Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-84-940, Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility11 December 1984Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility
IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl19 November 1984Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl
IA-85-261, Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility3 March 1978Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility
IA-85-362, Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions21 February 1985Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions
IA-85-452, Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance9 July 1984Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities31 December 1980Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for FacilitiesBoric Acid
Systematic Assessment of Licensee Performance
IA-85-562, Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted20 February 1985Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning2 May 1985Forwards Listed Info Re Consideration of Earthquakes in Emergency PlanningSafe Shutdown Earthquake
Earthquake
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl26 April 1982Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl
IA-85-665, Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones25 February 1964Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active ZonesEarthquake
IA-85-668, Partially Withheld Notice of Board Meeting 85-1012 April 1985Partially Withheld Notice of Board Meeting 85-10
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V22 August 1985Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V
IA-86-202, Forwards Documents Gathered by Util at Request of Ofc of Investigation in Conjunction W/Ongoing Investigation of Forgeries & Record Falsifications at Facility16 February 1984Forwards Documents Gathered by Util at Request of Ofc of Investigation in Conjunction W/Ongoing Investigation of Forgeries & Record Falsifications at Facility
IA-86-244, Forwards Ofc of Investigations Rept of Investigation Re 850702 Reactor Criticality & Failure of Util Employees to Inform NRC Resident Inspector of Changed Criticality Status. Summary of Investigation,Now Closed,Given.W/O Encl28 May 1986Forwards Ofc of Investigations Rept of Investigation Re 850702 Reactor Criticality & Failure of Util Employees to Inform NRC Resident Inspector of Changed Criticality Status. Summary of Investigation,Now Closed,Given.W/O Encl
IA-86-245, Discusses 850912 Interview of AB Davis Re 850702 Operator Error at Facility.Davis Would Have Recommended Postponement of NRC Vote for Full Power License If Known of Premature Criticality19 August 1987Discusses 850912 Interview of AB Davis Re 850702 Operator Error at Facility.Davis Would Have Recommended Postponement of NRC Vote for Full Power License If Known of Premature Criticality
IA-86-370, Forwards Enforcement Conference Outline,Util Nuclear Operations Improvement Plan,Slides on Nuclear Operations Improvement Plan & Slides on Jul 1985 Rod Pull Error from 860509 Preliminary Enforcement Conference13 May 1986Forwards Enforcement Conference Outline,Util Nuclear Operations Improvement Plan,Slides on Nuclear Operations Improvement Plan & Slides on Jul 1985 Rod Pull Error from 860509 Preliminary Enforcement Conference
IA-86-373, Advises of 860328 Anonymous Telcon to Provide Listed Info Re Radiation Protection at Facility.Investigation Into Alleged Employment Discrimination Could Not Be Initiated W/O Alleger Identity.Matter Assigned for Resolution3 April 1986Advises of 860328 Anonymous Telcon to Provide Listed Info Re Radiation Protection at Facility.Investigation Into Alleged Employment Discrimination Could Not Be Initiated W/O Alleger Identity.Matter Assigned for ResolutionHigh Radiation Area
IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested8 March 1982Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested
IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets22 September 1986Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets
IA-87-111, Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety19 October 1972Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public SafetySafe Shutdown
IA-87-121, Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code24 June 1982Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils14 July 1983Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by UtilsInternal Flooding
Backfit
IA-87-413, Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews24 February 1987Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit InterviewsHigh Radiation Area
IA-87-449, Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il10 July 1987Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il
IA-87-535, Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct23 January 1986Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct
IA-87-830, Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl19 November 1986Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o EnclSystematic Assessment of Licensee Performance
IA-87-871, Forwards Draft Response to Senator C Levin 870528 Ltr,For Review & EDO Signature.Rg Kunkle 870730 Ltr Re Improvement in Safeteam Encl.Related Info Encl.W/O Stated Response1 July 1987Forwards Draft Response to Senator C Levin 870528 Ltr,For Review & EDO Signature.Rg Kunkle 870730 Ltr Re Improvement in Safeteam Encl.Related Info Encl.W/O Stated Response
IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR21 March 1988Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR
IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl9 March 1988Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted MatlStroke time
IA-88-356, Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl4 May 1987Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl
IA-88-497, Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl24 June 1988Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl
IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 251416 September 1987Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514
IA-89-240, Advises That Region III Ofc Investigative Effort Re P Getschow Qa/Qc Independence at Plant (Allegation Number RIII-86-A-0115) Not Warranted at Present,Per 860708 Discussion W/Et Pawlik Because Wrongdoing Not Alleged9 July 1986Advises That Region III Ofc Investigative Effort Re P Getschow Qa/Qc Independence at Plant (Allegation Number RIII-86-A-0115) Not Warranted at Present,Per 860708 Discussion W/Et Pawlik Because Wrongdoing Not Alleged
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission18 April 1997Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & CommissionSafe Shutdown
Fitness for Duty
Packing leak
High Radiation Area
Ultimate heat sink
Fire Barrier
Contraband
Emergency Lighting
Battery sizing
Deep Dose Equivalent
Fire Protection Program
Fire Watch
Scaffolding
IR 05000117/200401525 July 1985Updates Operating Experience for Plant for 850415-0715. Review Updates Encl 850129 & 0426 Reviews for 841026-850117 & 850117-0415,respectively
IR 05000275/198400721 June 1984Forwards Special Insp Rept 50-275/84-07 Re Performance of Plant Operating Crews,Conducted by Region V,Lll & Eg&G Idaho,Inc.Performance Above Average Compared to Similar Licensed Facilities
IR 05000275/198503630 December 1985Requests NRR Assume Lead Responsibility for Evaluation & Resolution of Unresolved Item 50-275/85-36-04 Re Fire DampersSafe Shutdown
Fire Barrier
Emergency Lighting
Continuous fire watch
Fire Watch
Hourly Fire Watch
IR 05000324/198600728 July 1986Forwards Insp Repts 50-325/86-06,50-324/86-07,50-400/86-43, 50-325/86-18,50-324/86-19 & One Internal Document Re Results of Technical Review Re Region II Actions on Miriello Cases.W/O Encl
IR 05000341/198402328 November 1984Forwards Draft SALP Rept 50-341/84-23 to Be Used as Basis for Board Meeting Scheduled on 841130.Comments Should Be Solicited from Staff Having Insp Responsibility During Oct 1983 - Sept 1984 Assessment Period
IR 05000341/198500715 March 1985Forwards Insp Rept 50-341/85-07 Re Safeteam Interview 543, Per 840605 Request.Notification of Action Initiated,If Any, Requested.W/O Encl
IR 05000341/198704216 November 1987Discusses 870923-24 Meetings Between Electrical Sys Branch & Licensee Re LPCI Swing Bus Design Deficiency Revealed by 870908 Operator Error.Nrr Finds Licensee Design Changes Acceptable,Affirming Conclusions of Insp Rept 50-341/87-42
IR 05000397/19870061 July 1987Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept
IR 05000400/198504814 July 1986Notifies of Ofc of Investigations Discontinuance of Inquiry Q2-85-021 & Related Area of Interest as to Matter Contained in Insp Rept 50-400/85-48.Insp Rept & Notice of Violation May Be Released
IR 05000410/19830062 December 1983Discusses 830422 Anonymous Allegation Re Deficiencies in Emergency Diesel Generator Sys,Radiation Containment Sys & Qualifications of Contract Personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06)
IR 05000445/19780209 February 1979Corrects Notice of Deviation Re Insp Rept 50-445/78-20,per Util 790209 Response
IR 05000454/198303827 January 1984Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo
IR 05000456/198402120 December 1985Ack Receipt of Mcgregor 851202 Memo Re Internal Cleanliness of safety-related Sys.Requests Confirmation of Position That New Violations in Addition to Variables Identified in Insp Repts 50-456/84-21 & 50-457/84-20 Should Be Issued
IR 05000456/19860096 March 1986Comments on Portions of Insp Repts 50-456/86-09 & 50-457/86-08.Statements Re safety-related Equipment on Page 12 Should Be Clarified.Requests Verification That Statement Re Cap Screws on safety-related Equipment True
IR 05000456/19860656 April 1987Forwards 870323 Insp Repts 50-456/86-65 & 50-457/86-49, Documenting Results of Region III Investigation of Allegation RIII-86-A-0199 Received on 870114 from Applicant Contractor Employee.W/O Encl.Related Correspondence
IR 05000482/198301326 July 1983Informs That Allegation 4-83-A-17 Re Improper Use of white-out Unsubstantiated.Forwards Insp Rept 50-482/83-13. Engineering Section Insp to Be Conducted.W/O Encl