Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
AEP-NRC-2018-75, Registration of Dry Spent Fuel Storage Cask22 October 2018Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2018-79, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask15 November 2018Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-49, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask10 August 2021Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask26 August 2021Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask20 September 2021Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask12 October 2021Registration of Dry Spent Fuel Storage Cask
AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask8 November 2021Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)9 October 2002Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)
BVY 03-005, Technical Specification Proposed Change No. 256, Administrative Changes to Position Titles and Miscellaneous Changes Supplement No. 120 January 2003Technical Specification Proposed Change No. 256, Administrative Changes to Position Titles and Miscellaneous Changes Supplement No. 1High Radiation Area
BVY 03-016, Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee26 March 2003Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee S
BVY 03-026, Sources and Levels of Insurance Required by 10 CFR 50.54(w)28 March 2003Sources and Levels of Insurance Required by 10 CFR 50.54(w)
BVY 03-027, Cycle 22 10CFR50.59 Report20 March 2003Cycle 22 10CFR50.59 ReportTemporary Modification
Abnormal operational transient
BVY 03-039, Technical Specification Proposed Change No. 257 Implementation of Art/Mellla at Vermont Yankee - Supplement No. 117 April 2003Technical Specification Proposed Change No. 257 Implementation of Art/Mellla at Vermont Yankee - Supplement No. 1Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
MELLLA
BVY 03-041, Emergency Plan Implementing Procedure Changes30 April 2003Emergency Plan Implementing Procedure ChangesHigh Radiation Area
Nondestructive Examination
Exemption Request
Fire Protection Program
BVY 03-044, 2002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants28 May 20032002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants
BVY 03-047, Emergency Plan Implementing Procedure Changes14 May 2003Emergency Plan Implementing Procedure ChangesHigh Radiation Area
Nondestructive Examination
Fire Protection Program
BVY 03-065, Emergency Plan Implementing Procedure Changes23 July 2003Emergency Plan Implementing Procedure ChangesFitness for Duty
High Radiation Area
Nondestructive Examination
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 200318 August 2003Fitness-for-Duty Program Performance Report for Period January - June 2003Fitness for Duty
Stolen
BVY 03-102, Technical Specification Proposed Change No. 262 - Supplement No. 3, Alternative Source Term - Modified Exemption Request7 November 2003Technical Specification Proposed Change No. 262 - Supplement No. 3, Alternative Source Term - Modified Exemption RequestExemption Request
BVY 03-106, Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)18 November 2003Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)
BVY 03-107, Technical Specification Proposed Change No. 262 - Additional Information Alternative Source Term - Copyright Release20 November 2003Technical Specification Proposed Change No. 262 - Additional Information Alternative Source Term - Copyright ReleaseSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Seismically rugged
Design basis earthquake
Earthquake
Scaffolding
Weak link
BVY 03-108, Response to NRC Bulletin 2003-043 December 2003Response to NRC Bulletin 2003-04
BVY 03-110, Report of Bulk Chlorine Rail Shipments for 20032 December 2003Report of Bulk Chlorine Rail Shipments for 2003
BVY 03-111, 10CFR50.46(a)(3)(ii) Annual Report for 20035 December 200310CFR50.46(a)(3)(ii) Annual Report for 2003MELLLA
BVY 03-112, Emergency Plan Implementing Procedure Changes17 December 2003Emergency Plan Implementing Procedure ChangesHigh Radiation Area
Nondestructive Examination
BVY 03-114, Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change5 December 2003Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) ChangeSafety Limit Minimum Critical Power Ratio
Abnormal operational transient
Fuel cladding
BVY 03-117, Response to a RAI Regarding Technical Specification Proposed Change No. 262, Alternative Source Term11 December 2003Response to a RAI Regarding Technical Specification Proposed Change No. 262, Alternative Source Term
BVY 03-119, Second Response to RAI Regarding Technical Specification Proposed Change No. 262 for Incorporation of an Alternative Source Term30 December 2003Second Response to RAI Regarding Technical Specification Proposed Change No. 262 for Incorporation of an Alternative Source Term
BVY 03-120, Supplement to Relief Request RI-0123 December 2003Supplement to Relief Request RI-01
BVY 04-005, Technical Specification Proposed Change No. 257 Implementation of Arts/Mellla at Vermont Yankee Correction of Peak Cladding Temperature for GE13 Fuel20 January 2004Technical Specification Proposed Change No. 257 Implementation of Arts/Mellla at Vermont Yankee Correction of Peak Cladding Temperature for GE13 FuelMELLLA
BVY 04-009, Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review31 January 2004Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review
BVY 04-016, Annual Submittal of Quality Assurance Program Changes (Revision 14)9 February 2004Annual Submittal of Quality Assurance Program Changes (Revision 14)Coatings
Nondestructive Examination
Fire Protection Program
BVY 04-017, Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 8 Regarding Alternative Source Term10 February 2004Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 8 Regarding Alternative Source Term
BVY 04-018, Fitness-for-Duty Program Performance Report for the Period of July - December 200323 February 2004Fitness-for-Duty Program Performance Report for the Period of July - December 2003Fitness for Duty
BVY 04-021, Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 9, Alternative Source Term18 February 2004Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 9, Alternative Source Term
BVY 04-022, Response to RAI on Relief Requests to Use ASME Code Case N-6004 March 2004Response to RAI on Relief Requests to Use ASME Code Case N-600
BVY 04-023, Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 10, Alternative Source Term25 February 2004Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 10, Alternative Source Term
BVY 04-025, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Suplement No. 6 Extended Power Uprate - Withholding Proprietary Information4 March 2004Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Suplement No. 6 Extended Power Uprate - Withholding Proprietary Information
BVY 04-026, Technical Specification Proposed Change No. 257, Supplement 7, Implementation of Arts/Mella at Vermont Yankee, Revised Anticipated Transient Without Scram Evaluation11 March 2004Technical Specification Proposed Change No. 257, Supplement 7, Implementation of Arts/Mella at Vermont Yankee, Revised Anticipated Transient Without Scram EvaluationMELLLA
BVY 04-027, Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 118 March 2004Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 1
BVY 04-028, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)25 March 2004Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)
BVY 04-032, Additional Information in Support of Technical Specification Proposed Changes No. 262, Supplement No. 11, Meteorological Database for Ground-Level Releases17 March 2004Additional Information in Support of Technical Specification Proposed Changes No. 262, Supplement No. 11, Meteorological Database for Ground-Level Releases
BVY 04-033, Sources and Levels of Insurance Required by 10 CFR 50.54(w)29 March 2004Sources and Levels of Insurance Required by 10 CFR 50.54(w)
BVY 04-034, Entergy Nuclear Operations, Inc. Service List Update31 March 2004Entergy Nuclear Operations, Inc. Service List Update
BVY 04-038, Change to the Emergency Plan, Revision 3928 April 2004Change to the Emergency Plan, Revision 39Health Physics Network
Ultimate heat sink
Deep Dose Equivalent
Minimum staff
BVY 04-039, Emergency Response Data System Data Point Library Update30 April 2004Emergency Response Data System Data Point Library Update
BVY 04-040, Core Operating Limits Report for Cycle 2428 April 2004Core Operating Limits Report for Cycle 24MELLLA
Fuel cladding
BVY 04-041, Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty28 April 2004Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-DutyEnforcement Discretion
BVY 04-045, Technical Specification Proposed Change No. 262 - Supplement No. 12 Alternative Source Term - Confirmation of Refueling Outage Activities12 May 2004Technical Specification Proposed Change No. 262 - Supplement No. 12 Alternative Source Term - Confirmation of Refueling Outage Activities
BVY 04-054, Response to 10CFR2.206 Petition Information Request8 June 2004Response to 10CFR2.206 Petition Information Request