/85-53 on 851004-1118.No Violation or Deviation Noted.Major Areas Inspected:Applicant Action Re Previous Insp Findings,Employee Concerns,Review of Allegations & Functional or Program Areas | |
IR 05000461/1985054 | 29 November 1985 | Insp Rept 50-461/85-54 on 851007-1112.No Violations Noted. Three Open Items Identified Requiring Addl Followup.Major Areas Inspected:Allegations & Const Deficiency Repts | |
IR 05000461/1985055 | 22 November 1985 | Insp Rept 50-461/85-55 on 851011-1108.No Violation or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Findings,Preoperational Procedure Review,Preoperational Witnessing & Test Result Verification | |
IR 05000461/1985056 | 27 December 1985 | Insp Rept 50-461/85-56 on 851022-25,30-31 & 1125-27. Violation Noted:Failure to Perform Required Seismic Design Evaluation/Review Per IE Bulletin 79-14 | |
IR 05000461/1985057 | 19 November 1985 | Physical Protection Insp Rept 50-461/85-57 on 851030-1101. No Violations Noted.Major Areas Inspected:Licensee Actions & Progress for Implementation of Security Program.Details Withheld (Ref 10CFR73.21) | Safeguards Contingency Plan |
IR 05000461/1985058 | 27 November 1985 | Insp Rept 50-461/85-58 on 851105-07 & 13.No Violations or Deviations Noted.Major Areas Inspected:Chemistry & Confirmatory Measurements Including Mgt Controls,Training & Qualifications,Audits,Qc & QA | |
IR 05000461/1985059 | 3 December 1985 | Insp Rept 50-461/85-59 on 851112-15.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Preoperational Test Records & Surveillance Testing & Calibr Control | |
IR 05000461/1985060 | 7 April 1986 | Insp Rept 50-461/85-60 on 851111-860306.Violation & Deviation Noted:Failure to Control Activities Affecting Quality & Failure to Perform 24 H Type a Test Per FSAR Paragraph 2 Commitment | |
IR 05000461/1985061 | 8 March 1986 | Insp Rept 50-461/85-61 on 851112-860207.Violation Noted: Jurisdictional Tagging Requirements of Administrative Procedure Changed Inappropriately & Maint Procedure Failed to Conform to IEEE 450-1975 | |
IR 05000461/1985062 | 10 February 1986 | Insp Rept 50-461/85-62 on 851119-860127.No Violation or Deviation Noted.Major Areas Inspected:Review of Quality Records Documenting Geotechnical Const | |
IR 05000461/1985063 | 10 January 1986 | Insp Rept 50-461/85-63 on 851118-1216.Violation Noted: Failure to Follow Procedures for Control of Const Drawing Changes | Reactor Vessel Water Level Hydrostatic Nondestructive Examination Scaffolding |
IR 05000461/1985064 | 21 January 1986 | Safety Insp Rept 50-461/85-64 on 851211-13.No Violation or Deviation Noted.Major Areas Inspected:Action on 50.55 (E) Deficiency Repts & Installed HVAC Sys Related Documentation | Affidavit |
IR 05000461/1985065 | 24 March 1986 | Safety Insp Rept 50-461/85-65 on 851216-860127.No Violation or Deviation Noted.Major Areas Inspected:Const, Preoperational Testing,Operational Preparedness Activities, Employee Concerns & Review of Allegations |