Special Report 2-SR-2002-001 Re Steam Generator Tube Plugging
ML021350227
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/12/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
192-01104-WEI/DGM/DFH 2-SR-2002-001
Download: ML021350227 (3)


Text

Ail Technical Specification 5.6.8 William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 192-01104-WEI/DGM/DFH April 12, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 Special Report 2-SR-2002-001 Attached please find Special Report 2-SR-2002-001 prepared and submitted pursuant to Technical Specifications (TS) Reporting Requirement 5.6.8. This report discusses steam generator tube plugging in Unit 2. Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 8, 2003. Copies of the Special Report are being forwarded to the Regional Administrator, NRC Region IV and the PVNGS Resident Inspector.

No commitments are being made to the NRC by this letter.

If you have any questions, please contact Daniel G. Marks, Section Leader, Regulatory Affairs, Compliance, at (623) 393-6492.

Sincerely, g

WEI/DG M/DFH/kg Attachment cc: E. W. Merschoff (all with attachment)

J. N. Donohew '/ 1/7 J. H. Moorman

.4 \

'-x A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • South Texas Project v Wolf Creek

Attachment Special Report No. 2-SR-2002-001

Palo Verde Nuclear Generating Station Unit 2 Steam Generator Tube Plugging Docket No. STN 50-529 Special Report No. 2-SR-2002-001 This Special Report is being provided pursuant to Palo Verde Unit 2 Technical Specifications (TS) Reporting Requirement 5.6.8 to report the number of steam generator tubes plugged and/or repaired as a result of inservice inspection activities.

On April 8, 2002, Unit 2 was defueled during a refueling outage when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of 127 tubes in Steam Generator No. 1 and 207 tubes in Steam Generator No.

2.

Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 8, 2003.