ML042960360

From kanterella
Jump to navigation Jump to search
Report Regarding Voltage Regulator Cabinet
ML042960360
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/01/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0307
Download: ML042960360 (2)


Text

J e.( No. fdff 3 3 -MB-- SYS CM- LCM PRIORITY: 6 WO #: 2719090 SEQUENCE: 3 LEAD WORK CENTER: EMS LEAD DISCP: PR&C DUE:

COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION: ZJ3A PROBLEM DESC:

Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this problem, WORK DESC:

.. END WORK DESC TECH SPEC: N WX QR: N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT: SCFD REQD: N INSL REQD:N EQ MODE:

COATING: CRDL #:

PERMIT #:

POSTED PERMITS REP REQD: N REP #:

OTHER LEADS (DISCP):

OTHER SUPPORT (DISCP):

PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED []

U Page I of 2 Report Date: 01-JUL-2004

(WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 WO #: 2719090 SEQUENCE: 3 LEAD WORK CENTER EMS LEAD DISCP: PR&C DUE:

COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION: ZJ3A

. END WORK DESC WORK STARTDATE/TIME: WORK COMPLETE DATE/TIME:

JOB SUMATION:

BADGE # EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER / DATE:

RETEST REFERENCE DOCUMENT:

Page 2 of 2 Report Date: 01-JUL-2004