ML20189A265

From kanterella
Jump to navigation Jump to search
Framatome 2021 Inspection Schedule Letters
ML20189A265
Person / Time
Site: Framatome ANP Richland
Issue date: 07/02/2020
From: Suzanne Dennis
NRC/RGN-II/DFFI/FFB2
To: Travis Tate
Framatome
References
Download: ML20189A265 (5)


Text

July 2, 2020 Timothy Tate, Manager Environmental, Health, Safety, & Licensing Framatome Inc.

2101 Horn Rapids Road Richland, WA 99352-0130

SUBJECT:

FRAMATOME INC. - CALENDAR YEAR 2021 INSPECTION SCHEDULE

Dear Mr. Tate:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Framatome Inc., Richland facility for calendar year 2021.

The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact either Richard Gibson (404-997-4718) or Gregory Goff (404-997-4744) with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

T. Tate 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Suzanne K. Dennis, Acting Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-1257 License No. SNM-1227

Enclosure:

Framatome Inc. - Calendar Year 2021 Inspection Schedule (See Page 2) cc: w/ encl: Distribution via LISTSERV

ML20189A265 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI/PB2 RII:DFFI/PB2 NAME R. Gibson S. Dennis DATE 07/2/2020 07/6/2020 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO FRAMATOME INC. -

CALENDAR YEAR 2021 INSPECTION SCHEDULE OPS1 Dates February 08 - 12, 2021 Location Onsite Number of Inspectors 2 Inspection Procedure (IP) 88020 - Operational Safety MC&A Dates March 15 - 19, 2021 Location Onsite Number of Inspectors 2 Inspection Procedures (IPs) 85401, 85402, 85403, 85404, 85405, 85406, 85407, 85408 NCS1/TRANS Dates May 17 - 21, 2021 Location Onsite Number of Inspectors 2 88015 - Nuclear Criticality Safety Program Inspection Procedures (IPs) 86730 - Transportation of Radioactive Materials EPX Dates June 14 - 18, 2021 (Placeholder)

Location Onsite Number of Inspectors 3 Inspection Procedure (IP) 88051 - Evaluation of Exercises and Drills MC&A OBS Dates July 26 - 30, 2021 (Placeholder)

Location Onsite Number of Inspectors 1 Inspection Procedure (IP) 85404 Enclosure

PHYSEC Dates August 23 - 27 Location Onsite Number of Inspectors 2 Inspection Procedures (IPs) 81810, 81431, 91340 OPS2/PMA Dates September 13 - 17, 2021 Location Onsite Number of Inspectors 3 88020 - Operational Safety Inspection Procedures (IPs) 88070 - Plant Modifications (Annual)

NCS2/FP Dates November 15 - 19, 2021 Location Onsite Number of Inspectors 2 88015 - Nuclear Criticality Safety Inspection Procedures (IPs) 88055 - Fire Protection 2