IR 05000461/1983006

From kanterella
Jump to navigation Jump to search
IE Mgt Meeting Rept 50-461/83-06 on 830317.Major Areas Discussed:Status of Stop Work Recovery & Overinsp & Improvement Programs
ML20204F995
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/07/1983
From: Hayes D, James Keppler, Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20204F984 List:
References
50-461-83-06, 50-461-83-6, NUDOCS 8305020339
Download: ML20204F995 (3)


Text

. .__ _ _ __

,

.

.

U. S.' NUCLEAR REGULATORY COMMISSION

REGION III

<

Report No. 50-461/83-06(DPRP)

. Docket No. 50-461 License No. CPPR-137 Licensee: Illinois Power. Company 500 South 27th Street

.

Decatur, IL 62525 Facility Name: Clinton Power Station, Unit 1

Meeting At
U. S. Nuclear Regulatory Commission Region III Office 799 Roosevelt Road Glen Ellyn, IL 60137

,

'

Meeting Conducted: March 17 1983

$~ Ott MeetingAttendees:s ham,e$

Regional Administrator G. Keppler ([7!D Richa C , C ief I3 Projects Branch 1

~

'

(RC *Wu > c-4 D. W. Hayes, Ch f ,

Projects Section 1B .

'

.

Approved By:

4EYh&

C. E. Norelius, Director b '

1 Division of Project and Resident Programs J

Meeting Summary l Meeting on March 17, 1983 (Report No. 50-461/83-06(DPRP))

Subjects Discussed: A meeting was held with corporate officers and staff of

the Illinois Power Company at the NRC Region III office in Glen Ellyn, Illinois.

l The purpose of the meeting was to discuss the status of stop work recovery and j overinspection programs and the improvement progra !

l i

'

8305020339 830408 PDR ADOCK 05000461 PM G

, -, ---.-..__-_....-._m,,.,.#---,_.-,, .,,,,,..,,,,,,-.,-..,_,-..,--,.-....,,....,_.y..,_- -

- - , - . - . , - - . , - _ . . . - - . , , _ , . , , , - _ , . . . - . - . ~ , . . . . - - - -

_ _

o

.

DETAILS Meeting Attendees

. Illinois Power Company W. G. Kelly, Chairman and President-W. C. Gerstner, Executive Vice President D. P. Hall, Vice President, Quality Assurance, Engineering and Operations

L. J. Koch, Vice President

'

J. H. MacKinnon, Project Manager W. Connel, Manager of Quality Assurance ,

$ Baldwin Associates .

J. E. Findley, Manager, Quality and Technical Services U. S. Nuclear Regulatory Commission Keppler, Regional Administrator Davis, Deputy Regional Administrator Norelius, Director, Division of Project and Resident Programs Knop, Chief, Projects Branch 1 Little, Chief, Engineering Programs Branch Hayes, Chief, Projects Branch 1 A. Schwencer, NRR Chief, Licensing Branch 2  ;

H. H. Livermore, Senior Resident Inspector

F. J. Jablonski, Project Inspector

< Meeting Details -

A meeting was held at NRC's request in the NRC Region III office in Glen Ellyn, Illinois, on March 17, 1983 to discuss Illinois Power Company's status of the improvement program as follows:

.

. Nuclear Program Management

. Verification Program

. Quality' Recovery Program i

'

Mr. W. C. Gerstner of Illinois Power Company discussed recent organization changes. At the end of March 1983 Mr. L. J. Koch will retire. Mr.' Koch's responsibilities of Station Startup and Operations and Nuclear Station Engineering have been assumed by Mr. D. P. Hal Mr. Hall's responsibil--

!.

ities for quality assurance will continu Mr. D. P. Hall of Illinois Power Company made a presentation of the status of the Improvement Program. Most of the individual programs and

-2-

'

i i

. . - . _ _ . _ , . - _ . . . _ . _ .__. ._, . . , . . . _ _ _ , _ . _ _ . . . _ - . . __ ...._-.._. _ . _ . - . , - _ . - _ -

-

.

a plans have been submitted to the NRC for review or concurrenc Mr. Hall requested that NRC review and possibly adjust the require-ment to clear the inspection backlog and reduce NCRs/DRs prior to commencement of new work in the areas affected by stop work actio NRC agreed to the revie (It is noted that in NRC letter to Illinois Power Company dated December 20, 1982, the main concern about NCRs/DRs was the time to disposition NCRs and DRs. Long disposition time has been identified as a chronic problem.)

Mr. Hall's presentation is included as an attachment to this repor Mr. J. H. MacKinnon of Stone & Webster Engineering Company made a presentation of Illinois Power Company's construction action plan for estimating, scheduling and forecasting the remainder of constructing the Clinton power station. Mr. MacKinnon also described the use of Level I, II, and III scheduling and planning methods. The discussion included the planning and scheduling of reutine inspector needs, but not how the required resources would be fed back into the planning and scheduling system if schedules were perturSated or inspectors were required to perform nonroutine inspections. Special attributes will be reviewed during routine inspection activit This meeting was part of a series of meetings used b/ Illinois Power Company to report the steps taken to improve the management, construction, and inspection activities at the Clinton Nuclear facility. There was no date set for a future meetin Attachment: As stated-3-