TVA - Submittal of Revision 39 to Central Emergency Control Center - Emergency Plan Implementing Procedure CECC EPIP-8, Dose Assessment Staff Activities During Nuclear Plant Radiological Emergencies
ML15205A185
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/18/2013
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-13-102
Download: ML15205A185 (2)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-13-102 October 18, 2013 10 CFR 50, Appendix E, Section V 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Central Emergency Control Center - Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below.

EPIP Revision Title Effective Date CECC EPIP-8 39 Dose Assessment Staff Activities 10/8/2013 During Nuclear Plant Radiological Emergencies Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 October 18, 2013 provides a summary of the changes and the analysis performed that concluded the changes do not affect the outcome, results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosure 2 provides a copy of the revised EPIP.

There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact E. D. Schrull at (423) 751-3850.

Respectfully, W.Shea ice President, Nuclear Licensing

Enclosures:

1. Summary of Changes and Analysis
2. Central Emergency Control Center (CECC), Emergency Plan Implementing Procedure (EPIP) Revision cc (Enclosures):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant