ML022610703

From kanterella
Jump to navigation Jump to search
Special Report 2-SR-2002-001-01
ML022610703
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/11/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
192-01109-WEI/DGM/DFH, TS 5.6.8 2-SR-2002-001-01
Download: ML022610703 (1)


Text

LAM Technical Specification 5.6.8 William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P 0 Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 192-01109-WEI/DGM/DFH September 11, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Reference:

Unit 2 Special Report 2-SR-2002-001-00, dated April 12, 2002 APS Letter Number 192-01104-WEI/DGM/DFH Accession Number ML021350227

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 2 Docket No. STN 50-529, License No. NPF-51, Special Report 2-SR-2002-001 -01 Pursuant to PVNGS Technical Specification 5.6.8, enclosed is Supplement 1 to Special Report 2-SR-2002-001. This supplement provides the complete results of the steam generator tube inservice inspection that was performed during the Unit 2 tenth refueling outage.

By copy of this letter and the enclosure, this Special Report is being provided to the NRC Region IV Administrator and the PVNGS Resident Inspector.

No commitments are being made to the NRC by this letter. Please contact Daniel G.

Marks at (623) 393-6492 if you have any questions or require additional information.

Sincerely, WEIIDGMIDFH/kg Enclosure cc: E. W. Merschoff (all with enclosure)

J. N. Donohew N. L. Salgado