Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000390/LER-2016-0019 March 2016Channel Mode Switch in Incorrect Position Renders Lower Containment Atmosphere Particulate Radiation Monitor Inoperable
LER 16-001-00 for Watts Bar, Unit 1, Regarding Channel Mode Switch in Incorrect Position Renders Lower Containment Atmosphere Particulate Radiation Monitor Inoperable
Safe Shutdown
Grab sample
05000390/LER-2016-00310 May 2016Technical Specification Surveillance Requirement Not Met During Emergency Core Cooling System Venting
LER 16-003-00 for Watts Bar, Unit 1, Regarding Technical Specification Surveillance Requirement Not Met During Emergency Core Cooling System Venting
Safe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Missed surveillance
05000390/LER-2016-00423 May 2016Automatic Reactor Trip Due to Actuation of Over Temperature Delta Temperature Bistables
LER 16-004-00 for Watts Bar, Unit 1, Regarding Automatic Reactor Trip Due to Actuation of Over Temperature Delta Temperature Bistables
Safe Shutdown
05000390/LER-2016-00513 May 2016Both Trains of Unit 1 Emergency Gas Treatment System Inoperable During Unit 2 Testing
LER 16-005-00 for Watts Bar, Unit 1, Regarding Both Trains of Unit 1, Emergency Gas Treatment System Inoperable During Unit 2, Testing
Safe Shutdown
Stroke time
Safe Shutdown Earthquake
Past operability
05000390/LER-2016-00630 June 2016Undersized Room Cooler Fan Shaft Results in Loss of Centrifugal Charging Pump
LER 16-006-00 for Watts Bar, Unit 1, Regarding Undersized Room Cooler Fan Shaft Results in Loss of Centrifugal Charging Pump
Safe Shutdown
Mission time
Past operability
05000390/LER-2016-00720 June 2016Technical Specification Action Not Met for Rod Position Indication
LER 16-007-00 for Watts Bar Nuclear Plant, Unit 1 Regarding Technical Specification Action Not Met for Rod Position Indication
Safe Shutdown
Rod Drop Event
05000390/LER-2016-00815 July 2016Emergency Diesel Generator Manual Start Due to Loss of Voltage on the 6.9kV Shutdown Board 1B-B
LER 16-008-00 for Watts Bar, Unit 1, Regarding Emergency Diesel Generator Manual Start Due to Loss of Voltage on the 6.9kV Shutdown Board 1B-B
Safe Shutdown
Open Phase Condition
05000390/LER-2016-00915 July 2016Failure to Complete Surveillance Requirements Causes a Condition Prohibited by the Technical Specifications
LER 16-009-00 for Watts Bar, Unit 1, Regarding Failure to Complete Surveillance Requirements Causes Conditions Prohibited by the Technical Specifications
Missed surveillance
05000390/LER-2016-0108 August 2016Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado
LER-16-010-00 for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado
Safe Shutdown
Unanalyzed Condition
05000390/LER-2016-0119 December 2016Loss of Centrifugal Charging Pump Due to Repeat Failure of Associated Room Cooler
LER 16-011-01 for Watts Bar Nuclear Plant, Unit 1 Regarding Loss of Centrifugal Charging Pump Due to Repeat Failure of Associated Room Cooler
Safe Shutdown
Mission time
Past operability
05000390/LER-2017-00114 February 2017Failure of Emergency Raw Cooling Water Pump Reverse Rotation Keys Represents Potential Common Cause Inoperability
Watts Bar, Units 1 and 2 - Cancellation of Licensee Event Report 390/2017-001 Related to Essential Raw Cooling Water Pump Reverse Rotation Keys Representing a Potential Common Cause lnoperability
Safe Shutdown
05000390/LER-2017-00222 February 2017Incorrectly Hung Clearance Leads to a Condition Prohibited by the Technical Specifications
LER 17-002-00 for Watts Bar Nuclear Plant, Unit 1, Regarding: Incorrectly Hung Clearance Leads to a Condition Prohibited by the Technical Specifications
Safe Shutdown
05000390/LER-2017-0033 March 2017Inadequate Operability Determination Leads to a Condition Prohibited by the Technical Specifications
LER 17-003-00 for Watts Bar, Unit 1, Regarding Inadequate Operability Determination Leads to a Condition Prohibited by the Technical Specifications
Safe Shutdown
Safe Shutdown Earthquake
Functionality Assessment
Pressure boundary leak
Through-Wall Leak
05000390/LER-2017-00431 August 2017Manual Reactor Trips Due to Failed Reactor Coolant Pump Power Transfer During Plant Startup
LER 17-004-01 for Watts Bar, Unit 1, Regarding Manual Reactor Trips Due to Failed Reactor Coolant Pump Power Transfer During Plant Startup
Safe Shutdown
Anticipated operational occurrence
05000390/LER-2017-00510 July 2017Isolation of the 1 B-B Safety Injection Pump Leads to Condition Prohibited by Technical Specifications
LER 17-005-00 for Watts Bar re Isolation of the 1B-B Safety Injection Pump Leads to a Condition Prohibited by Technical Specifications
Safe Shutdown
05000390/LER-2017-00631 July 2017Structural Degradation of 161 kV Line Pole Leads to a Condition Prohibited by Technical Specifications
LER 17-006-00 for Watts Bar, Unit 1, Regarding Structural Degradation of 161 kV Line Pole Leads to a Condition Prohibited by Technical Specifications
Safe Shutdown
05000390/LER-2017-0078 August 2017Multiple Unreported Potential Loss of Safety Function Events Associated with Inoperable Single Train Systems Due to Misinterpretation of Reporting Guidance
LER 17-007-00 for Watts Bar, Unit 1, Regarding Multiple Unreported Potential Loss of Safety Function Events Associated with Inoperable Single Train Systems Due to Misinterpretation of Reporting Guidance
Safe Shutdown
Rod Drop Event
05000390/LER-2017-00814 August 2017Shield Building Inoperability and Potential Loss of Safety Function Resulting from Spurious Equipment Operation
LER 17-008-00 for Watts Bar, Unit 1, Regarding Shield Building Inoperability and Potential Loss of Safety Function Resulting from Spurious Equipment Operation
Safe Shutdown
05000390/LER-2017-01010 October 2017Actuation of Turbine Driven Auxiliary Feedwater Pump Due to Loss of 6.9kV Shutdown Board
LER 17-010-00 for Watts Bar Nuclear Plant, Unit 1 Regarding Actuation of Turbine Driven Auxiliary Feedwater Pump Due to Loss of 6.9kV Shutdown Board
Safe Shutdown
05000390/LER-2017-01123 October 2017Failure to Enter Technical Specification 3.6.3 for Containment Isolation Valve
LER 17-011-00 for Watts Bar, Unit 1, Regarding Failure to Enter Technical Specification 3.6.3 for Containment lsolation Valve
Safe Shutdown
Time of Discovery
05000390/LER-2017-01223 October 2017Error in Plant Emergency Procedures Leads to a Condition Prohibited by the Technical Specifications
LER 17-012-00 for Watts Bar, Unit 1, Regarding Error in Plant Emergency Procedures Leads to a Condition Prohibited by the Technical Specifications
Safe Shutdown
Past operability
Probabilistic Risk Assessment
05000390/LER-2017-01324 January 20181 OF 5
LER 17-013-01 for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Incorrectly Adjusted Auxiliary Building Gas Treatment System Damper Leads to a Condition Prohibited by Technical Specifications
Safe Shutdown
Safe Shutdown Earthquake
Past operability
Probabilistic Risk Assessment
05000390/LER-2017-01420 December 2017Main Control Room Boundary Door Left Open Leading to a Loss of Safety Function
LER 17-014-00 for Watts Bar, Unit 1, Regarding Main Control Room Boundary Door Left Open Leading to a Loss of Safety Function
Safe Shutdown
Probabilistic Risk Assessment
05000390/LER-2017-0158 January 2018Failure to Enter Limiting Condition of Operation Action Statement Results in a Condition Prohibited by Technical Specifications
LER 17-015-00 for Watts Bar, Units 1 and 2, Regarding Failure to Enter Limiting Condition of Operation Action Statement Results in a Condition Prohibited by Technical Specifications
Safe Shutdown
05000391/LER-2016-00113 June 2016Loss of Automatic Containment Isolation for the Steam Generator Blowdown Sampling Lines
LER 16-001-00 for Watts Bar, Unit 2, Regarding Loss of Automatic Containment Isolation for the Steam Generator Blowdown Sampling Lines
Safe Shutdown
05000391/LER-2016-00211 July 2016Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Turbine Speed Control Failure
LER 16-002-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer Than Allowable Outage Time Due to Turbine Speed Control Failure
Safe Shutdown
Past operability
05000391/LER-2016-00327 July 2016Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Governor Valve Spring Over-Tensioning
LER 16-003-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump lnoperable for Longer Than Allowable Outage Time Due to Governor Valve Spring Over-Tensioning
Safe Shutdown
Past operability
05000391/LER-2016-0044 August 2016Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure
LER 16-004-00 for Watts Bar, Unit 2, Regarding Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure
Safe Shutdown
Flow Induced Vibration
05000391/LER-2016-00519 August 2016Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip
LER 16-005-00 for Watts Bar, Unit 2, Regarding Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip
Safe Shutdown
05000391/LER-2016-00828 October 2016Reactor Trip Resulting from Failure of 2B Main Bank Transformer
LER 16-008-00 for Watts Bar, Unit 2, Regarding Reactor Trip Resulting from Failure of 2B Main Bank Transformer
Safe Shutdown
05000391/LER-2017-0013 May 2017Containment Airlock Function Lost Due to Equalizing Valve Not Closing
LER 17-001-00 for Watts Bar, Unit 2, Regarding Containment Airlock Function Lost Due to Equalizing Valve Not Closing
Safe Shutdown
05000391/LER-2017-00212 May 2017Manual Reactor Trip as a Result of a Secondary Plant Transient
LER 17-002-00 for Watts Bar, Unit 2, Regarding Manual Reactor Trip as a Result of a Secondary Plant Transient
Safe Shutdown
Anticipated operational occurrence
Power change
05000391/LER-2017-00322 May 2017Automatic Start of Auxiliary Feedwater System Due to Main Condenser Failure
LER 17-003-00 for Watts Bar, Unit 2, Regarding Automatic Start of Auxiliary Feedwater System Due to Main Condenser Failure
Safe Shutdown
Anticipated operational occurrence
05000391/LER-2017-00425 September 2017Manual Reactor Trip Due to Inoperable Rod Position Indication
LER 17-004-00 for Watts Bar Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due to Inoperable Rod Position Indication
Safe Shutdown
Anticipated operational occurrence
05000391/LER-2017-00525 January 2018Unplanned Emergency Core Cooling System Injection into the Reactor Coolant System due to Personnel Error
LER 17-005-00 for Watts Bar, Unit 2, Regarding Unplanned Emergency Core Cooling System Injection into the Reactor Coolant System due to Personnel Error
Safe Shutdown
CNL-13-102, TVA - Submittal of Revision 39 to Central Emergency Control Center - Emergency Plan Implementing Procedure CECC EPIP-8, Dose Assessment Staff Activities During Nuclear Plant Radiological Emergencies18 October 2013TVA - Submittal of Revision 39 to Central Emergency Control Center - Emergency Plan Implementing Procedure CECC EPIP-8, Dose Assessment Staff Activities During Nuclear Plant Radiological Emergencies
CNL-13-110, Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment8 November 2013Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment
CNL-13-112, Response to NRC Request for Additional Information Related to License Amendment Request to Updated Final Safety Analysis Report Changes Associated with Hydrologic Analysis from Mechanical and Civil Engineering Branch21 October 2013Response to NRC Request for Additional Information Related to License Amendment Request to Updated Final Safety Analysis Report Changes Associated with Hydrologic Analysis from Mechanical and Civil Engineering BranchHydrostatic
Earthquake
CNL-13-113, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-9, Revision 5031 October 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-9, Revision 50
CNL-13-114, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status Report31 October 2013the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status ReportCommercial Grade Dedication
CNL-13-115, Change to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-05129 October 2013Change to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051Spent Fuel Pool Instrumentation
CNL-13-116, Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report22 November 2013Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report
CNL-13-119, Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule22 November 2013Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule
CNL-13-121, Service List Update for Routine Information24 December 2013Service List Update for Routine Information
CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information24 December 2013Service List Update for Documents Containing Official Use Only and Safeguards Information
CNL-13-124, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Ta2 December 2013Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term TaskFukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
CNL-13-125, Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)22 November 2013Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (Safe Shutdown Earthquake
Operating Basis Earthquake
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A5 December 2013Nuclear Quality Assurance Plan, TVA-NQA-PLN89-AFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
Grace period
CNL-13-135, Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)20 December 2013Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Enforcement Discretion
Operating Basis Earthquake
Operator Manual Action
Zebra Mussel
Multiple Spurious Operation
Emergency Lighting
Incorporated by reference
Thermoset
B.5.b Mitigating Strategies
Earthquake
Accidental discharge
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project31 December 2013Third Progress Update on Improved Flood Mitigation System Project