Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000334/LER-2017-00118 April 2017Inadequate Tornado Missile Protection Identified Due to Non-Conforming Design Conditions
LER 17-001-00 for Beaver Valley Power Station, Unit Nos. 1 and 2 Regarding Inadequate Tornado Missile Protection Identified Due to Nonconforming Design Conditions
Safe Shutdown
Unanalyzed Condition
Tornado Missile
Enforcement Discretion
Probabilistic Risk Assessment
Tornado Generated Missile
Tornado Missile Protection
05000334/LER-2017-00213 September 20171 OF 4
LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions
Tornado Missile
Enforcement Discretion
Probabilistic Risk Assessment
Tornado Generated Missile
Tornado Missile Protection
05000334/LER-2017-0034 January 2018Beaver Valley Power Station Unit 1 Reactor Trip due to Turbine Trip and Automatic Initiation of the Auxiliary Feedwater System
LER 17-003-00 for Beaver Valley, Unit 1, Regarding Reactor Trip due to Turbine Trip and Automatic Initiation of the Auxiliary Feedwater System
05000412/LER-2017-0012 May 2017Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category 1 Piping to Not Seismic Category 1 Piping
LER 17-001-00 For Beaver Valley Power Station, Unit No. 2 Re: Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category l Piping to Not Seismic Category 1 Piping
Unanalyzed Condition
Time of Discovery
Past operability
Enforcement Discretion
Functionality Assessment
Tornado Missile Protection
Large early release frequency
BSEP 10-0056, Independent Spent Fuel Storage Installation - Quality Assurance Program26 April 2010Independent Spent Fuel Storage Installation - Quality Assurance Program
BSEP 11-0021, Independent Spent Fuel Storage Installation - Registration and Use of Cask to Store Spent Fuel7 February 2011Independent Spent Fuel Storage Installation - Registration and Use of Cask to Store Spent Fuel
BSEP 11-0023, Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment21 February 2011Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment
BSEP 11-0025, Registration and Use of Cask to Store Spent Fuel and System Thermal Performance Assessment24 February 2011Registration and Use of Cask to Store Spent Fuel and System Thermal Performance Assessment
BSEP 13-0016, ISFSI - Registration and Use of Cask to Store Spent Fuel12 February 2013ISFSI - Registration and Use of Cask to Store Spent Fuel
BSEP 13-0057, ISFSI - Registration and Use of Cask to Store Spent Fuel5 June 2013ISFSI - Registration and Use of Cask to Store Spent Fuel
BSEP 14-0098, Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel28 August 2014Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel
BSEP 15-0077, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask2 September 2015Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask
BSEP 15-0079, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask23 September 2015Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask
BSEP 15-0081, Regarding Storage of Dry Fuel Under Cask Certificate of Compliance 72-1004, Amendment 1023 September 2015Regarding Storage of Dry Fuel Under Cask Certificate of Compliance 72-1004, Amendment 10
BSEP 16-0033, Registration for Use of General License Spent Fuel Cask12 May 2016Registration for Use of General License Spent Fuel Cask
BSEP 16-0036, Registration for Use of General License Spent Fuel Cask12 May 2016Registration for Use of General License Spent Fuel Cask
BSEP 16-0041, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Cask6 June 2016Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Cask
BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks15 August 2017ISFSI - Registration for Use of General License Spent Fuel Casks
BSEP 17-0076, Registration for Use of General License Spent Fuel Casks6 September 2017Registration for Use of General License Spent Fuel Casks
CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)6 November 2015Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)
CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)25 February 2016Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments14 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsSafe Shutdown
Probabilistic Risk Assessment
Cyber Security
Decommissioning Funding Plan
Large early release frequency
Safeguards Contingency Plan
License Renewal
Fire Protection Program
CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments20 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments
IR 05000334/20010013 March 2010Annual Performance Review and Inspection Plan - Beaver Valley Power Station (Beaver Valley) Units 1 and 2 (05000334-01-001 and 05000412-01-001)Dissimilar Metal Weld
IR 05000334/200101226 February 2002IR 05000334/2001-012, IR 05000412/2001-012, Firstenergy Nuclear Operating Company; Beaver Valley Power Station; Units 1 & 2. Inspection on 02/09/2002. Resident Inspector Report. No Violations NotedSafe Shutdown
Significance Determination Process
Safeguards Contingency Plan
Maintenance Rule Program
IR 05000334/20020011 March 20022002 Annual Assessment Letter - Beaver Valley Power Station Units 1 & 2 (Report 50-334/02-01, 50-412/02-01)
IR 05000334/200200430 May 2002IR 05000334-02-04, IR 05000412-02-04, on 3/31-5/11/2002; Firstenergy Nuclear Operating Company; Beaver Valley Power Station; Units 1 & 2. Resident Inspector ReportSafe Shutdown
Fire Barrier
Stroke time
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Hemyc
Maintenance Rule Program
IR 05000334/200200525 July 2002IR 05000334-02-005; IR 05000412-02-005; on May 12 - June 29, 2002, Firstenergy Nuclear Operating Company; Beaver Valley Power Station; Units 1 & 2. Surveillance TestingSafe Shutdown
Fitness for Duty
High Radiation Area
Contraband
Temporary Modification
Zebra Mussel
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Downpower
IR 05000334/20020066 November 2002IR 05000334-02-006, IR 05000412-02-006, on 06/30/03 - 09/30/03, Firstenergy Nuclear Operating Company, Beaver Valley Power Station, Units 1 and 2. Personnel Performance During Non-routine Plant Evolutions and Surveillance TestingSafe Shutdown
Unanalyzed Condition
High Radiation Area
Fire Barrier
Internal Flooding
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Process Control Program
Maintenance Rule Program
IR 05000334/200200730 January 2003IR 05000334-02-007, IR 05000412-02-007, on 09/29/2002 - 12/28/2002, Beaver Valley, Problem Identification & Resolution, and Event Follow-upSafe Shutdown
Boric Acid
Ultimate heat sink
Offsite Dose Calculation Manual
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Maintenance Rule Program
Through-Wall Leak
Scaffolding
Downpower
Operability Assessment
IR 05000334/200201015 July 2002IR 05000334-02-010 and 05000412-02-010; 06/18-20/2002; Beaver Valley Power Station; Emergency Preparedness Exercise and Performance Indicators
IR 05000334/20020114 October 2002IR 05000334-02-011 and 05000412-02-011; on 08/12-29/02; Firstenergy Nuclear Operating CompanyInternal Flooding
Significance Determination Process
IR 05000334/200201231 October 2002IR 05000334-02-012, IR 05000412/02-012, on 09/16 - 19/2002; Beaver Valley Power Station, Units 1 and 2; Special Inspection of the August 24, 2002, Identification of a Gas Void in the High Head Safety Injection Charging Pump Suction PipingSignificance Determination Process
IR 05000334/20030029 May 2003IR 05000334-03-002, IR 05000412-03-002; Firstenergy Nuclear Operating Company; on 12/29 - 3/29/03; Beaver Valley Power Station, Units 1&2. Maintenance Rule Implementation, Personnel Performance During Non-Routine Plant Evolutions, & Event FSafe Shutdown
Boric Acid
Non-Destructive Examination
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Locked High Radiation Area
Aging Management
Significance Determination Process
Foreign Material Exclusion
Maintenance Rule Program
Continuous fire watch
Scaffolding
Siren
IR 05000334/200300329 July 2003IR 05000334-03-003, IR 05000412-03-003; 03/30/2003 - 06/28/2003; Beaver Valley Power Station, Units 1 & 2; Maintenance Risk Assessments and Emergent Work ControlSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Stroke time
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Power change
Operability Assessment
IR 05000334/200300410 November 2003IR 05000334-03-004, IR 05000412-003-004; on 06/29/2003 - 09/27/2003; for Beaver Valley Power Station, Units 1 and 2Safe Shutdown
Unanalyzed Condition
Boric Acid
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Stroke time
Internal Flooding
Temporary Modification
VT-2
Locked High Radiation Area
Aging Management
Significance Determination Process
Operability Determination
Maintenance Rule Program
Substantial potential for overexposure
Downpower
Operability Assessment
Overexposure
IR 05000334/200300529 January 2004IR 05000334-03-005 and IR 05000412-03-005; on 09/28/2003 - 12/31/2003; for Beaver Valley Power Station, Units 1 & 2; Maintenance Risk Assessment and Emergent Work Control, Refueling and Outage Activities, Event Follow-up, and Cross-Cutting
IR 05000334/200300630 April 2003IR 05000334-03-006, 05000412-03-006; on 02/24 - 04/30/2003; Beaver Valley Power Station, Units 1&2. Emergency Response Organization Augmentation; Supplemental Inspection Report - Violation - White SignificanceCondition Adverse to Quality
Significance Determination Process
Preliminary White Finding
Siren
IR 05000334/200300723 April 2003IR 05000334-03-007, 05000412-03-007 on 03/20/2003, Firstenergy Nuclear Operating Company, Beaver Valley Power Station, Units 1 & 2
IR 05000334/20030088 September 2003IR 05000334-03-008, IR 05000412-03-008, 07/07/2003 - 07/25/2003, Beaver Valley Power Station Units 1 and 2. Biennial Baseline Inspection of Identification and Resolution of ProblemsTemporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
IR 05000334/200300926 November 2003IR 05000334-03-009 and IR 05000412-03-009; on 11/04/2003 - 11/06/2003 for Beaver Valley Power Station; Supplemental Inspection
IR 05000334/20030109 January 2004IR 05000334-03-010 and IR 05000412-03-010 on 11/13/2003 for Beaver Valley, Units 1 and 2, Physical Security Baseline Inspection
IR 05000334/200400310 May 2004IR 05000334-04-003, IR 05000412-04-003, on 01/01/2004 - 03/31/2004, Beaver Valley Power Station Units 1 & 2; Routine Integrated Inspection ReportSafe Shutdown
Unanalyzed Condition
High Radiation Area
Mission time
Internal Flooding
Temporary Modification
Locked High Radiation Area
Operability Determination
Maintenance Rule Program
Scaffolding
Downpower
IR 05000334/200400430 July 2004IR 05000334-04-004, IR 05000412-04-004, on 04/01/2004 - 06/30/2004, for Firstenergy Nuclear Operating Company, Maintenance Rule Implementation, Maintenance Risk Assessment and Emergent Work, Operability Evaluations, Event FollowupSafe Shutdown
Boric Acid
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Operability Determination
Maintenance Rule Program
Hourly Fire Watch
Power change
IR 05000334/20040059 November 2004IR 05000334-04-005 and IR 05000412-04-005, on 07/01/2004 - 09/30/2004 for Beaver Valley Power Station, Units 1 & 2; Flood Protection Measures; Licensed Operator Requalification Program; Operability EvaluationsSafe Shutdown
Time of Discovery
Shutdown Margin
Fire Barrier
Internal Flooding
Past operability
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Design basis earthquake
Large early release frequency
Operability Determination
License Renewal
Earthquake
Maintenance Rule Program
Scaffolding
Operability Assessment
IR 05000334/200400631 January 2005IR 05000334-04-006, IR 05000412-04-006 on 10/01/2004 - 12/31/2004 for Beaver Valley Power Station, Units 1 & 2; Maintenance Rule Implementation and Operability EvaluationsSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
Operability Assessment
IR 05000334/200400720 July 2004IR 05000334-04-007 and 05000412-04-007, on 05/24-28/2004 and 06/07-10/2004; Beaver Valley Power Station, Units 1 and 2; Engineering Team Inspection
IR 05000334/20050026 May 2005IR 05000334-05-002, 05000412-05-002, on 01/01/2005 - 03/31/2005, Beaver Valley Power Station, Units 1 & 2; Operability EvaluationsSafe Shutdown
High Radiation Area
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Earthquake
Maintenance Rule Program
Operability Assessment
Siren
IR 05000334/200500825 January 2006IR 05000334-05-008, IR 05000412-05-008; 10/01/2005 - 12/31/2005; Beaver Valley Power Station, Units 1 & 2; Maintenance Risk Assessment and Emergent Work ControlBoric Acid
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Operability Assessment
IR 05000334/20052013 October 2007Letter to Mr. P. Sena Beaver Valley Power Station - NRC Material Control and Accounting Program Inspection - Report 05000334/2005201 and 05000412/2005201