Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000327/LER-2015-00422 January 2016Manual Reactor Trip due to Main Steam Isolation Valve Drifting in the Closed Direction
LER 15-004-00 for Sequoyah, Unit 1, Regarding Manual Reactor Trip Due to Main Steam Isolation Valve Drifting in the Closed Direction
Safe Shutdown
Post Accident Monitoring
05000327/LER-2016-00111 April 2016Automatic Safety Injection due to Low Steam Line Pressure on Loop 2 Main Steam
LER 16-001-00 for Sequoyah, Unit 1, Regarding Automatic Safety Injection due to Low Steam Line Pressure on Loop 2 Main Steam
Safe Shutdown
05000327/LER-2017-00126 April 2017Breached Door Renders Both Trains of the Auxiliary Building Gas Treatment System Inoperable
LER 17-001-00 for Sequoyah, Unit 1, Regarding Breached Door Renders Both Trains of the Auxiliary Building Gas Treatment System Inoperable
Safe Shutdown
Probabilistic Risk Assessment
Continuous fire watch
05000327/LER-2017-00214 July 2017Automatic Actuation of Emergency Diesel Generators Due to Loss of Power to 6.9kV Shutdown Board
LER 17-002-00 for Sequoyah, Unit 1, Regarding Automatic Actuation of Emergency Diesel Generators Due to Loss of Power to 6.9kV Shutdown Board
Safe Shutdown
05000327/LER-2021-001, & LER 2021-001-00 for Sequoyah Nuclear Plant, Units 1 & 2, Ice Bed Inoperable Due to Exceeding Surveillance Requirement Frequency22 September 2021& LER 2021-001-00 for Sequoyah Nuclear Plant, Units 1 & 2, Ice Bed Inoperable Due to Exceeding Surveillance Requirement FrequencySafe Shutdown
05000327/LER-2021-002, Letter Forwarding LER 2021-002-00 & LER 2021-001-00 for Sequoyah Nuclear Plant, Units 1 & 222 September 2021Letter Forwarding LER 2021-002-00 & LER 2021-001-00 for Sequoyah Nuclear Plant, Units 1 & 2
05000328/LER-2015-0026 January 2016Unanalyzed Condition Due To Inoperable Containment Recirculation Drains
LER 15-002-00 for Sequoyah, Unit 2, Regarding Unanalyzed Condition Due to Inoperable Containment Recirculation Drains
Safe Shutdown
Unanalyzed Condition
CNL-13-102, TVA - Submittal of Revision 39 to Central Emergency Control Center - Emergency Plan Implementing Procedure CECC EPIP-8, Dose Assessment Staff Activities During Nuclear Plant Radiological Emergencies18 October 2013TVA - Submittal of Revision 39 to Central Emergency Control Center - Emergency Plan Implementing Procedure CECC EPIP-8, Dose Assessment Staff Activities During Nuclear Plant Radiological Emergencies
CNL-13-103, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a)17 October 2013Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a)Boric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Hydrostatic
Coatings
Aging Management
License Renewal
Earthquake
Biofouling
Through-Wall Leak
Fire Protection Program
CNL-13-104, Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87)21 October 2013Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87)High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Earthquake
Biofouling
Fire Protection Program
CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)4 November 2013Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)High Radiation Area
Fire Barrier
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
Earthquake
Biofouling
Fire Protection Program
CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B15 November 2013Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B.1Safe Shutdown
High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Moisture barrier
Earthquake
Biofouling
Fire Protection Program
CNL-13-108, Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval15 October 2013Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection IntervalProbabilistic Risk Assessment
CNL-13-110, Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment8 November 2013Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment
CNL-13-113, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-9, Revision 5031 October 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-9, Revision 50
CNL-13-114, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status Report31 October 2013the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status ReportCommercial Grade Dedication
CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report18 November 201310 CFR 50.46 - Combined Annual and 30-Day Report
CNL-13-121, Service List Update for Routine Information24 December 2013Service List Update for Routine Information
CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information24 December 2013Service List Update for Documents Containing Official Use Only and Safeguards Information
CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1..16 December 2013Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1..Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
Earthquake
Biofouling
Through-Wall Leak
Fire Protection Program
CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A5 December 2013Nuclear Quality Assurance Plan, TVA-NQA-PLN89-AFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
Grace period
CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project31 December 2013Third Progress Update on Improved Flood Mitigation System Project
CNL-13-139, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02)11 December 2013Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02)Safe Shutdown
Ultimate heat sink
Design basis earthquake
CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision13 December 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures24 December 2013TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures
CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request31 December 2013Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension RequestFukushima Dai-Ichi
CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures24 December 2013TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures
CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision24 December 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
CNL-14-008, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report31 January 2014the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status ReportCommercial Grade Dedication
CNL-14-009, Response to NRC Request for Additional Information Related to Review of Potential Breaches of Hesco Modular Flood Barriers and Earthen Embankments Affecting the Updated Hydrologic Analysis Results31 January 2014Response to NRC Request for Additional Information Related to Review of Potential Breaches of Hesco Modular Flood Barriers and Earthen Embankments Affecting the Updated Hydrologic Analysis Results
CNL-14-011, Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME8806 and ME880725 April 2014Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME8806 and ME8807Temporary Modification
CNL-14-013, Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding...31 January 2014Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding...Safe Shutdown
Unanalyzed Condition
Fukushima Dai-Ichi
Earthquake
Scaffolding
CNL-14-016, Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electrical Power System3 February 2014Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electrical Power SystemOpen Phase Condition
CNL-14-017, Update Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments7 February 2014Update Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) AssessmentsFukushima Dai-Ichi
CNL-14-018, Response to NRC Request for Additional Information Re Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) Tac Nos MF2446...13 February 2014Response to NRC Request for Additional Information Re Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) Tac Nos MF2446...
CNL-14-021, Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482)3 March 2014Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482)Boric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Moisture barrier
Earthquake
Biofouling
Fire Protection Program
CNL-14-024, Transmittal of Corrected Figure for Application to Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (SQN-TS-12-02)20 February 2014Transmittal of Corrected Figure for Application to Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (SQN-TS-12-02)
CNL-14-029, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant28 February 2014Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear PlantSpent Fuel Pool Instrumentation
CNL-14-033, Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events5 March 2014Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsBoric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Severe Accident Management Guideline
Earthquake
CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc31 March 2014Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidSafe Shutdown
Boric Acid
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Earthquake
Seismic Walkdown Report
CNL-14-039, Tennessee Valley Authority - Submittal of Radiological Emergency Plan Revision16 April 2014Tennessee Valley Authority - Submittal of Radiological Emergency Plan Revision
CNL-14-048, Fourth Progress Update on Improved Flood Mitigation System Project31 March 2014Fourth Progress Update on Improved Flood Mitigation System Project
CNL-14-049, CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report3 April 2014CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report
CNL-14-050, Fourth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request31 March 2014Fourth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension RequestFukushima Dai-Ichi
CNL-14-052, TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update (TAC Nos. MF0422 April 2014TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update (TAC Nos. MF0481Safe Shutdown
Boric Acid
Coatings
Nondestructive Examination
Aging Management
CNL-14-063, the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report30 April 2014the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status ReportCommercial Grade Dedication
CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification9 May 2014151-1 and 13-151-2 Relief Request Interval Applicability Clarification
CNL-14-075, Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 827 May 2014Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8Cyber Security
CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 327 May 2014Documents for the Environmental Review of License Renewal Application - Env 3Zebra Mussel
CNL-14-093, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision16 July 2014Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision