Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed13 April 1984Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria ConfirmedSafe Shutdown
IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl31 July 1986Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee EnclEarthquake
Backfit
IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl18 November 1986Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info EnclBackfit
IR 05000259/198901029 June 1989Summary of 890606 Meeting W/Util in Rockville,Md Re Handling of Clay Pipe Issue & Condition Adverse to Quality Program, Per Findings in Insp Repts 50-259/89-10,50-260/89-10 & 50-296/89-10.List of Attendees & Presentation Slides EnclCondition Adverse to Quality
Operability Determination
IR 05000259/19970046 February 1998Summary of 980126 Meeting W/Tennessee Valley Authority Re Resolution of Unresolved Issue 50-290/97-04-01 Identified in Insp Rept 50-259/97-04.List of Attendees Encl
ML17276A1762 November 1981Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl
ML18038B3516 June 1995Trip Rept of 950514-16 Visit to Browns Ferry Nuclear Power Stations Re Blast Evaluation & Subsequent Vehicle Barrier Location
ML18139B96713 July 1982Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech SpecsOffsite Dose Calculation Manual
Process Control Program
Backfit
ML20054F28627 May 1982Summary of 820506 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Program for Seismic Qualification of Equipment
ML20054J03017 June 1982Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection
ML20055F09410 July 1990Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09
ML20055G86118 July 1990Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl
ML20056C52518 June 1993Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl
ML20056D83426 May 1993Summary of Operator Reactors Event Meeting 93-18 on 930519Loop seal
ML20056D98030 July 1993Summary of 930720 Meeting W/Util in Rockville,Md to Discuss Plans & Schedule to Implement Improved STS at Plant.Meeting Attendees Listed in Encl 1Backfit
ML20056E9739 August 1993Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees EnclReactor Vessel Water Level
Probabilistic Risk Assessment
ML20056F92226 August 1993Summary of 930803 Meeting W/Util in Rockville,Md Re Proposed Cost Beneficial Security Program Revs at Browns Ferry Nuclear Plant.List of Attendees & Meeting Handouts EnclFitness for Duty
ML20057D07627 September 1993Summary of 930903 Meeting W/Util in Rockville,Md Re Ways Util Might Improve Quality & Completeness of Plant Licensing Submittals.List of Meeting Attendees & List of Specific Licensing Submittals Discussed During Meeting Encl
ML20058G9447 December 1993Summary of 931110 Meeting W/Tva in Rockville,Md Re TVA Plans to Improve Quality of Licensing Submittals for Bfn.List of Attendees & Handouts Encl
ML20058M4498 August 1990Summary of 900727 Meeting W/Util on Site Re Plant Tour. Restart Status & Condition of Unit 2 Primary Focus of Site Tour.List of Attendees Encl
ML20059C7422 March 1993Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection SysHigh Radiation Area
Probabilistic Risk Assessment
Flow Induced Vibration
ML20079R09218 June 1979Agenda for 790618 Meeting W/Nrc to Discuss Facility Const & Licensing.Related Info Encl
ML20079R10514 September 1979Agenda for 790918-20 Caseload Forecast Panel Site Visit. Related Info Encl
ML20079R11025 July 1980Agenda for 800729 Caseload Forecast Panel Site Visit. Related Info EnclCoatings
ML20079R12924 August 1981Agenda for 810825 Meeting W/Nrc Caseload Forecast Panel to Conduct Plant Tour.Related Info Encl
ML20084K27527 January 1971Trip Rept of 710120 Visit to Plant Re Plans for Replacement of Dome Concrete & Review of Specs for Work.Concrete Removal Operation Satisfactory
ML20098D1125 April 1982Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination ProgramHydrostatic
ML20098D13723 April 1982Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl
ML20098D19923 April 1982Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl
ML20117M36211 January 1984Agenda for Util 840111 Performance OverviewReactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Hydrostatic
Nondestructive Examination
Scram Discharge Volume
Process Control Program
Systematic Assessment of Licensee Performance
Control of Heavy Loads
Fire Protection Program
Fire Watch
Overexposure
ML20125A42011 September 1978Summary of 780824 NRC Meeting Held W/Ge,Tva,Nsp, & B & P Representatives to Discuss Swelling in Four GE High Density Spent Fuel Storage Racks in Monticello Spent Fuel Pool. (Encl to 7809210158)Hydrostatic
ML20125C5621 May 1978Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan
ML20125C5719 September 1976Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks
ML20125C5729 September 1976Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl
ML20125D0342 December 1992Summary of 921015 Meeting W/Util in Rockville,Md Re Util Plans for Conducting Expanded IPE for Plant.List of Attendees & Meeting Handouts Encl
ML20125D65818 August 1976Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept
ML20126D8131 May 1973Trip Rept of 730424-25 Site Visit to Obtain First Hand Knowledge of Site & Environs & to Discuss Possible Problem Areas.Attendance List Encl
ML20126G05812 March 1981Summary of Caseload Forecast Panel 810303-05 Meeting & Site Visit W/Utils & S&W in St Francisville,La Re Scheduling of Const & Observing Const Activities in Progress.Attendance List,Meeting Agenda,Handouts & Visual Aids Encl
ML20126K42930 December 1992Summary of 921201 Meeting W/Util in Rockville,Md Re Discussions on Proposed Upgrade of Refueling Floor & RB Radiation Monitoring Equipment,Including Proposed Revs to Plants TS Submitted in Ltr
ML20126K44330 December 1992Summary of 921216 Meeting W/Util in Rockville,Md Re Discussions on Design & Operation of Plant Hardened Wetwell Vent.List of Attendees & Meeting Agenda EnclContainment Hardened Vent
ML20126L2331 May 1981Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation
ML20127A4681 March 1978Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl
ML20127A7005 June 1985Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl
ML20127B51013 April 1984Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria ConfirmedSafe Shutdown
ML20127D15713 June 1985Summary of 850530 Operating Reactor Events Meeting to Brief Ofc Director,Div Directors & Representatives on Events Since 850515 Meeting.List of Attendees,Viewgraphs & Status of Assignments EnclShutdown Margin
ML20127J02813 June 1985Summary of 850514-15 Meetings & Site Visit W/Util in North Carolina Re Audit of Spds.List of Attendees & Viewgraphs EnclPost Accident Monitoring
ML20127N90224 June 1985Summary of Operating Reactors Events Meeting 85-10 on 850612.Only 3 of 17 Items Scheduled for Completion by 850531 Remain Incomplete.List of Attendees,Summary of Events Discussed & Status of Previous Assignments EnclScram Discharge Volume
ML20127P48810 May 1985Summary of 850411 Meeting W/Util & S&W in Bethesda,Md to Review Issues Associated W/Containment as Result of Tech Spec Review
ML20128A90613 May 1985Summary of 850507 Operating Reactors Events Meeting.List of Attendees,Events Discussed & Assignments Encl
ML20128C2515 November 1973Summary of 731101 Meeting W/Util,Bechtel,Ssi,Southern Svcs, USGS & Dept of Army,Chief of Engineers in Bethesda,Md Re Geology & Subsurface Exploration of Plant Site.List of Attendees & Review Status as of 730531 Encl