Summary of 850411 Meeting W/Util & S&W in Bethesda,Md to Review Issues Associated W/Containment as Result of Tech Spec Review
ML20127P488
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/10/1985
From: Stern S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8505240008
Download: ML20127P488 (4)


Text

b p .*-

~

MAY 101985

^

Docket No.'50-458. Distribution:

A, Docket FHet LB#2 Reading "NRC'PDR ~ " Dewey,0 ELD APPLICANT: : Gulf States' Utilities Company (GSU) Local PDR ASchwencer PRC System SStern FACILITY:. RiverBendStation(RBS) NSIC

- EHy(ltonffudrick

SUBJECT:

MEETING St# MARY - CONTAINMENT-ISSUES NRR,' Gulf States Utilities-(GSU) and Stone & Webster-Engineering Corporation (SWEC) met at 1:00 p.m. April 11, 1985 in the offices of General Electric Corporation in Bethesda, Maryland to review issues associated with RBS containment arising out of Technical Specification review.

During the meeting NRC requested the following information to review the RBS

Tech Spec and SER issues:

1.- Containment Leakage in PVLCS for the first 25 min. NRC position is to consider dose contribution (i.e., slug flow analysis not acceptable). Con-tainmentisolationva}veswillbetestedinaccordancewithAPPJ-(w/o-inclusion with 0.6 La iscriterion). Testing must consider venting behind valve. All valves must be in tech specs.

2. Containment Purge Isolation Rad monitor setpoint. NRC position is to limit high setpoint to 100 mR/hr or a setpoint.consistant with other downstream monitors setpoints (limitations: APP I or Part 20) GSU will provide setpoint calculations by 4/16/85 for:

A) Purge line w/ filter efficiency B) Purge line w/o filter L' C) 5 GTS line w/ filter efficiency

3. Bypass Leakage procedure. GSU Action is to confirm the. details of operator action (via procedure) 95 psid (within 5 minutes), by April 16, 1985.

4.- Containment Purge GSU'must justify / minimize number of purge hours.

ort *8m1 stened tre Stephen Stern, Project Manager Licensing Branch No. 2 Division of Licensing closur -

{L ed ,

cc: e next page 7

LBf1 /PM /DSTS SSte rn:lb LB#2/DL/BC#)

WButler Eltaw a' 05/cg/85- .05/ /85 5 ./85 I La is overall integrated containment leakage g 52 M $ b PDR se A

a ' f aCs g ,

[& ^ 'kg UNITED STATES NUCLEAR REGULATORY COMMISSION 5 't j WASHINGTON, D. C, 20555

~

l MAY 10 1985 Docket flo. 50-458 APPLICAllT: Gulf States Utilities Coraany (GSU)

FACILITY: River'BendStation(RBS)

SUBJECT:

MEETING SUletARY - CONTAIf;MEtiT ISSUES NRR, Gulf States Utilities (GSU) and Stone & Webster Engineering Corporation (SWEC) met at 1:00 p.m. April 11, 1985 in the offices of General Electric

. Corporation in Bethesda, Maryland to review issues associated with RBS containment arising out of Technical Specification review.

During the meeting flRC requested the following information to review the RBS Tech Spec and SER issues:

1. Containment Leakage in PVLCS for the first 25 min. NRC position is to consicer dose contribution (i.e., slug flow analysis not acceptable). Con-tainmentisolationva{veswillbetestedinaccordancewithAPPJ(w/o inclusion with 0.6 La is criterion). Testing must consider venting behind valve. All valves must be in tech specs.
2. Containment Purge Isolation Rad monitor setpoint. fiRC position is to limit high setpoint to 100 mR/hr or a setpoint consistant with other downstream monitors setpoints (limitations: APP I or Part 20) GSU will provide setpoint calculations by 4/16/85 for:

A) Purge line w/ filter efficiency B) Purge line w/o filter C) 5 GTS line w/ filter efficiency

3. Bypass Leakage procedure. GSU action is to confirm the details of operator action (via procedure) 05 psid (within 5 minutes), by. April 16, 1985.

4 Containment Purge /.)

GSU must justify / minimize number of purge hours.

o/. / ,, ,.s

/S p 5$ ect Manager Licensing Branch No. 2 Division of Licensing

Enclosure:

fleeting Attendance List cc: See next page I La is overall integrated containment leakage

River Bend Station i

Mr.-William J. Cahill, Jr.

' Senior.Vice President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas '77704 ATTN: Mr. J. E. Booker cc: . Troy _ B. Conner, Jr. , Esq. Ms. Linda B. Watkins/Mr. Steven Irving Conner and Wetterhahn Attorney at Law

. 1747 Pennsylvania Avenue, N. W. 355 Napoleon Street Washington, D.C. 20006 Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr.

Director - Nuclear Licensing Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 Mr. David Zaloudek Nuclear Energy Division H. Anne Plettinger Louisiana Department of -

3456. Villa Rose Dr. Environmental Quality Baton Rouge, Louisiana 70806 Post Office Box 14690 Baton Rouge, Louisiana 70898-Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge

. State of Louisiana Department of Justice 234 Loyola Avenue New Orleans, Louisiana, 70112 Mr. J. David McNeill, III Dwight D. Chamberlain William G. Davis, Esq.

Resident Inspector Department of Justice Post Office Box 1051 Attorney General's.0ffice St. Francisville, Louisiana 70775 7434 Perkins Road Baton Rouge, Louisiana 70808 Gretchen R. Rothschild Louisianians for Safe Energy, Inc.

1659 Glenmore Avenue Baton Rouge, Louisiana 70775 James W. Pierce, Jr., Esq.

P. O. Box 23571 Baton Rouge, Louisiana 70893 e

fleeting 4/11/85 1:00 p.m.

Landow Bldg; GE Offices River Bend Station Name Organi::ation Affiliation Tele Stephen M. Stern- - NRC/NRR/DL/LB-2 301-492-8349 Dennis Vandeputte SWEC Licensing 609-482-3458 Howard Conrad SWEC Radiation Protection 609-482-4325 Farouk Eltawila NRC/NRR/CSB 492-9488 Jack Kudrick. NRC/NRR/CSB 492-9496 John Price GSU-Licensing 409-836-6631

. Eddie R. Grant GSU-Licensing 409-839-3012-Jerry Hulman NRC/DSI/AEB 301-492-7880 Dan Milliamson GSU-Site 504-635-6094 X2306 Jacques Read NRC/DSI/AEB 301-492-8301 Ted Quay NRC/DSI/AEB 301-492-8301 Tom Szabo SWEC Dean Houston NRC/NRR/DL Walt Butler NRC/DSI/CSB W. G. Kennedy NRC/NRR/DHFS/PSRB 301-492-4578 i