Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-84-478, Forwards Press Release 84-69 Re NRC Reduction of Fine for 1983 Violation.Pressure Sensing Device Capped.Fine Reduced Due to Short Duration of Violation,Small Size of Reactor & Comparable Enforcement Actions1 June 1984Forwards Press Release 84-69 Re NRC Reduction of Fine for 1983 Violation.Pressure Sensing Device Capped.Fine Reduced Due to Short Duration of Violation,Small Size of Reactor & Comparable Enforcement Actions
IA-86-666, Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions17 August 1982Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions
IR 05000409/200503116 July 1985Forwards Notice of Violation Issued to Util Based on 850409-0531 InspFire Watch
ML20055A8908 July 1982Responds to 820621 Request for Info Re Shipments of Radwaste from Facility Through State of Wi.Shipments Resulting from Cleanup Efforts Estimated to Range from 350-1,000 Ci
ML20062G3534 August 1982Responds to Reiterating Concerns of Kent County, MD Residents Re Possible Disposal of Waste Water from TMI Into Susquehanna River & Chesapeake Bay.Two Studies Underway to Evaluate Impacts of 27 Disposition Alternatives
ML20062H97721 August 1980Responds to Re Encl G Trust Concerns About Health Effects of 790328 Accident & Purging Reactor Bldg Atmosphere.Several of Trust Concerns Result from Misunderstanding & Misapplication of Info
ML20062J4623 October 1980Responds to 800818 Inquiry Re Frix Concerns Over Purging of Radioactive Kr-85 Gas.Forwards 800612 Temporary License Mod, 800612 Memorandum & Order Discussing Rationale for Decision & Vols 1 & 2 of NUREG-0662 Re Decontamination.W/O Encl
ML20125B0382 October 1979Responds to Re SL Frei Observation That Radiation Detector Signal Could Have Prevented Transfer of Contaminated Water at Tmi.Source of Radioactivity in Auxiliary Bldg Was Leakage from Reactor Coolant Letdown Sys
ML20125B11819 September 1979Responds to Re Discovery of Radioactively Contaminated Clothing in Unauthorized Area.Util Has Instituted Addl Precautions.Continuous Releases of Radioactivity from Plant Below Established Limits
ML20125D0658 November 1979Responds to Re R Davis Concern About Water Level in Containment Bldg.No Emergency Situation Foreseeable Due to Vol of Bldg & Sources of Leakage.Decay Heat Removal Sys Is Available.R Davis Encl
ML20126D32229 May 1984Urges Congress to Maintain Close Oversight of NRC Activities to Keep Sys of Safety Regulations from Unraveling.Situation at Plant Aggravated by NRC Decision to Authorize Plant to Operate for Wks While Diesel Generators Dismantled
ML20126D36329 June 1984Responds to Indicating Plan to Release NRC Draft Answers to Questions Re Plant.Releasing Draft Response to Public Would Be Confusing Since Commission Developing Complete Response Which Will Be Provided by mid-Jul
ML20126K60025 March 1981Forwards 810323 Order Permitting Met Ed,Subj to NRC Review, to Begin Hot Functional Testing of Facility Using non- Nuclear Heat & to Remove from Litigation Licensee Financial Qualifications Issue.W/O Encl
ML20126M3778 June 1981Forwards M Rogovin Special Inquiry Group Final Rept Re TMI Accident in Response to on Behalf of J Jolly.W/O Encl
ML20126M5964 June 1981Ack Receipt of Re Fg Lunden Comments Supporting Proposed Rule 10CFR2 Concerning Regulations Designed to Reduce Licensing Process for Nuclear Power Plants. Alternatives to Amends Are Being Considered
ML20129G1888 July 1985Responds to Forwarding Constituent L Evers 850607 Complaint Re Gpu Disposal of TMI-2 Waste.Nrc Only Assures That Cleanup Proceeds Safely & Expeditiously.Gpu Chooses & Evaluates Contractors
ML20132B83418 July 1985Forwards Quarterly Status Rept for Second Quarter CY85. Licensing Delay for Limerick 1 Projected to Be 5 Months. Delay Cannot Be Quantified for Shoreham Due to Litigation. Full Power OL Issued for Palo Verde 1 on 850601
ML20132C20312 June 1984Responds to to Chairman Palladino Re Constituent Lw Bussert Concerns on Licensing Delays & Impact on Utils. Minimized Delays Key in NRC Decisionmaking Process
ML20132C65225 June 1981Responds to Encl Re Constituent Mh Schwartz on Resumption of Concrete Work at Site
ML20132E7434 June 1984Ack Receipt of Ltr on Behalf of Constituent,Jc Morris, Inquiry as to Status of Commission Decision on Restart of TMI-1.On 840601,Commission Issued Encl Order Requesting Parties Comments on Subj Question by 840615.W/o Encl
ML20132E87220 July 1984Ack Receipt of Ltr Requesting Info Re Status of Licensing for Facility.Forwards Chairman Palladino & H Denton Statements.Results of ACRS Review Also Encl.W/O Encl
ML20132E97718 October 1984Ack Receipt of Inquiry on Behalf of J Merryman Re Status of Restart Proceeding.Commission Will Undertake & Complete Review of ALAB-772.Forwards Commission 840911 Orders & Commissioner Asselstine Dissenting Views.W/O Encl
ML20132F59817 April 1985Ack Receipt of Ltr Re Status of NRC Deliberations on Whether to Lift Immediate Effectiveness of Orders Directing That TMI-1 Remain Shut Down Pending Further Order of Commission. No Date Set for Public Meeting
ML20132G24616 September 1985Forwards Insert of Page 39,Line 827 of 850417 Hearing Record on NRC Budget.Insert Provides Addl Views on Estimate of Crude Cumulative Probability of Core Melt AccidentProbabilistic Risk Assessment
ML20132G62519 September 1985Forwards Responses to Gao Rept, NRC Should Rept on Progress in Implementing Lessons Learned from TMI Accident
ML20132H19418 July 1985Responds to Representative Jr Miller Requesting Explanation of Procedures NRC Used to Authorize Restart of TMI-1 & Description of Safety Risks That Communities Surrounding Plant Now Subj To.Served on 850719
ML20136C4546 July 1979Forwards Info Requested at 790622 Meeting.Environ Appraisal on Use of Epicor Will Be Forwarded When Available.W/O Encl
ML20137A89717 December 1985Forwards Fr Notice of NRC Authorization to Issue & Make Immediately Effective,Any Amend to OL Upon Determination That Amend Involves Nshc,Per Public Law 97-415.W/o Encl
ML20137L00229 August 1985Forwards Revised Charter for Advisory Panel for Decontamination of TMI-2,broadening Scope of Committee Activities to Include Consulting W/Commission on Public Reactions to Plans & Results of Studies Re TMI-2 Accident
ML20137L02129 August 1985Forwards Revised Charter for Advisory Panel for Decontamination of TMI-2,broadening Scope of Committee Activities to Include Consulting W/Commission on Public Reactions to Plans & Results of Studies Re TMI-2 Accident
ML20137L04529 August 1985Forwards Revised Charter for Advisory Panel for Decontamination of TMI-2,broadening Scope of Committee Activities to Include Consulting W/Commission on Public Reactions to Plans
ML20137P51224 January 1986Provides Info Concerning Financial Qualifications of Utils Re Safety of Plants.Nrc Regulation of Commercial Nuclear Power Based on Responsibility of Licensees for Safe Operation.Addl Views of Asselstine Encl
ML20137T7366 February 1986Submits Addl Info Re Concerns Raised by M Osborn,Per 860108 Request.Continued Operations Oversight Will Include Close Observation of day-to-day Activities & Scope Reviews of Plant & Licensee Performance
ML20140C95417 July 1984Responds to Re Investigation Involving Matl False Statement.Nrc Policy of Levying Civil Penalties on Licensee Instead of Individual Elucidated.Violations Addressed in D Alabach Under Consideration for Enforcement
ML20140H55010 January 1984Forwards Press Release 84-4 Re NRC Proposed Civil Penalty in Amount of $40,000 Against Util for Failure to Post Continuous Firewatch While Both Trains of Standby Gas Treatment Sys Fire Suppression Sys InoperableContinuous fire watch
Fire Watch
ML20140H55513 August 1985Forwards Press Release 85-108 Re Proposed Fine Concerning Util Alleged Violation of NRC Requirements Which Prohibit Discrimination Against Employee for Identifying Safety Concerns to Mgt
ML20140H5622 January 1984Forwards Press Release 84-16 Re Proposed Civil Penalty in Amount of $40,000 Against Util for Alleged Violation of Radiation Protection Requirements During 831014 Incident
ML20140H57412 August 1985Forwards Press Release 85-106 Re Proposed Fine for Util Alleged Violation of NRC Requirements Concerning Employee Discrimination in Cleanup Program
ML20140H59123 July 1985Forwards Press Release 85-99 Re NRC Proposed Civil Penalty in Amount of $150,000 Against Util for Violation of Requirements Concerning Reactor Vessel Water Level InstrumentsReactor Vessel Water Level
ML20140H59628 February 1984Forwards Response to Jr Bass 840102 Request for Info Re 831227 Imposition of Civil Penalty in Amount of $100,000
ML20140H61628 February 1984Forwards Response to Jr Bass 840102 Request for Info Re 831227 Proposed Civil Penalty in Amount of $100,000.Listed Documentation,Including NRC 831227 Proposed Civil Penalty & Computer Printout Describing Violations,Encl
ML20140H62315 July 1985Forwards Press Release 85-95 Re NRC Proposed Fine Against Util for Alleged Violations of Safety Requirements During Apr 1985
ML20140H6464 June 1985Forwards Press Release 85-80 Re NRC Proposed Civil Penalty in Amount of $500,000 Aginst Util for Alleged Matl False Statements Made to NRC Concerning Operator Qualifications & Training
ML20140H65829 February 1984Forwards Press Release 84-26 Re NRC Proposed Fine Against Util for 12 Alleged Violations of Tech Specs While Performing Work at FacilityHigh Radiation Area
ML20140H6703 June 1985Forwards Press Release 85-78 Re NRC Proposed Fine Against Util for Alleged Violations of Requirements Concerning Unplanned Occupational Radiation Exposures & Failure to Control Contractor Work ForcesHigh Radiation Area
ML20140H7057 March 1984Forwards Press Release 84-28 Re NRC Proposed Civil Penalty in Amount of $40,000 Against Util for Alleged Violation of Security Requirements During 831110 Practice Radiological Evacuation Drill
ML20140H72124 May 1985Forwards Press Release 85-75 Re NRC Proposed Fine Against Util for Alleged Violations of Requirements Concerning Failure to Take Corrective Action When Warranted Concerning QA Program
ML20140H74517 May 1985Forwards Press Release 85-70 Re NRC Proposed Civil Penalty in Amount of $50,000 Against TVA for Alleged Violation of Security Requirements
ML20140H75116 March 1984Forwards Press Release 84-34 Re NRC Proposed Imposition of Civil Penalty in Amount of $20,000 Against Util for Alleged Violation of Security Requirements
ML20140H7799 May 1985Forwards Press Release 85-68 Re NRC Proposed Fine Against Util for Alleged Noncompliance Concerning Improperly Conducted Preoperational Testing Program