Special Report 3-SR-2003-003 Steam Generator Tube Plugging
ML031280157
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/01/2003
From: Overbeck G
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
192-01117-GRO/SAB/DGM 3-SR-2003-003
Download: ML031280157 (3)


Text

---l 1 A MeS Technical Specification 5.6.8 Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Senior Vice President TEL (623) 393-5148 PO Box 52034 Generating Station Nuclear FAX (623) 393-6077 Phoenix, AZ 85072-2034 192-011 17-GRO/SAB/DGM May 1, 2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington,-D.C. 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 License No. NPF-74 Docket No. STN 50-530 Special Report 3-SR-2003-003 Steam Generator Tube Plugging Attached please find Special Report 3-SR-2003-003 prepared and submitted pursuant to Technical Specifications (TS) Reporting Requirement 5.6.8. This report discusses steam generator tube plugging in Unit 3. Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 18, 2004. Copies of the Special Report are being forwarded to the Regional Administrator, NRC Region IV and the PVNGS Resident Inspector.

No commitments are being made to the NRC by this letter.

If you have any questions, please contact Daniel G Marks at (623) 393-6492.

Sincerely, GRO/SAB/DGM/kg __I ' Ai'/

Attachment cc: E. W. Merschoff (all with attachment)

J. N. Donohew N. L. Salgado A member of the STARS (Strategic Teaming and Resource Sharing) Alliance A (D 7 Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Attachment Special Report No. 3-SR-2003-003

Palo Verde Nuclear Generating Station Unit 3 Steam Generator Tube Plugging License No. NPF-74 Docket No. STN 50-530 Special Report No. 3-SR-2003-003 This Special Report is being provided pursuant to Palo Verde Unit 3 Technical Specifications (TS) Reporting Requirement 5.6.8 to report the number of steam generator tubes plugged and/or repaired as a result of inservice inspection activities.

On April 18, 2003, Unit 3 was defueled during a refueling outage when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of 51 tubes in Steam Generator No. 1 and 98 tubes in Steam Generator No. 2.

Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 18, 2004