MNS-14-046, Station Initial Exam 2014-301 General Correspondence

From kanterella
Jump to navigation Jump to search
Station Initial Exam 2014-301 General Correspondence
ML15125A491
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/28/2014
From: Capps S
Duke Energy Carolinas
To: Mccree V
Region 2 Administrator
References
50-369/14-301, 50-370/14-301, MNS-14-046
Download: ML15125A491 (17)


Text

(

DUKE Steven D. Capps Vice President EI\\IERGY© McGuire Nuclear Station Duke Energy MGO1VP 12700 Hagers Ferry Road Huntersville, NC 28078 May 28, 2014 Serial No.: MNS-14-046 0875.4805 Steven.Cappsduke-energy.com Mr. Victor M. McCree Regional Administrator, Region H U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

Subject:

Duke Energy Carolinas, LLC McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 05000369/2014301 and 05000370/2014301 Pursuant to the requirements of NUREG-1 021, Operator Licensing Standards for Power Reactors, the enclosed information provides the Written Examination materials for the McGuire licensed operator examinations scheduled in August of 2014. The information is submitted as agreed upon with the Chief Examiner in accordance with the official NRC notification letter (120-Day Letter) and request for information in support of the examinations dated January 14, 2014.

Specific items provided in response to this request:

ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement ES 40 1-2, PWR Examination Outline ES 401-4, Record of Rejected K/As ES 401-6, Written Examination Quality Checklist Reactor Operator Written Examination Student Copy with Reference Package Senior Reactor Operator Written Examination Student Copy with Reference Package RO and SRO Written Examination Answer Keys Full Written Examination with Distracter Analysis Written Examination Question Reference Package and System Designator List The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1021, Section 201. The completion of this action is documented in the attached letter dated May 27, 2014.

Questions or comments should be directed to Kay Crane at (980) 875-4306 or Clark r at (980) 875-5302.

Steven D.

Site Vice President, McGuire Nuclear Station www.duke-energycom

U. S. Nuclear Regulatory Commission May 28, 2014 Page 2 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operations Branch 1 Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257 Mr. Bruno L. Caballero U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

U. S. Nuclear Regulatory Commission May 28, 2014 Page 3 bxc:

RGC Fife ECO5P-ELL

Steven D. Capps Vice President McGuire Nuclear Station Duke Energy MGO1VP 12700 Hagers Ferry Road June 18, 2014 Huntersville, NC 28078 Serial Number: MNS-14-050 j 9808754805 f 980.875.4809 Mr. Victor M. McCree Steven.Capps@duke-energy.com Regional Administrator, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

Subject:

Duke Energy Carolinas, LLC McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 05000369/2014301 and 05000370/2014301 Pursuant to the requirements of NUREG-i 021, Operator Licensing Standards for Power Reactors, the enclosed information provides the Operating Examination materials for the McGuire licensed operator examinations scheduled in August of 2014. The information is submitted as agreed upon with the Chief Examiner in accordance with the official NRC notification letter (120-Day Letter) and request for information in support of the examinations dated January 14, 2014.

Specific items provided in response to this request:

ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement ES 301-1, Administrative Topics Outline (RO and SRO positions)

ES 301-2, Control Room/In-Plant Systems Outline (RO, SRO-U, and SRO-l positions)

ES 301-3, Operating Test Quality Checklist ES 301-4, Simulator Scenario Quality Checklist ES 301-5, Transient and Event Checklist ES 301-6, Competencies Checklist ES-D-i, Scenario Outlines (4)

ES-D-2, Required Operator Actions (4)

Control Room and In-Plant Job Performance Measures (JPM) Worksheets (ES-C-i) (ii)

Reactor Operator Administrative JPM Worksheets (ES-C-i) (4)

Senior Reactor Operator Administrative JPM Worksheets (ES-C-i) (5)

The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated June 17, 2014.

Questions or comments should be directed to Kay Crane at (980) 875-4306 or Clark Fletcher at (980) 875-5302.

s,&O31fr/

Steven D. Capp Site Vice President, McGuire Nuclear Station www.duke-energy.com V/

U. S. Nuclear Regulatory Commission June 18, 2014 Page 2 Eugene F. Guthrie, Chief U.S. Nuclear Regulatory Commission Operations Branch 2 Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Badwin U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257

June 17, 2014 To Whom It May Concern Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.

As the McGuire facility representative, I have reviewed and approved the NRC Operating Examination to be administered in August 2014.

I have determined that the Operating Examination is accurate, operationally valid and ready for NRC review.

Brent Bare McGuire Operations

2014 NRC Exam Student Questions Question Number:

L/

Student Docket Number:

33 -q Z Student Question

t ccJç h cW Mi cA c QC4cf 0

Proctor Initiai Response Chief Examiner Response

/

4

/-St4E1 3ASE2 j

2014 NRC Exam Student Questions Question Number: q /

Student Docket Number: 6 2 s 2.

Student Question fl.

(i

PARr, 7?E.FEI2 Th T,-ic rt msi?

fV

?o 7fc1 3

Proctor Initial Response Chief Examiner Response eY)OUJi

,i;(:)7Dn-

/J

-i-1

2014 NRC Exam Student Questions Question Number: Z Student Docket Number:

2 3Z Student Question JJI

?

Proctor Initial Response A1 %1E:

Chief Examiner Response V

/4 N V 24

2014 NRC Exam Student Questions J_&_c-tlt Question Number:

Student Docket Number:

5 2 Student Question tAr 7yp c

T o

,g.

LrL Proctor Initial Response Chief Examiner Response e.

&J -c

  • Ae IA iP I

I

2014 NRC Exam Student Questions Question Number:

Student Docket Number: j Student Question i La s3 Proctor Initial Response Chief Examiner Response NoT TYPO

2014 NRC Exam Student Questions Question Number:

Student Docket Number:

55-21Z3Z-Student Question I

I,

.iecr;CC(I Ca Does +LiS rvct tkc JeArcS - 1+-

÷ Zt4 b COt4.SeG

÷-.t-1/o?

O, yi e(e.c+ri cot 4

?c Sovi)v o1-k.r 4.k.crs..

iA

+-ke b!Lko+ 7 Proctor Initial Response

)Vojr Chief Examiner Response TJn /? s 6i 2z(

C

/ As c

2014 NRC Exam Student Questions Question Number:

Lj 0/

Student Docket Number:

z Student Queslion C

1 tccr,4/ck SO P p-y--

IoLroev --os

+L vftu

.i

÷4-4ke 4-cL so3p pres 1-L v-oø 4k ered--?

Qr, s,oLAd 4

rcio:

U

%tI+O(*

ji S.

0 L

ScI tu cewt6%

k4 Mk4J I,

7 Proctor Initial Response 4c V Chief Examiner Response

?tkd 5c2

2014 NRC Exam Student Questions Question Number:

Student Docket Number: S

230 Student Question I

1 ptl OtJM o ii-vfl 1WS I!

I

-z ID L-Ov9 p I F S

i)oT mo i c)

LQ Proctor IntiaI Response No /VE Chief Examiner Response

/V9 4 4

3 A.:; p,776-4

7/esE A X/

4 1

2014 NRC Exam Student Questions Question Number:

Student Docket Number: 1- ?Li 270 Student Question ik jCrr1 (QE /

At)

C)F I

iS 6&UO.

IS tO

?1

/

Proctor Initia Response Chief Examiner Response V

JvF* /7?4 t,

2014 NRC Exam Student Questions Question Number:

Student Docket Number: c 3 (

Student Question t I

/-f13

-(J-pj 1J

çwsr t 5

tp-:,

Proctor Initial Response Chief Examiner Response YEs.

2014 NRC Exam Student Questions Question Number:

Student Docket Number:

5 Student Question Is RE1+cL E\\JB Proctor Initial Response A!fV Chief Examiner Response Ekg