MNS-14-001, Submittal of Summary Report of Evaluations Performed at for Changes Occurring During the Period from January 1, 2013, to December 31, 2013 | 6 February 2014 | Submittal of Summary Report of Evaluations Performed at for Changes Occurring During the Period from January 1, 2013, to December 31, 2013 | Shutdown Margin |
MNS-14-003, License Amendment Request for Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System | 28 January 2014 | License Amendment Request for Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System | Stroke time Anticipated operational occurrence Hydrostatic Surveillance Frequency Control Program Fuel cladding Grace period |
MNS-14-009, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding Update - Review of Available Physical Margin (APM) Assessments | 30 January 2014 | Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding Update - Review of Available Physical Margin (APM) Assessments | Fukushima Dai-Ichi |
MNS-14-016, Emergency Plan, Revision 14-1 | 30 January 2014 | Emergency Plan, Revision 14-1 | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual B.5.b Tornado Generated Missile Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage Operational leakage |
MNS-14-017, Response to Request for Additional Information Regarding Response to NRC Bulletin 2012-01 | 30 January 2014 | Response to Request for Additional Information Regarding Response to NRC Bulletin 2012-01 | Open Phase Condition |
MNS-14-019, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | 27 February 2014 | Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | Boric Acid High winds Tornado Missile Internal Flooding FLEX B.5.b Battery sizing |
MNS-14-023, Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | 27 February 2014 | Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | Boric Acid High Radiation Area Mission time Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Locked High Radiation Area FLEX Seismically rugged Spent Fuel Pool Instrumentation Fire Protection Program Grace period |
MNS-14-025, Submittal of Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 12 March 2014 | Submittal of Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
MNS-14-026, Risk-Informed Inservice Inspection Program Response to Request for Additional Information | 3 March 2014 | Risk-Informed Inservice Inspection Program Response to Request for Additional Information | |
MNS-14-029, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of The. | 20 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of The. | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake Seismic Walkdown Report |
MNS-14-030, Annual Commitment Change Report | 19 March 2014 | Annual Commitment Change Report | |
MNS-14-036, Annual Radioactive Effluent Release Report | 29 April 2014 | Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
MNS-14-043, (Mns), Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049. | 20 May 2014 | (Mns), Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049. | |
MNS-14-045, Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013 | 3 June 2014 | Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013 | Battery sizing Commercial Grade |
MNS-14-046, Station Initial Exam 2014-301 General Correspondence | 28 May 2014 | Station Initial Exam 2014-301 General Correspondence | Job Performance Measure |
MNS-14-047, Emergency Plan, Revision 14-2 | 23 June 2014 | Emergency Plan, Revision 14-2 | Grab sample B.5.b Earthquake Minimum staff Siren |
MNS-14-056, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049 (TAC Nos. MF2741, 2742) | 22 July 2014 | Response to Request for Additional Information Regarding License Amendment Request (LAR) for Proposed Changes to Technical Specification (TS) 3.3.2, in Support of Compliance with NRC Order EA-12-049 (TAC Nos. MF2741, 2742) | |
MNS-14-066, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 27 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Tornado Missile FLEX Battery sizing |
MNS-14-067, Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 27 August 2014 | Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
MNS-14-070, Duke Energy Request for NRC Grant Discretion from Enforcing the Shutdown Requirement of Technical Specifications (TS) 3.8.1 (AC Sources - Operating) | 25 August 2014 | Duke Energy Request for NRC Grant Discretion from Enforcing the Shutdown Requirement of Technical Specifications (TS) 3.8.1 (AC Sources - Operating) | Safe Shutdown High winds Enforcement Discretion Large early release frequency Pandemic Continuous fire watch |
MNS-14-072, Emergency Plan, Revision 14-3 | 17 September 2014 | Emergency Plan, Revision 14-3 | Grab sample B.5.b Earthquake Siren |
MNS-14-086, Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify Licenses With. | 18 November 2014 | Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify Licenses With. | FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
MNS-14-090, Response to August 28, 2014 NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | 12 November 2014 | Response to August 28, 2014 NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | Hot Short Safe Shutdown Probabilistic Risk Assessment Fire impairment Operator Manual Action Multiple Spurious Operation Thermoset Time Critical Operator Action Fire Protection Program |
MNS-14-095, Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | 12 December 2014 | Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | Hot Short Safe Shutdown Mission time Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operator Manual Action Thermoset Foreign Material Exclusion Large early release frequency Hemyc Cable Tray Ignition License Renewal Earthquake Fire Protection Program |
MNS-14-097, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review. | 17 December 2014 | Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review. | Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX B.5.b Fukushima Dai-Ichi Earthquake Power-Operated Valves |
MNS-14-102, Emergency Response Data System Changes | 16 December 2014 | Emergency Response Data System Changes | Power Uprate Measurement Uncertainty Recapture |
MNS-14-103, Submittal of Emergency Plan, Revision 14-5 | 16 December 2014 | Submittal of Emergency Plan, Revision 14-5 | Safe Shutdown Health Physics Network Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Slow transfer Cyber Security B.5.b Tornado Generated Missile Safeguards Contingency Plan Earthquake Pressure Boundary Leakage Minimum staff Power change Siren Operational leakage |
MNS-15-002, Response to August 28, 2014, & October 27, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | 26 January 2015 | Response to August 28, 2014, & October 27, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | Probabilistic Risk Assessment Thermoset Cable Tray Ignition Fire Protection Program |
MNS-15-004, Annual Commitment Change Report | 29 January 2015 | Annual Commitment Change Report | |
MNS-15-005, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 February 2015 | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Tornado Missile FLEX Spent Fuel Pool Instrumentation Battery sizing |
MNS-15-006, Fourth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Sfpi)(Order Number EA-12-051) | 26 February 2015 | Fourth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Sfpi)(Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
MNS-15-007, Lake Norman Maintenance Monitoring Program: 2013 Summary | 29 January 2015 | Lake Norman Maintenance Monitoring Program: 2013 Summary | |
MNS-15-008, Independent Spent Fuel Storage Installation (ISFSI) | 19 February 2015 | Independent Spent Fuel Storage Installation (ISFSI) | |
MNS-15-010, Inservice Inspection Report, End of Cycle 23 Refueling Outage | 12 February 2015 | Inservice Inspection Report, End of Cycle 23 Refueling Outage | Boric Acid Weld Overlay Hydrostatic VT-2 Thermal fatigue |
MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement | 23 March 2015 | Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement | Safe Shutdown Shutdown Margin Power Uprate Measurement Uncertainty Recapture |
MNS-15-016, Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments | 19 March 2015 | Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments | Shutdown Margin Tornado Missile FLEX Measurement Uncertainty Recapture |
MNS-15-018, License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors Dated November 2012 | 7 May 2015 | License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors Dated November 2012 | Safe Shutdown High winds Operating Basis Earthquake Earthquake |
MNS-15-022, Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements | 23 June 2015 | Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements | Safe Shutdown Surveillance Frequency Control Program |
MNS-15-025, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation | 9 July 2015 | License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation | |
MNS-15-031, Response to NRC Request for Additional Information Regarding Flood Hazard Reevaluation Report (FHRR) | 3 June 2015 | Response to NRC Request for Additional Information Regarding Flood Hazard Reevaluation Report (FHRR) | Fukushima Dai-Ichi |
MNS-15-052, Response to June 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | 15 July 2015 | Response to June 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | Hot Short Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Job Performance Measure Fire Protection Program |
MNS-15-053, Emergency Plan, Revision 15-2 | 21 July 2015 | Emergency Plan, Revision 15-2 | Grab sample B.5.b Earthquake Siren |
MNS-15-054, Withdrawal of License Amendment Request (LAR) for Technical Specification TS) 3.7.7 - Nuclear Service Water System (Nsws) | 29 July 2015 | Withdrawal of License Amendment Request (LAR) for Technical Specification TS) 3.7.7 - Nuclear Service Water System (Nsws) | |
MNS-15-060, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Tornado Missile FLEX Spent Fuel Pool Instrumentation Battery sizing |
MNS-15-061, Fifth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (SFPI) (Order Number EA-12-051) | 26 August 2015 | Fifth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (SFPI) (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
MNS-15-062, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition | 11 August 2015 | Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
MNS-15-066, Response to NRC June 18, 2015 and May 8, 2015 Requests for Additional Information Re License Amendment Request to Implement Risk-Informed Performance-Based Fire Protection Program | 20 August 2015 | Response to NRC June 18, 2015 and May 8, 2015 Requests for Additional Information Re License Amendment Request to Implement Risk-Informed Performance-Based Fire Protection Program | Safe Shutdown Probabilistic Risk Assessment Incorporated by reference Thermoset Large early release frequency Fire Protection Program |
MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. | 24 March 2016 | License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. | Surveillance Frequency Control Program Operability Determination Fuel cladding |
MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. | 28 August 2015 | Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. | Mission time Probabilistic Risk Assessment Surveillance Frequency Control Program Maintenance Rule Program Fuel cladding Grace period |
MNS-15-070, Response to August 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | 9 September 2015 | Response to August 18, 2015, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | Safe Shutdown Probabilistic Risk Assessment Fire Protection Program |