Letter Sequence Other |
---|
|
|
MONTHYEARML0223903352002-10-11011 October 2002 Units, 1 and 2, License Amendments 253 and 234, Modifying the Prvisions Under Which Equipment May Be Considered Operable When Either Its Normal or Emergency Power Source Inoperable Project stage: Other ML0228805422002-10-11011 October 2002 Units, 1 and 2, Tech Spec Pages for License Amendments 253 and 234 Change to Technical Spectifications - Normal and Emergency Power Project stage: Other 2002-10-11
[Table View] |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N21-0030, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater2021-06-17017 June 2021 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements LR-N19-0047, License Amendment Request to Relocate Technical Specifications (TS) 3.9.3 and 3.9.12 to the Technical Requirements Manual (TRM)2019-06-28028 June 2019 License Amendment Request to Relocate Technical Specifications (TS) 3.9.3 and 3.9.12 to the Technical Requirements Manual (TRM) ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16279A4052016-11-0202 November 2016 Issuance of Amendments Chilled Water System Modification ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 ML16096A4192016-04-28028 April 2016 Issuance of Amendments Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML16054A0682016-03-28028 March 2016 Issuance of Amendments Regarding Revision to Reactor Trip System Instrumentation Technical Specifications ML16035A0872016-03-0707 March 2016 Issuance of Amendments New Technical Specifications to Isolate Unborated Water Sources in Mode 6 ML15245A6362015-09-0404 September 2015 Issuance of Emergency Amendment Regarding Removal of Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Technical Specifications ML15153A2302015-07-30030 July 2015 Issuance of Amendments Adopting Technical Specification Task Force (TSTF)-510, Rev, 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection(Tac Nos. MF4574 & MF457 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML15063A2932015-03-30030 March 2015 Issuance of Amendments Revision to Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor ML14323A9742014-12-23023 December 2014 and Salem Nuclear Generating Station, Units 1 and 2, Issuance of Amendments Revision to Cyber Security Plan Implemenation Schedule and Conditions ML13301A1242013-11-27027 November 2013 Issuance of Amendments Regarding Change to PSEG Emergency Plan to Remove the Backup R45 Plant Vent Radiation Monitor Indications ML13171A0632013-07-17017 July 2013 Issuance of Amendments Revision to Technical Specification 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System. ML13072A1052013-03-28028 March 2013 Issuance of Amendments Revision to Technical Specification 6.8.4.i, Steam Generator Program, and Technical Specifications 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate ML12335A2212012-12-10010 December 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security Plan ML1120203592011-08-25025 August 2011 Issuance of Amendments Technical Specification Requirements for Snubbers ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan 2023-08-14
[Table view] Category:Safety Evaluation
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping ML22130A7912022-05-24024 May 2022 Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited Examinations ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20104A1862020-04-20020 April 2020 Issuance of Alternative Request SC-I4R-192 for Examination of ASME Code, Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval ML20091K7302020-04-13013 April 2020 Issuance of Relief Request SC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19050A3702019-03-0606 March 2019 Alternative to Reactor Vessel Nozzle Welds Examinations Inspection Interval (EPID-L-2018-LLR-0110) ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18142B1262018-05-29029 May 2018 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17304A9432017-11-0101 November 2017 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17172A5872017-07-17017 July 2017 Safety Evaluation of Relief Request S1-I4R-160 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16351A1822017-01-19019 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 2023-08-14
[Table view] |
Text
October 11, 2002 Mr. Harold W. Keiser Chief Nuclear Officer & President PSEG Nuclear LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, ISSUANCE OF AMENDMENT RE: CHANGE TO TECHNICAL SPECIFICATIONS -
NORMAL AND EMERGENCY POWER (TAC NOS. MB3453 AND MB3454)
Dear Mr. Keiser:
The Commission has issued the enclosed Amendment Nos. 253 and 234 to Facility Operating License Nos. DPR-70 and DPR-75 for the Salem Nuclear Generating Station, Unit Nos. 1 and 2. These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated November 1, 2001, as supplemented on October 1, 2002.
These amendments modify the provisions under which equipment may be considered operable when either its normal or emergency power source is inoperable. TS Section 3.0.5 was deleted and additional limiting conditions for operation were incorporated into electrical power systems TS 3.8.1.1, A.C. Sources - Operating. The corresponding TS Bases were modified accordingly. The proposed changes are consistent with the recommendations contained in NUREG-1431, Rev. 2, Standard Technical Specifications for Westinghouse Plants.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Robert J. Fretz, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosures:
- 1. Amendment No. 253 to License No. DPR-70
- 2. Amendment No. 234 to License No. DPR-75
- 3. Safety Evaluation cc w/encls: See next page
ML022390335 OFFICE PDI-2/PM PDI-2/LA RORP* EEIB* OGC* PDI-2/SC (A)
NAME RFretz SLittle, changes only RDennig CHolden CBray JAndersen DATE 10/11/02 10/11/02 09/18/02 09/24/02 10/03/02 10/11/02 PSEG Nuclear LLC Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:
Mr. Elbert C. Simpson Dr. Jill Lipoti, Asst. Director Senior Vice President & Radiation Protection Programs Chief Administrative Officer NJ Department of Environmental PSEG Nuclear - N19 Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Mark B. Bezilla Richard Hartung Vice President - Technical Support Electric Service Evaluation PSEG Nuclear - N10 Board of Regulatory Commissioners P.O. Box 236 2 Gateway Center, Tenth Floor Hancocks Bridge, NJ 08038 Newark, NJ 07102 Mr. David F. Garchow Regional Administrator, Region I Vice President - Operations U.S. Nuclear Regulatory Commission PSEG Nuclear - X10 475 Allendale Road P.O. Box 236 King of Prussia, PA 19406 Hancocks Bridge, NJ 08038 Senior Resident Inspector Mr. Gabor Salamon Salem Nuclear Generating Station Manager - Nuclear Safety and Licensing U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 Drawer 0509 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348 Lower Alloways Creek Township c/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038
PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.253 License No. DPR-70
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for amendment filed by the PSEG Nuclear LLC and Exelon Generation Company, LLC (the licensees) dated November 1, 2001, as supplemented on October 1, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 253 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
James W. Andersen, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 11, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 253 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages XIV XIV 3/4 0-2 3/4 0-2 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2
3/4 8-2a
3/4 8-2b B 3/4 0-4 B 3/4 0-4 B 3/4 0-4a B 3/4 0-4a B 3/4 8-1 B 3/4 8-1 B 3/4 8-1a -------------
B 3/4 8-2 B 3/4 8-3 B 3/4 8-3 B 3/4 8-4 B 3/4 8-4
PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 234 License No. DPR-75
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for amendment filed by the PSEG Nuclear LLC and Exelon Generation Company, LLC (the licensees) dated November 1, 2001, as supplemented on October 1, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 234 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
James W. Andersen, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 11, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 234 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages XIV XIV 3/4 0-2 3/4 0-2 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2
3/4 8-2a
3/4 8-2b B 3/4 0-4 B 3/4 0-4 B 3/4 0-4a B 3/4 0-4a B 3/4 8-1 B 3/4 8-1 B 3/4 8-1a -------------
B 3/4 8-2 B 3/4 8-3 B 3/4 8-3 B 3/4 8-4 B 3/4 8-4
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 253 AND 234 TO FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311
1.0 INTRODUCTION
By letter dated November 1, 2001, as supplemented on October 1, 2002, PSEG Nuclear LLC (the licensee) submitted a request for changes to the Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem), Technical Specifications (TSs). The requested changes would modify the provisions under which equipment may be considered operable when either its normal or emergency power source is inoperable. TS Section 3.0.5 was deleted and additional limiting conditions for operation (LCOs) were incorporated into electrical power systems TS 3.8.1.1, A.C. Sources - Operating. The corresponding TS Bases were modified accordingly. The proposed changes are consistent with the recommendations contained in NUREG-1431, Rev. 2, Standard Technical Specifications for Westinghouse Plants. The October 1, 2002, supplement was within the scope of the original application and did not change the staffs no significant hazards consideration determination.
2.0 BACKGROUND
The licensee proposed to delete the current Salem TS 3.0.5, LCO, and modify TS 3.8.1.1, Electrical Power Systems - A.C. Source - Operating, as indicated below. The corresponding Bases will be modified accordingly. The proposed phrases to be changed or added are shown in bold.
2.1 Proposed Change to TS 3.0.5 This specification is being deleted.
2.2 Proposed Changes to Sections a, b, and d of TS 3.8.1.1
- a. With an independent A.C. circuit of the above required A.C. electrical power sources inoperable:
- 1. Demonstrate the OPERABILITY of the remaining independent A.C. circuit by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and
- 2. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, declare required systems or components with no offsite power available inoperable when a redundant required system or component is inoperable, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and
- 3. Restore the inoperable independent A.C. circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With one diesel generator of the above required A.C. electrical power sources inoperable:
- 1. Demonstrate the OPERABILITY of the independent A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and
- 2. Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, declare required systems or components supported by the inoperable diesel generator inoperable when a required redundant system or component is inoperable, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and
- 3. Determine the two remaining OPERABLE diesel generators are not inoperable due to common cause failure or perform Surveillance Requirement 4.8.1.1.2.a.2 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If the diesel generator is inoperable for preventive maintenance, the two remaining OPERABLE diesel generators need not be tested nor the OPERABILITY evaluated; and
- 4. In any case, restore the inoperable diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- d. With two of the above independent A.C. circuits inoperable:
- 1. Demonstrate the OPERABILITY of three diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.2 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the diesel generators are already operating; and
- 2. Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, declare required systems or components supported by the inoperable offsite circuits inoperable when a required redundant system or component is inoperable, or be in at
least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and
- 3. Restore at least one of the inoperable independent A.C. circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; and
- 4. With only one of the independent A.C. circuits OPERABLE, restore the other independent A.C. circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
3.0 REGULATORY EVALUATION
General Design Criterion (GDC)-17, Electric Power System, of Appendix A, General Design Criterion for Nuclear Power Plants, to Title 10 of the Code of Federal Regulations (10 CFR)
Part 50 requires, in part, that nuclear power plants have an onsite and offsite electric power system to permit the functioning of structures, systems, and components important to safety.
The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure, and the offsite system is required to be supplied by two independent circuits. In addition, this criteria requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as the result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.
GDC-18, Inspection and Testing of Electric Power System, requires that electric power systems important to safety be designed to permit appropriate periodic inspection and testing.
From the Final Safety Analysis Report, the licensee provided the following configuration for the electrical power supply system for Salem. The 4160-V system at Salem is divided into four group bus sections, three vital bus sections, and two circulating water bus sections. The vital buses are fed directly from 13-kv to 4-kV station power transformers T13, T14 (Unit 1) and T23, T24 (Unit 2). During normal operation, two of the vital buses are supplied from one station power transformer and the third from the other station power transformer. The tie breakers between these sections are normally open. The in-feed breakers on each vital bus from the two station power transformers are electrically interlocked to prevent paralleling both sources through a vital bus. These in-feed breakers provide a means for transferring power between sources in the event of an interruption of power from one source. In the event the normal source to a 4-kV bus becomes unavailable, that bus is automatically transferred to its alternate source. In the event all offsite power is lost, the standby diesel generators automatically start and the normal in-feed breakers to each 4-kV vital bus are opened. When the diesel generator is up to speed and voltage, its generator breaker is closed to energize that 4-kV bus. An interlock from the diesel generator breaker prevents closure of either in-feed breaker to that bus, thereby preventing any interconnection between redundant 4-kV buses.
4.0 TECHNICAL EVALUATION
4.1 Proposed Change to TS 3.0.5 TS 3.0.5 delineates what additional conditions must be satisfied to permit plant operation to continue when an individual system or equipment would otherwise be considered inoperable because its normal or emergency power source is not operable. This specification permits continued operation provided that no portion of the redundant system in another division is inoperable for any reason. The provisions of this specification permit the action statements associated with individual systems, subsystems, trains, components, or devices to be consistent with action statements of the associated electrical power source. It is intended to allow operation to be governed by the time limits of the action statement associated with the LCO of the normal or emergency power source, rather than the corresponding action statement for each affected system or component. The initial time frame for determining that the conditions of TS 3.0.5 are satisfied is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, otherwise shutdown to hot standby must commence within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
The proposed deletion of TS 3.0.5 and revision to TS 3.8.1.1 extends the allowable action time for complying the specified conditions beyond the current 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the following initiating events: a single emergency diesel generator (EDG) inoperable, a single inoperable offsite power circuit, and two inoperable offsite power circuits. This change is consistent with NUREG-1431, Revision 2, Standard Technical Specifications for Westinghouse Plants, continues to maintain plant safety, and therefore, is acceptable.
4.2 Proposed Change to TS 3.8.1.1 The proposed changes are consistent with Westinghouse Standard Technical Specification (STS), 3.8.1, AC Sources - Operating, in NUREG-1431. STS initiates action (within 4, 24, or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, respectively, for loss of a single EDG, a single offsite circuit or two offsite circuits) upon discovery of no offsite power or diesel inoperability concurrent with inoperability of the required redundant systems or components. Further, action required by STS is to declare inoperable the required systems or components with no normal or emergency power available, when a redundant system or component is also inoperable.
The licensee stated that the proposed change will avoid overly restrictive actions that could entail unnecessary shut down of the plant. Under present TS requirements, operators only have 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> following inoperability of a normal or emergency power source to verify that systems and equipment supported by that power supply are operable, along with their redundant system and equipment. Should this condition not be satisfied, the plant must be placed in hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, hot shutdown in the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and cold shutdown in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This is more restrictive than the stated purpose of the current TSs, which is to allow the associated electrical systems action statement to govern required time frames. The existing requirements place an undue burden on plant operators and subjects the plant to shutdown transient, with no corresponding increase in safety.
The proposed change will provide significantly greater flexibility in completing the required actions. Operators have up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train, concurrent with inoperability of redundant required system or components, to declare the supported equipment inoperable. For loss of power from two offsite circuits, that time frame is
reduced to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for the loss of emergency power from an EDG. Declaring the supported equipment inoperable, initiates a new action under the LCO for that equipment, during which operators have an additional opportunity to restore the affected equipment to operable status before commencing a plant shutdown. This is intended to allow the operator adequate time for evaluation and repair. Further, the proposed changes also provide the normal time for initiating the allowed outage time clock. This time clock only begins upon discovery of no normal or emergency power to a train, concurrent with a required system or component on the other train becoming inoperable. Based on the above review, the Nuclear Regulatory Commission (NRC) staff finds the proposed change to TS 3.8.1.1 is consistent with NUREG-1431, Revision 2, continues to maintain plant safety, and therefore is acceptable.
The NRC staff concludes that the proposed change will avoid overly restrictive actions that could entail the unnecessary shutdown of the plant. The existing TS requirements place an undue burden on plant operators and subjects the plant to a shutdown transient, with no corresponding increase in safety. The staff also concludes that the proposed change does not affect Salems compliance with the requirements of GDC-17 and 18 and is consistent with NUREG-1431, Revision 2. Further, Salem continues to meet the requirements of GDC-17 and 10 CFR 50.36, therefore, the change is acceptable.
4.3 Administrative Changes The licensee also proposes to make two administrative changes. Section 3/4.8.3 page location on Index page XIV was changed from page B3/4 8-3 to B3/4 8-4 to reflect the added text for Sections 3/4.8.1 and 3/4.8.2. This change in page location for Section 3/4.8.3 on Index page XIV is administrative in nature, and therefore is acceptable.
The second administrative change reflects the addition of page 3/4 8-2b which states, THIS PAGE INTENTIONALLY LEFT BLANK. This change accommodates insertion into hardcopy binders the added text of TS 3.8.1.1 on page 3/4 8-2a without affecting subsequent pagination.
Because this change is administrative in nature this change is acceptable.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey State official was notified of the proposed issuance of the amendments. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (67 FR 5331). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: D. Nguyen N. Le Date: October 11, 2002