Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02071063828 February 2002Duke Energy Corporation Submittal of Fitness-For-Duty Program Performance Data ReportsFitness for Duty
ML02093052531 March 2002SMSAB-02-01: Analysis Report: Comparison Between TRAC-M Version 3782 and RELAP5 MOD 3.2.2 Gamma Calculations of Selected Pressurized Thermal Shock Scenarios of the Oconee Unit 1 PlantLoop seal
ML02199001511 July 2002Steam Generator In-service Inspection Summary Report Oconee Unit 1, 2002 Outage EOC 20, Attachments 1 and 2Non-Destructive Examination
Stress corrosion cracking
Eddy Current Testing
Flow Induced Vibration
ML02199006111 July 2002Steam Generator In-service Inspection Summary Report Oconee Unit 1, 2002 Outage EOC 20, Attachments 2 - 3, List of Imperfections - Bobbin, Dated 05/02/02
ML02199009411 July 2002Steam Generator In-service Inspection Summary Report Oconee Unit 1, 2002 Outage EOC 20, Attachments 4 - 10, List of Imperfections - Mrrc/Plus Point
ML03063068125 February 2003Fitness-for-Duty Program, Performance Data ReportsFitness for Duty
ML03092067620 March 2003Defense in Depth & Diversity Assessment Associated with Digital Upgrade of Reactor Protective System & Engineered Safeguards Protective SystemPost Accident Monitoring
Fuel cladding
Pressure Boundary Leakage
GOTHIC
Unidentified leakage
Manual Operator Action
ML03121004924 April 2003Duke Energy Topical Report Response to Request for Additional Information Letter Dated April 4, 2003Coatings
Nondestructive Examination
Scaffolding
Backfit
ML0318400641 July 2003Results of Oconee Nuclear Station SDP Phase 2 Notebook Benchmarking VisitSignificance Determination Process
ML03247152822 August 2003Fitness-for-Duty Program Performance Data ReportsFitness for Duty
ML03329044518 November 2003Core Operating Limits Report, Cycle 22, Revision 20Shutdown Margin
ML0413503525 May 2004Auxiliary Service Water System OutageScaffolding
ML04245053720 August 2004Letter Transmitting Fitness-For-Duty Program Performance Data Reports for Duke Energy Corp Oconee, McGuire and Catawba Nuclear Stations and the General OfficeFitness for Duty
ML05053016817 February 2005Background Discussion Material for February 24-25, 2005 NRC Meeting Relating to Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg Loca.Nondestructive Examination
Fuel cladding
Operability Assessment
ML05061003018 February 2005Duke Energy Corporation, Fitness-For-Duty Program Performance Data Reports for Period Covering 07/01/2004 Through 12/31/2004Fitness for Duty
ML05179020921 June 2005Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model, Covering the Time Period from January 1, 2004 to December 31, 2004
ML0520901582 August 20052004 External Stakeholder Response; 2004 Reactor Oversight Process External Survey - AttachmentFitness for Duty
Enforcement Discretion
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Systematic Assessment of Licensee Performance
Earthquake
Maintenance Rule Program
Pressure Boundary Leakage
Backfit
Power change
Siren
ML05244029324 August 2005Fitness-For-Duty Program Performance Data ReportsFitness for Duty
ML06033063131 January 2006Project Plans for Tornado and High Energy Line Break Events Outside ContainmentSafe Shutdown
Tornado Missile
Tornado Generated Missile
Tornado Missile Protection
Flow Accelerated Corrosion
TORMIS
ML06060044923 February 2006EOC22 Refueling Outage, October-November 2005 Steam Generator Inservice Inspection 3 Month ReportEddy Current Testing
ML06066016821 February 2006Fitness-For-Duty Program Performance Data ReportsFitness for Duty
ML06124044512 April 2006Future Oconee Tornado Mitigation StrategyTornado Missile
Enforcement Discretion
Tornado Missile Protection
TORMIS
ML0612404679 March 2006Tornado and High Energy Line Break Events Outside Containment - Supplemental InformationTORMIS
ML06249042728 August 2006Fitness-For Duty Program Performance Data Reports for Period Covering January 1, 2006 Through June 30, 2006Fitness for Duty
ML07029032830 November 2006Tornado/Helb Mitigation Strategies and Regulatory CommitmentsSafe Shutdown
Shutdown Margin
Mission time
Tornado Missile
Probabilistic Risk Assessment
Operating Basis Earthquake
Tornado-Generated Missile
Tornado Missile Protection
TORMIS
Earthquake
Liquid penetrant
GOTHIC
Thermal fatigue
ML07053007021 February 2007Emcb Review of the High Energy Line Break Mitigation Strategies for the Oconee Units as Proposed by Duke in a Letter Dated November 30, 2006Safe Shutdown
Mission time
Tornado Missile
TORMIS
ML07065042227 February 2007Fitness-For-Duty Program Performance Data Reports for Period July 1, 2006 Through December 31, 2006Fitness for Duty
ML0711501942 June 2006June 2006 Monthly Report for DPO-2006-002,-003
ML07129025126 October 2006DPO Panel Report-Memo to J. Dyer, NRR, from J. Grobe, Ades/Nrr, Subject: DPO Panel Response to DPO-2006-003Internal Flooding
ML07129028313 November 2006DPO Panel Report-Memo to J. Dyer, NRR, from J. Grobe, Ades/Nrr, Subject: DPO Panel Response to DPO-2006-002Internal Flooding
ML07353222613 December 2007Completion of Confirmatory Action Letter Requirements and Summary Ultrasonic Examination Results of Completed Alloy 82/182 Weld Overlays Relief Requests 07-ON-001 and 07-ON-004Weld Overlay
Dissimilar Metal Weld
ML08071015929 February 2008GL-04-002 Supplemental Response on Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water ReactorsBoric Acid
Ultimate heat sink
Mission time
Coatings
Finite Element Analysis
Design basis earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
Scaffolding
Manual Operator Action
ML08135023212 May 2008Summary Ultrasonic Examination Results of Completed Alloy 82/182 Weld Overlays Relief Request 07-ON-004Weld Overlay
ML0834702469 December 2008Submittal of Auxiliary Service Water System Outage Report
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML10134068418 May 2010Audit Plan - Technical Adequacy of the Oconee Nuclear Plant'S License Amendment Request for the Transition to 10 CFR 50.48 (C)Probabilistic Risk Assessment
Fire Protection Program
ML1018201847 July 2010Evaluation of 2009 (Cycle 24) Steam Generator Tube Inspections
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML1019305458 February 2010Preliminary Report Oconee Nuclear Station
ML10201053820 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Cover Letter Through Appendix CGrab sample
Tritium
ML10201054020 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Appendix D Through Appendix E
ML10201054120 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Appendix E - Continued
ML10201054220 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Appendix E - Continued Through End
ML10230016816 August 2010Units 1 & 2 - Supplement 2 to License Amendment Request for Duke Energy Cyber Security PlanCyber Security
Fuel cladding
Cyber attack
ML10291048020 October 2010NRC Assessment of Oconee External Flooding Issue (October 18, 2010)Safe Shutdown
Significance Determination Process
ML11004040923 December 2010Draft, Regarding Review of Root Cause Analysis and Actions Addressing the Underground Pipe Damage to the Condensate Storage Tank Return LineCoatings
Operability Determination
ML11082086531 March 2011Evaluation of 2010 (Cycle 24) Steam Generator (SG) Tube Inspections
ML11180A01123 June 2011Closure of 60-Day Interim Report Notification: Dubose National Energy Services, Inc
ML12187A21531 March 2012Attachment 1, ANP-2951, Rev. 002, Inspection Plan for the Oconee Nuclear Station, Units 1, 2, and 3, Reactor Vessel Internals, Amp/Application to Implementation MRP-227-ASafe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Nondestructive Examination
Functionality Assessment
Finite Element Analysis
Aging Management
Stress corrosion cracking
License Renewal
EVT-1
Liquid penetrant
Power Uprate
Measurement Uncertainty Recapture
ML12251A03110 September 2012Review of the Spring 2011 Steam Generator Tube Inservice Inspections During End of Cycle 26 Refueling Outage