Physical Protection Insp Rept 50-461/85-57 on 851030-1101. No Violations Noted.Major Areas Inspected:Licensee Actions & Progress for Implementation of Security Program.Details Withheld (Ref 10CFR73.21)
ML20136H592
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/19/1985
From: Creed J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20136H540 List:
References
50-461-85-57, NUDOCS 8511250141
Download: ML20136H592 (2)


Text

, 1

..

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-461/85057(DRSS)

Docket No. 50-461 License No. CPPR-137 Licensee: Illinois Power Company 500 South 27th Street Decatur, IL 62525 Inspection At: Clinton, IL Inspection Conducted: October 30 through November 1, 1985 Type of Inspection: Announced Physical Protection Inspection Date of Previous Physical Protection Inspection: August 26 through September 10, 1985

.

Inspector: h L. Pirtle II Date

/1!8[

ysical Security Inspector

{

Approved By: . 178b J(./R. Creed,' Chief Date Safeguards Section Inspection Summary Inspection on October 30 through November 1, 1985 (Report No. 50-461/85057(DRSS))

Areas Inspected: Included a review of the licensee's actions and progress for implementation of the security program. Specifically, the following areas were reviewed: Security Plan and Implementing Procedures; Management Effectiveness -

Security Program; Training and Qualification Plan; Safeguards Contingency Plan; Security Organization; Physical Barriers - Protected Area; Security Program Audits; Access Control - Personnel; Detection Aids - Protected Area; Alarm Stations; Communications; Assessment Aids; and Licensee Actions on Previous Inspection Findings. The inspection involved 23 inspector-hours by one NRC inspector. The onsite inspection began during the day shif Enclosure contains SAFEGUARDS INFORMATICN 8511250141 851119 PDR E " **E*"" "

O ADDCK 05000461 page is Decontrolled PDR

e l

.,

Results: Total implementation of the security plan has been changed from mid-November to mid-December 198 The licensee's progress to date for implementation of the security program, based upon the new implementation date, appeared adequat Fifteen inspection findings were closed during this visit; six new findings were identified. Although progress was noted in the Personnel Screening Program, senior management oversight continues to be warrante Security control and monitoring of certain areas released to security required strengthening and were not monitored to the level within the security force's capabilit Implementation and demonstration of the security program by mid-December 1985 is achievable if sufficient resources and senior management emphasis is devoted to the effor (Details: UNCLASSIFIED )