Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance16 May 2013Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump PerformanceMission time
Coatings
ML02063002612 February 2002Special Report 3-SR-2001-001-01
ML02066052922 February 2002Fitness-for Duty Program Semiannual Performance ReportFitness for Duty
ML02127033719 April 2002Periodic Report of Commitment ChangesSafe Shutdown Earthquake
ML02135022712 April 2002Special Report 2-SR-2002-001 Re Steam Generator Tube Plugging
ML02239057622 August 2002Fitness-for-Duty Program Semiannual Performance ReportFitness for Duty
ML02261070311 September 2002Special Report 2-SR-2002-001-01
ML02309032529 October 2002Special Report 1-SR-2002-002
ML02330041221 November 2002Supplement to Request for a License Amendment to Support Replacement of Steam Generators & Uprated Power OperationsAnticipated operational occurrence
Coast down
Power Uprate
Affidavit
ML03064006626 February 2003Fitness-for-Duty Program Semiannual Performance ReportFitness for Duty
ML0309806332 April 2003Response to Request for Additional Information Regarding Relaxation Request to NRC Order EA-03-009
ML0312801571 May 2003Special Report 3-SR-2003-003 Steam Generator Tube Plugging
ML0316201774 June 2003ISFSI, Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX003 & Report of Cask Performance
ML03189034910 July 2003Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Palo VerdeEnforcement Discretion
ML03198001318 July 2003Misc Report ,Stars, 6/10-11/2003 Licensing Workshop Held in Overland Park, Kansas with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group for Licensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, So Texas
ML0323103338 August 2003Fitness-For-Duty Program Semiannual Performance ReportFitness for Duty
ML0406906472 March 2004Fitness-For-Duty Program Semiannual Performance Report for Reporting Period of 07/01/2003 - 12/31/2003Fitness for Duty
ML04121022715 April 2004Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual ReportFuel cladding
ML04218022330 July 2004Fitness-For-Duty Program Semiannual Performance ReportFitness for Duty
ML04245004530 June 2004Reformatted Technical Report SIR-04-045, Revision 0, Supporting the Palo Verde Pressurizer Heater Sleeve Mid-Wall Repair
ML04296031917 June 2004Information Needed for Risk Analysis of Loss of Offsite Power Events
ML04296034328 June 2004Evaluation of CVCS Soft Parts Due to High Temperature Letdown Event.
ML0429603601 July 2004Report Regarding Voltage Regulator Cabinet
ML0429603662 July 2004Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Relating to MSIS Impact on AF-A Operability (6/14/04 Three Unit LOOP Trip).
ML0429603892 July 2004Report Regarding Problem Identification
ML0429604502 July 2004Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Relating to Charging Pump E Operation (Unit 2 6/14/04 LOOP Trip).
ML0429604532 July 2004Discussion and Proposed Resolution of NRC AIT URI (Unresolved Issue) Concerning Tech Spec Tracking During the Following EOP Use (Unit 2 6/14/04 LOOP Trip).
ML04296049618 October 2004LOOP Risk AssessmentSignificance Determination Process
ML0429605945 June 2002Letter from Robert Smith to Nancy Bruce, Steve Kessler, Harvey Leake, Stephen Pease Records of Final Report for 2002 Palo Verde Hassayampa Operating Study
ML0504503534 February 2005Submittal of Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary ResultsProbabilistic Risk Assessment
Large early release frequency
ML05054025815 February 2005Attachment 2-F, 13-NS-C074, Rev 0, Significance Determination of Containment Sump Air Entrainment.Safe Shutdown
High winds
Mission time
Internal Flooding
Earthquake
ML05126034818 April 2005Special Report 1-SR-2004-002-01 Re Results of the Steam Generator Tube Inservice Inspection Performed During Unit 1 Eleventh Refueling Outage
ML05138042628 April 2005Core Operating Limits Reports (Colr), Unit 1- Revision 13, Unit 2- Revision 12, and Unit 3- Revision 15Shutdown Margin
ML05173041415 June 2005Redacted Version of Proprietary Submittal Dated February 24, 2005 Regarding ECCS Pump Testing and Safety Significance Assessment
ML05179034921 June 2005List of References Associated with ASME Code Case N-499 to Support NRC Review of Inservice Inspection (ISI) Program Relief Request No. 33 for Pressurizer Base Material HeatingFinite Element Analysis
Earthquake
Fatigue Rule
ML05194047328 February 2005Attachment 2-E, DAR-OA-05-3, Revision 0, Report of SBLOCA Analyses with Degraded ECCS Flow After RAS Performed for Arizona Public Service in Support of Palo Verde Nuclear-Generating Station Units 1, 2, and 3Loop seal
Past operability
ML05250041019 August 2005Special Report 3-SR-2005-001 Report of Boron Deposit at Control Element Drive Mechanism VentBoric Acid
ML05250059125 August 2005Fitness-For-Duty Program Semiannual Performance ReportFitness for Duty
ML0525601385 July 2005Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided PipingProbabilistic Risk Assessment
ML05304006718 October 2005Special Report 2-SR-2005-002, Boron Deposit at Control Element Drive Mechanism VentBoric Acid
ML05312039028 October 2005Revised Station Blackout EvaluationSafe Shutdown
Emergency Lighting
ML0531301122 November 2005Draft Portions of the AIT Report
ML05322046114 June 2004Power Reactor Status Report for 6/14/04
ML05341041116 November 2005Results of the Investigation of the June 14, 2004 230 Kv Transmission Line Fault
ML0534802035 December 2005Report of Boron Deposit at Control Element Drive Mechanism VentBoric Acid
ML06020057513 January 2006Revised Redacted Version of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results Dated December 27, 2004Probabilistic Risk Assessment
ML06020057713 January 2006Revised Redacted Version of Response to Information Request Dated February 24, 2005
ML06072002623 February 200660-Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E, NRC Bulletin 2003-02, Commitment No. 3 and NRC Bulletin 2004-01, Commitment No. 2 - U1R12.Boric Acid
Nondestructive Examination
VT-2
Through-Wall Leakage
ML06072005028 February 2006Fitness-For-Duty Semiannual Performance Report for Period July 1, 2005 Through December 31, 2005Fitness for Duty
ML06089045717 March 2006Cycle 13 Startup Report