Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML012490526 | 22 February 2002 | Issuance of Amendments Security Plan Changes | |
ML013240680 | 4 January 2002 | Issuance of Amendment Change to Technical Specifications 28 Volt D.C. Distribution (Tac Nos. MB2042 and MB2043) | Anticipated operational occurrence |
ML020040143 | 5 November 2002 | Issuance of Amendments 254 & 235 to Licenses DPR-70 & DPR-75, Respectively, Deleting TS Section 6.8.4.e & License Condition 2.C.25, Eliminating the Requirements to Have & Maintain the Post-Accident Sampling Program | Grab sample |
ML020530440 | 21 March 2002 | Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request S2-RR-B04 | Incorporated by reference |
ML020720154 | 11 April 2002 | Issuance of Amendment 232, Containment Leakage Rate Testing Program | Probabilistic Risk Assessment Large early release frequency Moisture barrier |
ML021300259 | 3 June 2002 | Correction Ltr to the Issuance of Amendment Re Containment Leakage Rate Testing Program | Probabilistic Risk Assessment Large early release frequency Moisture barrier |
ML022390335 | 11 October 2002 | Units, 1 and 2, License Amendments 253 and 234, Modifying the Prvisions Under Which Equipment May Be Considered Operable When Either Its Normal or Emergency Power Source Inoperable | Offsite Circuit |
ML022460003 | 10 October 2002 | Units, 1 and 2, Issuance of License Amendments 252 and 233 Containment Spray Nozzles | Foreign Material Exclusion |
ML022470409 | 3 February 2003 | Relief, Use of ASME Code Case N-532-1, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission, MB6089 | |
ML022530356 | 27 November 2002 | Evaluation of Relief Request S-RR-A06 | |
ML022550681 | 7 October 2002 | Code Relief, ASME Code Section XI, Inservice Inspection Program Requirements Related to Pressure Testing of Class 3 Components | Hydrostatic VT-2 Incorporated by reference Pressure boundary leak |
ML022670045 | 15 October 2002 | Evaluation of Relief Request HC-RR-W01 | Incorporated by reference |
ML022770181 | 10 October 2002 | Issuance of License Amendments 251 and 232 Refueling Operations - Fuel Decay Time Prior to Commencing Core Alterations or Movement of Irradiated Fuel | Ultimate heat sink |
ML022830715 | 27 November 2002 | Relief Request, Evaluation of Relief Request SC-RR-A01, TAC Nos. MB5569 & MB5570 | Boric Acid VT-2 |
ML030160750 | 16 January 2003 | Relief, ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-B01 and S1-RR-C01 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML030790180 | 10 April 2003 | License Amendment, Technical Specification 6.12, High Radiation Area | High Radiation Area |
ML031060456 | 16 April 2003 | License Amendment, Missed Surveillances Using Consolidated Line Item Improvement Process | Enforcement Discretion Probabilistic Risk Assessment Missed surveillance Large early release frequency |
ML031260059 | 5 May 2003 | Plant Systems Branch Safety Evaluation of Salem Unit 1 and 2 Request for Deviation from Appendix R to 10 CFR Part 50 | Safe Shutdown Exemption Request Fire Protection Program |
ML031530129 | 2 June 2003 | Correction to the Safety Evaluation Relating to Generic Letter 96-06 (TAC Nos. M96860 and M96861) | |
ML031640004 | 13 June 2003 | License Amendments 257 & 238, Revise Steam Generator Low-Low Level Setpoints | Anticipated operational occurrence |
ML031960644 | 16 July 2003 | Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Third 10--Year Interval, Relief Request S1-RR-B02 | Nondestructive Examination Incorporated by reference |
ML032090200 | 28 July 2003 | Relief, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-F01, MB6098 | Nondestructive Examination Incorporated by reference |
ML032370119 | 1 October 2003 | Issuance of License Amendments Table 3.31, Reactor Trip System Instrumentation | |
ML032390034 | 1 October 2003 | Risk-Informed Inservice Inspection Program | Probabilistic Risk Assessment Incorporated by reference Large early release frequency Dissimilar Metal Weld |
ML032690327 | 29 December 2003 | Evaluation of Relief Request, S2-12-RR-A16 | Incorporated by reference Dissimilar Metal Weld |
ML033000533 | 27 October 2003 | Correction to Risk-Informed Inservice Inspection Program Safety Evaluation | Probabilistic Risk Assessment Incorporated by reference Large early release frequency Dissimilar Metal Weld |
ML033010379 | 28 October 2003 | Issuance of Amendment Nos. 260 and 241, Respectively, Modifying Technical Specification Surveillance Requirements 4.3.1.1.3 & 4.3.2.1.3 Relating to Response Time Testing of Engineered Safety Features Actuation System | |
ML033370985 | 2 January 2004 | Relief Request Review, Evaluation of Relief Requests S2-RR-03-V01 and S2-RR-03-V02 | Stroke time Incorporated by reference |
ML033650405 | 6 February 2004 | Issuance of License Amendments 262 & 244 Spent Fuel Pool Boron Concentration | Probabilistic Risk Assessment Fuel cladding |
ML040070291 | 7 January 2004 | License Amendment, Issuance of Amendment, Request for Changes to License Condition 2.C.(10) | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Emergency Lighting Fire Protection Program |
ML040290505 | 29 January 2004 | License Amendment, Issuance of Amendment, Radioactive Effluents - Explosive Gas Mixture | |
ML040920361 | 23 April 2004 | Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | Nondestructive Examination |
ML041190161 | 5 May 2004 | Evaluation of Relaxation Request No. S1-RR-13-B21 Re. First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | Nondestructive Examination Finite Element Analysis |
ML042450476 | 16 September 2004 | Units, 1 and 2, License Amendments 263 and 245, Relax Technical Specification Requirements Applicable During Movement of Irradiated Fuel | Probabilistic Risk Assessment Recently irradiated fuel |
ML050800154 | 1 April 2005 | Extension of Risk-Informed Inservice Inspection Applicability | Non-Destructive Examination Exemption Request EVT-1 Liquid penetrant |
ML050800251 | 1 April 2005 | License Amendments, Modify Technical Specification Definition of Operable | Shutdown Margin Offsite Circuit |
ML051150379 | 29 April 2005 | Evaluation of Relief Request S2-13-RR-A06 | Incorporated by reference |
ML051180344 | 4 May 2005 | Evaluation of Relief Request S2-13-RR-F01 | Incorporated by reference |
ML051450002 | 9 September 2005 | Issuance of Amendments to Extend the Inspection Interval for Reactor Coolant Pump Flywheels | Probabilistic Risk Assessment |
ML052370011 | 13 September 2005 | Evaluation of Steam Generator Tube Inspection Results for 2003 | |
ML052380072 | 13 September 2005 | Evaluation of Steam Generator Tube Inspection Results for 2004 | |
ML052580266 | 30 September 2005 | Evaluation of Relief Requests S1-RR-04-V01 and S1-RR-04-V02 Related to the Third 10-Year Interval Inservice Testing Program | Stroke time Incorporated by reference |
ML052650368 | 30 September 2005 | License Amendments, Revise Non-Conservative Technical Specifications Related to Containment Fan Cooler Units | |
ML052720233 | 14 October 2005 | Issuance of Amendments Steam Generator Tube Inservice Inspection Program | Non-Destructive Examination Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Pressure Boundary Leakage Flow Induced Vibration |
ML052770347 | 14 October 2005 | Issuance of License Amendments 267 and 249 Emergency Core Cooling System Accumulators | Probabilistic Risk Assessment Large early release frequency |
ML053420242 | 11 January 2006 | Issuance of License Amendments 269 and 250 Deletion of Reactor Coolant System Volume | |
ML053630206 | 31 May 2006 | License Amendments 273 and 254 Emergency Core Cooling System Requirements When Tavg <350 F | Anticipated operational occurrence Hydrostatic |
ML060040322 | 17 February 2006 | Issuance of License Amendments 271 and 252 Alternate Source Term | Boric Acid Offsite Dose Calculation Manual Probabilistic Risk Assessment Fuel cladding |
ML060110540 | 11 January 2006 | License Amendments, Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports | |
ML061070039 | 2 May 2006 | Corrections to Safety Evaluation for Amendment No. 271 and No. 252, Respectively, Alternate Source Term |