Palo Verde Nuclear Generating Station William E. Ide Vice President Nuclear Production Technical Specification 5.6.8 Mail Station 7602 TEL (623) 393-6116 P.O. Box 52034 FAX (623) 393-6077 Phoenix, AZ 85072-2034 192-01104-WEI/DGM/DFH April 12, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Special Report 2-SR-2002-001 Attached please find Special Report 2-SR-2002-001 prepared and submitted pursuant to Technical Specifications (TS) Reporting Requirement 5.6.8. This report discusses steam generator tube plugging in Unit 2. Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 8, 2003. Copies of the Special Report are being forwarded to the Regional Administrator, NRC Region IV and the PVNGS Resident Inspector.
No commitments are being made to the NRC by this letter.
If you have any questions, please contact Daniel G. Marks, Section Leader, Regulatory Affairs, Compliance, at (623) 393-6492.
Sincerely, g
WEI/DG M/DFH/kg Attachment cc:
E. W. Merschoff J. N. Donohew J. H. Moorman (all with attachment)
'/
1/7
.4 \\
'-x A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project v Wolf Creek
Attachment Special Report No. 2-SR-2002-001
Palo Verde Nuclear Generating Station Unit 2 Steam Generator Tube Plugging Docket No. STN 50-529 Special Report No. 2-SR-2002-001 This Special Report is being provided pursuant to Palo Verde Unit 2 Technical Specifications (TS) Reporting Requirement 5.6.8 to report the number of steam generator tubes plugged and/or repaired as a result of inservice inspection activities.
On April 8, 2002, Unit 2 was defueled during a refueling outage when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of 127 tubes in Steam Generator No. 1 and 207 tubes in Steam Generator No.
2.
Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 8, 2003.