Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML10357036122 December 2010Letter Response to Notice of Violation 07001257-EA-10-041 Acknowledgment Letter
ML11003069530 December 2010IR 70-1257-10-010 & Notice of Violation, on 11/18/10, Areva Np, Inc., RichlandFire Protection Program
ML14251A14515 September 2014Response to 03/26/2014, Nuclear Energy Institute Letter on Dermal and Ocular Quantitative Exposure StandardBackfit
ML18025B25025 January 2018Framatome Inc., - NRC Integrated Inspection Report 0701257/2017005Fire Barrier
Fire Protection Program
ML18039A42815 February 2018Framatone Inc. - Acceptance for Review of Framatome Triennial Update to Decommissioning Funding Plan (Enterprise Project Identifier L-2018-DFA-0001)Decommissioning Funding Plan
ML18064A1752 March 2018Framatome 2018 Lpr Letter
ML18082A02623 March 2018Summary of Public Meeting on Licensee Performance Review for Framatome, Inc
ML18106A12526 April 2018Framatome, Inc., Amendment 10 to License SNM-1227 Application for Name Change (Enterprise Project Identifier L-2018-LLA-0009)
ML18110A02320 April 2018Framatome Inc., - Nuclear Regulatory Commission Integrated Inspection Report 70-1257/2018002Uranium Hexafluoride
ML18129A24516 May 2018Framatome: Request for Additional Information Update to Decommissioning Funding Plan (L-2018-DFA-0001)Decommissioning Funding Plan
ML18176A19725 June 20182019 Framatome Inspection Schedule (Non-Safeguards)
ML18186A2379 July 2018Letter Framatome L-2018-DFA-0001 Decommissioning Funding Plan Update AcceptDecommissioning Funding Plan
ML18200A24019 July 2018Framatome Inc., - Nuclear Regulatory Integrated Inspection Report 07001257/2018003
ML18201A08319 July 2018Framatome, Inc., NRC Inspection Report 07001257/2018410
ML18207A30431 July 2018Framatome Inc., L-2018-DFA-0001 Approval of Time Extension for Funding Instrument
ML18255A11925 September 2018Framatome, Inc., Amendment 11 to License SNM-1227; Physical Protection Plan, Rev. 11 (Enterprise Project L-2018-SPR-0001)
ML18283A0479 October 2018Letter Transmitting Amendment to Standby Trust Agreement for License SNM-1227
ML18283A07810 October 2018Framatome Inc. - Nuclear Regulatory Commission Inspection Report 70-1257/2018-401
ML18283A1169 October 2018Amendment to Letter of Credit 2018
ML18297A09024 October 2018Framatome Quarterly IR 2018-004
ML18340A09416 January 2019Framatome - Amend 12 Updated DFP Letter (L-2018-DFA-0010)Decommissioning Funding Plan
ML18344A63310 December 2018Framatome - Enclosusuggested Format for Credit Industriel Et Commercial
ML18344A63410 December 2018Framatome - Enclosusuggested Format for Bank of America
ML19025A01725 January 2019Framatome, Inc. - Nuclear Regulatory Commission Integrated Inspection Report 70-1257/2018-005Hydrostatic
Emergency Lighting
Fire Protection Program
ML19038A44112 February 2019Framatome Inc. Extending the Due Date for Decommissioning the Uranyl Nitrate Building
ML19098B59211 April 2019Framatome, Inc. - Acceptance for Review of Emergency Plan, Version 14.0 (L-2018-EPR-0002)
ML19109A00217 April 2019Framatome Quarterly IR 2019-002
ML19170A30919 June 2019Framatome, Inc., Calendar Year 2020 Inspection Schedule
ML19172A01220 June 2019Framatome 2020 Inspection Schedule (Safeguards) Public Letter
ML19189A10010 July 2019Framatome - Letter Transmitting Amendment 13, Approval of Emergency Plan, Version 14.0 (L-2019-EPR-0002)
ML19200A17919 July 2019Framatome, Inc., U.S. Nuclear Regulatory Commission Inspection Report 07001257/2019401
ML19214A1162 August 2019Framatome, Inc., Nuclear Regulatory Commission Integrated Inspection Report 07001257/2019003
ML19301A07625 October 2019Framatome Inc. - U. S. Nuclear Regulatory Commission Integrated Inspection Report 70-1257/2019-004Temporary Modification
ML20030A26129 January 2020Framatome Quarterly IR 2019-005Fire Barrier
Fire Protection Program
ML20059K94626 February 2020Framatome, Inc., Required Reporting of Effluents Per 10 CFR 70.59
ML20062K2432 March 2020Framatome Inc. - Licensee Performance Review NRC Inspection Report 70-1257/2020-005
ML20092N9611 April 2020Request to Extend the Due Date for Submitting Doe/Nrc Forms 742, 742C, and NRC Form 327 Following Inventory at Framatome Inc.'S Richland, Washington Site; License No. SNM-1227, Docket No. 70-1257COVID-19
ML20093D1622 April 2020Resubmittal of Request to Extend the Due Date for Submitting Doe/Nrc Forms 742, 742C, and NRC Form 327 Following Inventory at Framatome Inc., Richland, Washington SiteCOVID-19
ML20099D74215 April 2020NRC Approval of Framatome'S Request for 30-Day Extension for Submitting Material Balance Reports
ML20105A38214 April 2020Framatome Public Meeting Summary 04-07-2020
ML20156A3723 June 2020NRC Form 327 for Framatome Inc
ML20184A2822 July 2020Framatome Inc., - NRC Integrated Inspection Report 701257/2020001 and 701257/2020-002Coronavirus
COVID-19
ML20189A2652 July 2020Framatome 2021 Inspection Schedule Letters
ML20202A56220 July 2020Richland Wa Fuel Fabrication Facility - Submittal of Revised Fundamental Nuclear Material Control Plan
ML20216A6113 August 2020Framatome Request for Exemption from 24-Hour Reporting Requirement of 10 CFR 70.50(b)(1)Exemption Request
ML20245E42114 September 2020Response to Request for Withholding Information FNMCP Version 12 - Framatome
ML20248H48828 August 2020Framatome, Inc. - Required Reporting of Effluents Per 10 CFR 70.59
ML20253A14714 September 2020Acceptance of Framatome Inc.'S Request for Exemption from 10 CFR 70.50(b)(1)and Request for Additional Information
ML20265A30121 September 2020Framatome'S Response to a Request for Additional Information Dated September 14, 2020Exemption Request
ML20275A3365 November 2020Letter: NRC Response Approving Framatome Inc.'S Request for Exemption 10 CFR 70.50 (B) (1)